All (10115)
Flashcards (98)
flashcards
Aleaciones con el aluminio
5
Updated 12d ago
0.0(0)
flashcards
Iceberg demonstrates the relationship between direct and indirect costs of accidents, showing that on average, indirect costs exceed direct costs. Examples of indirect costs include: - a) Overhead costs - b) Schedule delays - c) **Medical costs** (DIRECT COST) - d) Cleanup time ## 7. Geometric Sequences - **Sequence Identification:** The proper arrangement of the following shapes by their complexity is: I. Quadrilateral II. Parallelogram III. Rectangle IV. Square. - a) II, IV, III, I - b) I, II, III, IV - c) IV, III, II, I - d) I, III, II, IV ## 8. Building Use Classification - The term **Occupancy** refers to a type of use of a building for interior space such as an office, restaurant, private residence, or school, grouped based on similar life-safety characteristics, fire hazards, and combustible contents. - a) Building elements - b) **Occupancy** - c) Building Code - d) Accommodation ## 9. Construction Pit Transport Fees - The maximum distance, as specified in the construction contract, which the contractor is expected to transport soil material without receiving additional payment, is known as **Freehaul distance**. - a) **Freehaul distance** - b) Overhaul distance - c) Haul distance - d) Baseline distance ## 10. Retarder Application Principles - **Fundamental Principles for Upper Retarders:** The retarder should be as near as possible to the warm side of the insulation or the warm face of the assembly. Moreover, it should be installed using a method appropriate for the specific condensation hazard. ## 11. Material Characteristics - **Hardness**: A measure of a material's ability to resist indentation or penetration. - a) **Hardness** - b) Ductility - c) Toughness - d) Resilience ## 12. Soil Density Changes - **Consolidation**: An increase in the soil density of cohesive soil resulting from the expulsion of water from the soil's void spaces. - a) Segregation - b) **Consolidation** - c) Compaction - d) Soil Stabilization ## 13. Concrete Finishing Process - The correct step-by-step process of finishing standard weight concrete slabs is as follows: 1. Bleeding 2. Screeding 3. Leveling 4. Edging 5. Jointing 6. Floating 7. Troweling 8. Broom finishing ## 14. Safety Oversight Authority - The entity given authority to review reports of inspection, accident investigations, and the implementation of the program is the **Health and Safety Committee**. - a) **Health and Safety Committee** - b) DOLE - c) DPWH - d) BFP ## 15. Soil Grouting Process - The process of injecting any agent into soil or rock to increase its strength or stability, protect foundations, or reduce groundwater is termed **Grouting**. - a) **Grouting** - b) Pumping - c) Bleeding - d) Screeding ## 16. Construction Safety Program Requirements - Every construction project must have a suitable **Construction Safety and Health Program**, which adheres to the rules and orders issued by the DOLE. - a) **Construction Safety and Health Program** - b) Occupational Health and Safety Program - c) Occupational Safety and Health Administration - d) Workplace Safety and Procedures ## 17. Safety Sight Distance and Vehicle Characteristics - One of the provisions for safety sight distance is dependent on the characteristics of the vehicle, including: - I. Type of vehicle (car or truck) - II. Friction between the tire and road - III. Eye height of the driver - IV. Speed of the vehicle - a) I only - b) II and III only - c) IV only - d) **All of the above** ## 18. Concrete Leveling Technique - **Screeding** is the process to level a floor or layer of concrete with a straight edge using a back and forth motion while moving across the surface. - a) Troweling - b) **Screeding** - c) Floating - d) Finishing ## 19. Structural Support Types - A structure driven into the soil to support construction by transferring building loads to a deeper and stronger layer of soil or rock is referred to as a **Pile**. - a) Caisson - b) Pier - c) Shoring - d) **Piles** ## 20. Road User Guidance Signs - **Guide signs** inform and advise road users of directions, distances, routes, and the location of services. - a) Cross road sign - b) **Guide signs** - c) Advance direction signs - d) Traffic instruction signs ## 21. Delay Concept in Transportation - The **Delay** refers to the difference between the actual travel time and the ideal travel time for a segment of the transportation system. - a) Queue time - b) Travel time - c) **Delay** - d) Service time ## 22. Construction Instructions - **Specifications** are written instructions detailing how a facility is to be constructed. - a) **Specifications** - b) Estimates - c) Bid documents - d) Plans ## 23. Tidal Wave Phases - The interval referring to the time delay in highest tide for each location due to cosmic forces and friction is called the **Age of Tides**. - a) **Age of Tides** - b) Lunar tide - c) Diurnal tide - d) Semi-diurnal tide ## 24. Road Environment Factors and Safety Sight Distance - The provision for safety sight distance is influenced by the following characteristics of the road environment: - I. Road geometry - II. Road surface - III. Road illumination at night - IV. Road topography - a) I and IV only - b) I, II, and III only - c) II and IV only - d) **All of the above** ## 25. Pavement Cracking Types - **Transverse cracking** occurs at right angles to the pavement centerline due to shrinkage or differential thermal stress of the asphalt concrete or reflective cracks. - a) Alligator cracking - b) Block cracking - c) **Transverse cracking** - d) Longitudinal cracking ## 26. Pavement Surface Wear - **Raveling** refers to the wearing away of the pavement surface caused by dislodging of aggregated particles and binder, often a result of insufficient asphalt binder in the mix. - a) Joint or crack spalling - b) Flushing - c) Bleeding - d) **Raveling** ## 27. Surveying Procedures - **Double centering** is a procedure in a horizontal angle layout that involves turning the angle twice and creating a line of sight for critical points. Not used on every point. ## 28. Fatigue Resistance Measure - **Fatigue resistance** is the measure of a material's ability to withstand cyclic (repeated) stresses, with the risk of fracture occurring without warning, even below yield strength. ## 29. Screeding Definition - **Screeding** is defined as the method of moving a straight-edge back and forth with a saw-like motion across the forms to finish concrete surfaces. ## 30. Hazard Definition - A **Hazard** is defined as a source or situation that poses a potential risk for harm, injury, or damage to health, property, or the environment. ## 31. Risk Definition - **Risk** is defined as a human action that deviates from commonly accepted safe procedures that may result in an accident; it requires adherence to a suitable Construction Safety and Health Program, per DOLE requirements. ## 32. Loading Zones - **Loading and unloading zone markings** must be red in color. ## 33. Project Definition - A **Project** is a series of activities with specified objectives that have defined start and end dates, monitored planning, and resource consumption, including money, labor, and equipment. - a) **All of the above** - b) I, II, IV, and V - c) I, II, and IV - d) I, III, and V ## 34. Contract Changes - The following reasons may cause a contract change, except for: - a) Unforeseen conditions - b) **Poor jobsite productivity** - c) A change in owner requirements - d) Designer omission or error ## 35. Road Condition Characteristics - Factors affecting safety sight distance based on the road environment include: - I. Road geometry-grade and curvature sight limitations - II. Road surface-sealed or unsealed, and its smoothness - III. Road illumination at night - IV. Road topography - a) I, II, and III only - b) **All of the above** - c) I, III, and IV only - d) II, III, and IV only ## 36. Structural Properties in Coastal Construction - Key structural properties vital for material selection in harbor and coastal construction include: - I. Specific gravity - II. Material strength - III. Resistance to cyclical impact loading - IV. Resistance to seismic forces - V. Material flexibility - VI. Structural size - a) I, II, and III only - b) IV, V only - c) I, III, and IV only - d) **All of the above** ## 37. Piling Definition - **Piles** are structural components driven into the soil transferring building loads to deeper and stronger soil or rock layers. ## 38. Trip Definition - A **Trip** is defined as the basic unit of travel behavior, involving movement from a single origin to a single destination, characterized by origins, destinations, purposes, and travel modes. ## 39. Signal Coordination - **Signal coordination** involves timing signals in relation to one another, allowing vehicles traveling at a determined speed to pass through successive green lights. ## 40. Rumble Strip Purpose - A **Rumble strip** is a type of thermoplastic lane marking that provides motorists with visual, audio, and motion warnings on the road. ## 41. Grade Resistance - **Grade resistance** represents the component of vehicle weight that acts parallel to an inclined surface. ## 42. Hazard Circumstances - **Hazard** refers to circumstances that deviate from standard conditions, permitting occurrences of accidents or incidents. ## 43. Demolition Area Restrictions - During demolition, no one except workers directly engaged in demolition shall enter an area within a distance equal to 1.5 times the height of the structure being demolished. ## 44. Logistic Definition - **Logistics** refers to the strategic management of resources, materials, and information to ensure efficient movement and delivery of goods and services. ## 45. Design Speed - **Design speed** refers to the maximum safe speed that can be maintained over a specified section of highway under favorable conditions governed by design features. ## 46. Bid Bond Valid Statement - A valid statement regarding a **bid bond** is that it represents costs incurred by the owner if the bidder fails to enter into a contract. - a) It pays for costs incurred by the bid deadline is mixed. - b) **It represents the costs that the owners incur if the bidder fails to enter into a contract.** - c) It represents costs incurred by subcontractors if the project is underbid. - d) It pays for office overhead costs related to a bid ## 47. Hygroscopic Material Definition - **Hygroscopic** refers to a substance that tends to absorb water from the air. ## 48. Safe Pile Capacity Data - The safe capacity of piles driven by powered hammers is based on data comprising: - I. Average penetration per blow (last six blows) - II. Energy of hammer - III. Weight of hammer - IV. Weight of pile including appurtenances - V. Coefficient of restitution based on pile weight - VI. **All of the above** ## 49. Berth Structure Definition - A **Pier** is a berth structure projecting out from the shoreline. - a) Groin - b) Wharf - c) Breakwater - d) **Pier** ## 50. Road Alignment Signs - **Chevron signs** are used to guide drivers through a change in the horizontal alignment of the road. - a) **Chevron signs** - b) Supplementary signs - c) Guide post signs - d) Delineators ## 51. Road Delineation Devices - Delineation of road alignment includes: - I. Pavement Markings - II. Signs - III. Guide Posts - IV. Reflective delineators - V. Lighting - VI. Curb or other physical devices - a) I, II, II, and IV only - b) I, II, IV, and VI only - c) I, V, V, and VI only - d) **All of the above** ## 52. Properties of Queuing Diagrams - Important properties in queuing diagrams include: - I. The slope of D(t) is the departure rate; the slope of A(t) is the arrival rate. - II. The departure rate cannot exceed the service rate or capacity of the server. It may be less. - III. Cumulative departures can never exceed cumulative arrivals. D(t) can never be above A(t) in the queuing diagram. - IV. When a queue exists, the departure rate equals the service rate. In the absence of a queue, the same rate equals the arrival rate. - V. **All of the above** ## 53. Scaffolding Capacity Brackets - Capacity requirements for all scaffolding must be: - a) At least four times its own weight - b) At least 6 times its own weight - c) At most 6 times its own weight - d) At most 5 times its own weight ## 54. Highway Driver Elements - The essential elements of highway driving are referred to as **Driving Task**, encompassing navigation, guidance, and control. - a) **Driving task** - b) Ergonomics - c) Engineering psychology - d) Range index ## 55. Protective Systems in Excavation - **Protective systems** include methods for protecting workers from cave-ins during excavations, consisting of support systems, sloping, benching systems, and shield systems. - a) **Protective system** - b) Personnel protective system - c) Fall arrest system - d) Level arrest system ## 56. Bucket Volume Definitions - **Bucket load capacity** refers to the volume contained within the bucket outline as determined by the bucket sides. - a) Plate line capacity - b) Water line capacity - c) Heap volume - d) **Bucket load capacity** ## 57. Contract Definition - A **Contract** is defined as a formal or legally binding agreement between two parties. ## 58. Toolbox Meeting Definition - A **Toolbox Meeting** is an informal group discussion that focuses on a specific safety issue, facilitating health and safety culture discussions on job sites. ## 59. Road User Directional Signs - **Guide signs** inform road users about the directions and distances to destinations on their route or intersecting roads. - a) Supplementary signs - b) **Guide signs** - c) Warning signs - d) Stack signs ## 60. Specifications Definition - **Specifications** provide detailed requirements for materials, equipment, and workmanship for projects. - a) **Specifications** - b) Bid documents - c) Estimates - d) Plans ## 61. Damping Capacity - **Damping capacity** is the measure of a material’s ability to absorb or dissipate mechanical vibrations. ## 62. Profile Drawing Definition - A **Profile** is a drawing with elevation as the vertical axis and horizontal distance measured along the centerline as the horizontal axis. ## 63. PERT CPM Network Preparation - When preparing a report on the PERT CPM network in construction, one should consider: - a) Pessimistic time network - b) Optimistic time - c) Probable time - d) **All of the above** ## 64. Post-Construction Resolution - This occurs after completion of construction and the resolution of the majority of punchlist and commissioning issues, known as the **Profile**. ## 65. Concrete Formwork Concept - **Formwork** is necessary for concrete placement to maintain shape before the concrete sets. ## 66. Benching Technique in Excavation - **Benching** is a method of protecting workers from cave-ins by creating a series of horizontal levels or steps in excavated areas. - a) **Benching** - b) Shoring - c) Shielding - d) Fall arrest system ## 67. Concrete Surface Leveling - The process of leveling a concrete surface with enough mortar after screeding is termed **Floating**. - a) **Floating** - b) Edging - c) Leveling - d) Bleeding ## 68. Control Joint Placement in Concrete - **Jointing** involves placing premolded inserts in concrete slabs to control cracking due to shrinkage, immediately after or during edging. - a) Jointing - b) Troweling - c) Leveling - d) Edging ## 69. Safety Barrier Considerations - Reasons to establish a need for safety barriers include: - I. Fore slope and back slope steepness and height - II. Unforgiving hazards within the clear zone - III. Water hazards within the clear zone - a) II only - b) I only - c) II and III only - d) **All of the three** ## 70. Limits on Road Messages - Messages painted on pavement should be limited to **six words or less**. - a) **six words or less** - b) five words or less - c) four words or less - d) three words or less ## 71. Types of Pavement Markings - The four types of pavement and curb markings include: - a) **longitudinal lines, transverse lines, lane lines, and center lines** - b) longitudinal lines, transverse lines, stop lines, & center lines - c) longitudinal lines, transverse lines, transition lines, & stop lines - d) longitudinal lines, transverse lines, other lines, & other markings ## 72. Overtaking Lane Design Considerations - Design considerations for overtaking and climbing lanes include: - I. Initial diverge taper - II. Auxiliary lane length - III. End or merge taper - a) **I, II, & III** - b) I & II only - c) II & III only - d) I & III only ## 73. Road Density Definition - **Density** is defined as the number of vehicles per unit distance occupying a roadway section at a given instant in time, measured in vehicles per mile or kilometer. - a) flow - b) **density** - c) capacity - d) volume ## 74. Continuous Waterfront Structure - A **Wharf** is a continuous structure built parallel to the shoreline for loading and unloading ships. - a) pier - b) **wharf** - c) port - d) lighthouse ## 75. Vertical Design Factors - The minimum **K value** for sag vertical should be based on the following factors: - I. Safety sight distance for drivers - II. Appearance in low fill and flat areas - III. Riding comfort, especially at floodway approaches - IV. Vertical alignment fitting into natural terrain. - a) I, II, & III only - b) I, III, & IV only - c) I, II, & IV only - d) II, III, & IV only ## 76. Rumble Strip Definition - A **Rumble strip** is a thermoplastic lane marking designed for visual, audio, and motion warnings for motorists on the road. - a) regulatory signs - b) diagonal marking - c) chevron marking - d) **rumble strip** ## 77. Lane Line Continuation Rules - Lane lines must not be continued in the following scenarios: - I. Across signalized intersections, where low priority road lines must be discontinued. - II. Across side street entrances, except for one-way streets. - III. Past the start of the taper at multi-lane road narrows. - IV. On roads with more than two lanes without median islands. - a) I, II, & IV - b). I, II, & IV - c) II, III, & IV - d) I, II, and III ## 78. Directional Information Signs - **Guide signs** serve to inform road users about directions, distances to destinations, and service locations. - a) **guide signs** - b) warning signs - c) regulatory sign - d) traffic sign ## 79. Benefits of Shoulder Paving - **Shoulder paving** offers: - I. Integrity of the pavement - II. Width for edge line pavement markings - III. Enhanced safety to prevent vehicle skidding - IV. Lower maintenance costs compared to paved shoulders - a) I, III, & IV only - b) **all of the above** - c) I, II, & III only - d) II, III, & IV only ## 80. Structures Built into the Sea - A **Pier** is defined as a structure built into the sea but not aligned parallel to the coastline, which serves various purposes for vessels. - a) lighthouse - b) port - c) **pier** - d) wharf ## 81. Navigable Water Definitions - A navigable body of water leading to a harbor is referred to as a **Channel**. - a) fairway - b) **channel** - c) shoal - d) significant depth ## 82. Types of Curves in Roads - **Vertical curves** are typically parabolas centered around the point of intersection of vertical tangents they connect. - a) **vertical curve** - b) vertical tangent - c) spiral curve - d) grade ## 83. Wind-Generated Waves - Waves under wind influence are referred to as **Sea waves**. - A. Wakes - B. **Sea** - C. Swells - D. Seiching ## 84. Traffic Flow Rate - The **Capacity** refers to the maximum sustained rate of flow for vehicles (passenger cars per hour per lane) under uniform conditions on a freeway segment. - A. Density - B. Traffic flow - C. **Capacity** - D. Design hourly volume ## 85. Hazardous Condition Warnings - **Warning signs** inform road users about hazardous or unexpected road conditions. - A. Roadwork signs - B. **Warning signs** - C. Traffic signs - D. Guide signs ## 86. Purpose of Edge Lines - The purpose of **edge lines** includes discouraging shoulder travel, enhancing safety at night, guiding past hazards, and delineating the edge of the traveled way from the shoulder. - A. I - B. IV - C. V - D. II ## 87. Road Capacity Measurement - **Road capacity** is the maximum number of vehicles expected to pass over a given section of a roadway in one direction during one hour. - A. **Road capacity** - B. Flow of traffic - C. Density - D. Free flow ## 88. High-Rise Building Cleaners - For window cleaners of high-rise buildings, **Slung Scaffold** is most appropriate for providing a suspended working platform. - a) Birdcage Scaffold - b) **Slung Scaffold** - c) Cantilever Scaffold - d) Trestle Scaffold ## 89. Leading Workplace Fatalities - **Falls** are the leading cause accounting for more than 50% of workplace fatalities. - a) Slips - b) Trips - c) **Falls** - d) Electrocution ## 90. Excavation Material Placement - Excavated material should be kept from the excavation edge at a distance not less than **1/4** of the excavation depth. - a) **1/4** - b) 1/3 - c) 1/2 - d) 2/3 ## 91. Temporary Vertical Support Definition - **Dead Shore** refers to temporary vertical support installed directly beneath structural elements while repairs or foundation work is conducted. - A. **Dead Shore** - B. Lateral Bracing - C. Cantilever Prop - D. Raking Shore ## 92. Building Information Modeling - **Building Information Modeling** (BIM) is a 3D model-driven process generating a digital representation of facility features, supporting informed decision-making throughout its lifecycle. - A. CAD Drafting - B. **Building Information Modeling** - C. GIS Mapping - D. Structural Analysis Software ## 93. Operating Costs in Contracting - **Operating Cost** refers to expenses incurred while using equipment for project execution, including repair costs, parts replacement, fuels, labor, and storage. - A. I, II, III, IV - B. I, II, III, IV, V - C. I, II, III - D. II, III, IV ## 94. Water Supply Pipe Terminology - In a water supply system, the vertical pipes are referred to as **risers**, and the horizontal pipes as **branches**. - A. branches and risers respectively - B. **risers and branches respectively** - C. roughing ins and connections respectively - D. connections and roughing ins respectively ## 95. Joint Sealant Definition - A **Joint Sealant** is a rubber or rubber-like material used to fill and seal joints or openings, either alone or with other materials. - A. Grout - B. **Joint Sealant** - C. Adhesive - D. Mortar ## 96. Demolition Area Entry Restriction - During demolition, no one except those engaged in the work shall enter an area within a distance of **1.5 times the height** of the structure being demolished. - A. 1.2 times the height of the structure - B. 2.0 times the height of the structure - C. **1.5 times the height of the structure** - D. 3.0 times the height of the structure ## 97. Vertical Pipe Definition - A **Riser** is a vertical pipe used to transport fluids between different floors of a building. - A. Drain - B. Conduit - C. **Riser** - D. Vent ## 98. Plan View Definition - A **Plan View** is a scaled drawing representing the layout of a structure as seen from above, detailing the arrangement of spaces, walls, and features. - A. **Plan View** - B. Section View - C. Isometric View - D. Elevation View ## 99. Corrosion-Resistant Coating - **Epoxy** is a common protective coating for enhancing corrosion resistance and durability of pipes and appliances. - A. **Epoxy** - B. Latex - C. Polyurethane - D. Acrylic ## 100. Surveying Type Acknowledgment - **Geodetic Surveying** is the type of surveying that takes the curvature of the Earth into account. - A. **Geodetic Surveying** - B. Plane Surveying - C. Topographic Surveying - D. Hydrographic Surveying ## 101. Competency Standards Defined - **Competency Standards** define the required skills, knowledge, and attitudes necessary for effective job performance in the workplace. - A. Work Ethics - B. **Competency Standards** - C. Training Manuals - D. Job Description ## 102. Concrete Retarder Example - A commonly used chemical compound as a retarder in concrete is **Calcium lignosulphonate**. - A. Calcium chloride - B. Aluminum powder - C. Potassium carbonate - D. **Calcium lignosulphonate** ## 103. Sub-base Thickness Determination - The minimum thickness for one layer of compacted granular sub-base should be **20 cm**. - A. 10 cm - B. **20 cm** - C. 15 cm - D. 12 cm ## 104. Hazard Control Classification - The type of hazard control that involves replacing a toxic or hazardous material with a less harmful one is termed **Substitution**. - A. **Substitution** - B. Elimination - C. Engineering Control - D. Administrative Control ## 2. Substitution - B. Elimination - C. Engineering Control - D. Administrative Control ## 2. Substitution - B. Elimination - C. Engineering Control - D. Administrative Control
4
Updated 12d ago
0.0(0)
flashcards
Iceberg demonstrates the relationship between direct and indirect costs of accidents, showing that on average, indirect costs exceed direct costs. Examples of indirect costs include: - a) Overhead costs - b) Schedule delays - c) **Medical costs** (DIRECT COST) - d) Cleanup time ## 7. Geometric Sequences - **Sequence Identification:** The proper arrangement of the following shapes by their complexity is: I. Quadrilateral II. Parallelogram III. Rectangle IV. Square. - a) II, IV, III, I - b) I, II, III, IV - c) IV, III, II, I - d) I, III, II, IV ## 8. Building Use Classification - The term **Occupancy** refers to a type of use of a building for interior space such as an office, restaurant, private residence, or school, grouped based on similar life-safety characteristics, fire hazards, and combustible contents. - a) Building elements - b) **Occupancy** - c) Building Code - d) Accommodation ## 9. Construction Pit Transport Fees - The maximum distance, as specified in the construction contract, which the contractor is expected to transport soil material without receiving additional payment, is known as **Freehaul distance**. - a) **Freehaul distance** - b) Overhaul distance - c) Haul distance - d) Baseline distance ## 10. Retarder Application Principles - **Fundamental Principles for Upper Retarders:** The retarder should be as near as possible to the warm side of the insulation or the warm face of the assembly. Moreover, it should be installed using a method appropriate for the specific condensation hazard. ## 11. Material Characteristics - **Hardness**: A measure of a material's ability to resist indentation or penetration. - a) **Hardness** - b) Ductility - c) Toughness - d) Resilience ## 12. Soil Density Changes - **Consolidation**: An increase in the soil density of cohesive soil resulting from the expulsion of water from the soil's void spaces. - a) Segregation - b) **Consolidation** - c) Compaction - d) Soil Stabilization ## 13. Concrete Finishing Process - The correct step-by-step process of finishing standard weight concrete slabs is as follows: 1. Bleeding 2. Screeding 3. Leveling 4. Edging 5. Jointing 6. Floating 7. Troweling 8. Broom finishing ## 14. Safety Oversight Authority - The entity given authority to review reports of inspection, accident investigations, and the implementation of the program is the **Health and Safety Committee**. - a) **Health and Safety Committee** - b) DOLE - c) DPWH - d) BFP ## 15. Soil Grouting Process - The process of injecting any agent into soil or rock to increase its strength or stability, protect foundations, or reduce groundwater is termed **Grouting**. - a) **Grouting** - b) Pumping - c) Bleeding - d) Screeding ## 16. Construction Safety Program Requirements - Every construction project must have a suitable **Construction Safety and Health Program**, which adheres to the rules and orders issued by the DOLE. - a) **Construction Safety and Health Program** - b) Occupational Health and Safety Program - c) Occupational Safety and Health Administration - d) Workplace Safety and Procedures ## 17. Safety Sight Distance and Vehicle Characteristics - One of the provisions for safety sight distance is dependent on the characteristics of the vehicle, including: - I. Type of vehicle (car or truck) - II. Friction between the tire and road - III. Eye height of the driver - IV. Speed of the vehicle - a) I only - b) II and III only - c) IV only - d) **All of the above** ## 18. Concrete Leveling Technique - **Screeding** is the process to level a floor or layer of concrete with a straight edge using a back and forth motion while moving across the surface. - a) Troweling - b) **Screeding** - c) Floating - d) Finishing ## 19. Structural Support Types - A structure driven into the soil to support construction by transferring building loads to a deeper and stronger layer of soil or rock is referred to as a **Pile**. - a) Caisson - b) Pier - c) Shoring - d) **Piles** ## 20. Road User Guidance Signs - **Guide signs** inform and advise road users of directions, distances, routes, and the location of services. - a) Cross road sign - b) **Guide signs** - c) Advance direction signs - d) Traffic instruction signs ## 21. Delay Concept in Transportation - The **Delay** refers to the difference between the actual travel time and the ideal travel time for a segment of the transportation system. - a) Queue time - b) Travel time - c) **Delay** - d) Service time ## 22. Construction Instructions - **Specifications** are written instructions detailing how a facility is to be constructed. - a) **Specifications** - b) Estimates - c) Bid documents - d) Plans ## 23. Tidal Wave Phases - The interval referring to the time delay in highest tide for each location due to cosmic forces and friction is called the **Age of Tides**. - a) **Age of Tides** - b) Lunar tide - c) Diurnal tide - d) Semi-diurnal tide ## 24. Road Environment Factors and Safety Sight Distance - The provision for safety sight distance is influenced by the following characteristics of the road environment: - I. Road geometry - II. Road surface - III. Road illumination at night - IV. Road topography - a) I and IV only - b) I, II, and III only - c) II and IV only - d) **All of the above** ## 25. Pavement Cracking Types - **Transverse cracking** occurs at right angles to the pavement centerline due to shrinkage or differential thermal stress of the asphalt concrete or reflective cracks. - a) Alligator cracking - b) Block cracking - c) **Transverse cracking** - d) Longitudinal cracking ## 26. Pavement Surface Wear - **Raveling** refers to the wearing away of the pavement surface caused by dislodging of aggregated particles and binder, often a result of insufficient asphalt binder in the mix. - a) Joint or crack spalling - b) Flushing - c) Bleeding - d) **Raveling** ## 27. Surveying Procedures - **Double centering** is a procedure in a horizontal angle layout that involves turning the angle twice and creating a line of sight for critical points. Not used on every point. ## 28. Fatigue Resistance Measure - **Fatigue resistance** is the measure of a material's ability to withstand cyclic (repeated) stresses, with the risk of fracture occurring without warning, even below yield strength. ## 29. Screeding Definition - **Screeding** is defined as the method of moving a straight-edge back and forth with a saw-like motion across the forms to finish concrete surfaces. ## 30. Hazard Definition - A **Hazard** is defined as a source or situation that poses a potential risk for harm, injury, or damage to health, property, or the environment. ## 31. Risk Definition - **Risk** is defined as a human action that deviates from commonly accepted safe procedures that may result in an accident; it requires adherence to a suitable Construction Safety and Health Program, per DOLE requirements. ## 32. Loading Zones - **Loading and unloading zone markings** must be red in color. ## 33. Project Definition - A **Project** is a series of activities with specified objectives that have defined start and end dates, monitored planning, and resource consumption, including money, labor, and equipment. - a) **All of the above** - b) I, II, IV, and V - c) I, II, and IV - d) I, III, and V ## 34. Contract Changes - The following reasons may cause a contract change, except for: - a) Unforeseen conditions - b) **Poor jobsite productivity** - c) A change in owner requirements - d) Designer omission or error ## 35. Road Condition Characteristics - Factors affecting safety sight distance based on the road environment include: - I. Road geometry-grade and curvature sight limitations - II. Road surface-sealed or unsealed, and its smoothness - III. Road illumination at night - IV. Road topography - a) I, II, and III only - b) **All of the above** - c) I, III, and IV only - d) II, III, and IV only ## 36. Structural Properties in Coastal Construction - Key structural properties vital for material selection in harbor and coastal construction include: - I. Specific gravity - II. Material strength - III. Resistance to cyclical impact loading - IV. Resistance to seismic forces - V. Material flexibility - VI. Structural size - a) I, II, and III only - b) IV, V only - c) I, III, and IV only - d) **All of the above** ## 37. Piling Definition - **Piles** are structural components driven into the soil transferring building loads to deeper and stronger soil or rock layers. ## 38. Trip Definition - A **Trip** is defined as the basic unit of travel behavior, involving movement from a single origin to a single destination, characterized by origins, destinations, purposes, and travel modes. ## 39. Signal Coordination - **Signal coordination** involves timing signals in relation to one another, allowing vehicles traveling at a determined speed to pass through successive green lights. ## 40. Rumble Strip Purpose - A **Rumble strip** is a type of thermoplastic lane marking that provides motorists with visual, audio, and motion warnings on the road. ## 41. Grade Resistance - **Grade resistance** represents the component of vehicle weight that acts parallel to an inclined surface. ## 42. Hazard Circumstances - **Hazard** refers to circumstances that deviate from standard conditions, permitting occurrences of accidents or incidents. ## 43. Demolition Area Restrictions - During demolition, no one except workers directly engaged in demolition shall enter an area within a distance equal to 1.5 times the height of the structure being demolished. ## 44. Logistic Definition - **Logistics** refers to the strategic management of resources, materials, and information to ensure efficient movement and delivery of goods and services. ## 45. Design Speed - **Design speed** refers to the maximum safe speed that can be maintained over a specified section of highway under favorable conditions governed by design features. ## 46. Bid Bond Valid Statement - A valid statement regarding a **bid bond** is that it represents costs incurred by the owner if the bidder fails to enter into a contract. - a) It pays for costs incurred by the bid deadline is mixed. - b) **It represents the costs that the owners incur if the bidder fails to enter into a contract.** - c) It represents costs incurred by subcontractors if the project is underbid. - d) It pays for office overhead costs related to a bid ## 47. Hygroscopic Material Definition - **Hygroscopic** refers to a substance that tends to absorb water from the air. ## 48. Safe Pile Capacity Data - The safe capacity of piles driven by powered hammers is based on data comprising: - I. Average penetration per blow (last six blows) - II. Energy of hammer - III. Weight of hammer - IV. Weight of pile including appurtenances - V. Coefficient of restitution based on pile weight - VI. **All of the above** ## 49. Berth Structure Definition - A **Pier** is a berth structure projecting out from the shoreline. - a) Groin - b) Wharf - c) Breakwater - d) **Pier** ## 50. Road Alignment Signs - **Chevron signs** are used to guide drivers through a change in the horizontal alignment of the road. - a) **Chevron signs** - b) Supplementary signs - c) Guide post signs - d) Delineators ## 51. Road Delineation Devices - Delineation of road alignment includes: - I. Pavement Markings - II. Signs - III. Guide Posts - IV. Reflective delineators - V. Lighting - VI. Curb or other physical devices - a) I, II, II, and IV only - b) I, II, IV, and VI only - c) I, V, V, and VI only - d) **All of the above** ## 52. Properties of Queuing Diagrams - Important properties in queuing diagrams include: - I. The slope of D(t) is the departure rate; the slope of A(t) is the arrival rate. - II. The departure rate cannot exceed the service rate or capacity of the server. It may be less. - III. Cumulative departures can never exceed cumulative arrivals. D(t) can never be above A(t) in the queuing diagram. - IV. When a queue exists, the departure rate equals the service rate. In the absence of a queue, the same rate equals the arrival rate. - V. **All of the above** ## 53. Scaffolding Capacity Brackets - Capacity requirements for all scaffolding must be: - a) At least four times its own weight - b) At least 6 times its own weight - c) At most 6 times its own weight - d) At most 5 times its own weight ## 54. Highway Driver Elements - The essential elements of highway driving are referred to as **Driving Task**, encompassing navigation, guidance, and control. - a) **Driving task** - b) Ergonomics - c) Engineering psychology - d) Range index ## 55. Protective Systems in Excavation - **Protective systems** include methods for protecting workers from cave-ins during excavations, consisting of support systems, sloping, benching systems, and shield systems. - a) **Protective system** - b) Personnel protective system - c) Fall arrest system - d) Level arrest system ## 56. Bucket Volume Definitions - **Bucket load capacity** refers to the volume contained within the bucket outline as determined by the bucket sides. - a) Plate line capacity - b) Water line capacity - c) Heap volume - d) **Bucket load capacity** ## 57. Contract Definition - A **Contract** is defined as a formal or legally binding agreement between two parties. ## 58. Toolbox Meeting Definition - A **Toolbox Meeting** is an informal group discussion that focuses on a specific safety issue, facilitating health and safety culture discussions on job sites. ## 59. Road User Directional Signs - **Guide signs** inform road users about the directions and distances to destinations on their route or intersecting roads. - a) Supplementary signs - b) **Guide signs** - c) Warning signs - d) Stack signs ## 60. Specifications Definition - **Specifications** provide detailed requirements for materials, equipment, and workmanship for projects. - a) **Specifications** - b) Bid documents - c) Estimates - d) Plans ## 61. Damping Capacity - **Damping capacity** is the measure of a material’s ability to absorb or dissipate mechanical vibrations. ## 62. Profile Drawing Definition - A **Profile** is a drawing with elevation as the vertical axis and horizontal distance measured along the centerline as the horizontal axis. ## 63. PERT CPM Network Preparation - When preparing a report on the PERT CPM network in construction, one should consider: - a) Pessimistic time network - b) Optimistic time - c) Probable time - d) **All of the above** ## 64. Post-Construction Resolution - This occurs after completion of construction and the resolution of the majority of punchlist and commissioning issues, known as the **Profile**. ## 65. Concrete Formwork Concept - **Formwork** is necessary for concrete placement to maintain shape before the concrete sets. ## 66. Benching Technique in Excavation - **Benching** is a method of protecting workers from cave-ins by creating a series of horizontal levels or steps in excavated areas. - a) **Benching** - b) Shoring - c) Shielding - d) Fall arrest system ## 67. Concrete Surface Leveling - The process of leveling a concrete surface with enough mortar after screeding is termed **Floating**. - a) **Floating** - b) Edging - c) Leveling - d) Bleeding ## 68. Control Joint Placement in Concrete - **Jointing** involves placing premolded inserts in concrete slabs to control cracking due to shrinkage, immediately after or during edging. - a) Jointing - b) Troweling - c) Leveling - d) Edging ## 69. Safety Barrier Considerations - Reasons to establish a need for safety barriers include: - I. Fore slope and back slope steepness and height - II. Unforgiving hazards within the clear zone - III. Water hazards within the clear zone - a) II only - b) I only - c) II and III only - d) **All of the three** ## 70. Limits on Road Messages - Messages painted on pavement should be limited to **six words or less**. - a) **six words or less** - b) five words or less - c) four words or less - d) three words or less ## 71. Types of Pavement Markings - The four types of pavement and curb markings include: - a) **longitudinal lines, transverse lines, lane lines, and center lines** - b) longitudinal lines, transverse lines, stop lines, & center lines - c) longitudinal lines, transverse lines, transition lines, & stop lines - d) longitudinal lines, transverse lines, other lines, & other markings ## 72. Overtaking Lane Design Considerations - Design considerations for overtaking and climbing lanes include: - I. Initial diverge taper - II. Auxiliary lane length - III. End or merge taper - a) **I, II, & III** - b) I & II only - c) II & III only - d) I & III only ## 73. Road Density Definition - **Density** is defined as the number of vehicles per unit distance occupying a roadway section at a given instant in time, measured in vehicles per mile or kilometer. - a) flow - b) **density** - c) capacity - d) volume ## 74. Continuous Waterfront Structure - A **Wharf** is a continuous structure built parallel to the shoreline for loading and unloading ships. - a) pier - b) **wharf** - c) port - d) lighthouse ## 75. Vertical Design Factors - The minimum **K value** for sag vertical should be based on the following factors: - I. Safety sight distance for drivers - II. Appearance in low fill and flat areas - III. Riding comfort, especially at floodway approaches - IV. Vertical alignment fitting into natural terrain. - a) I, II, & III only - b) I, III, & IV only - c) I, II, & IV only - d) II, III, & IV only ## 76. Rumble Strip Definition - A **Rumble strip** is a thermoplastic lane marking designed for visual, audio, and motion warnings for motorists on the road. - a) regulatory signs - b) diagonal marking - c) chevron marking - d) **rumble strip** ## 77. Lane Line Continuation Rules - Lane lines must not be continued in the following scenarios: - I. Across signalized intersections, where low priority road lines must be discontinued. - II. Across side street entrances, except for one-way streets. - III. Past the start of the taper at multi-lane road narrows. - IV. On roads with more than two lanes without median islands. - a) I, II, & IV - b). I, II, & IV - c) II, III, & IV - d) I, II, and III ## 78. Directional Information Signs - **Guide signs** serve to inform road users about directions, distances to destinations, and service locations. - a) **guide signs** - b) warning signs - c) regulatory sign - d) traffic sign ## 79. Benefits of Shoulder Paving - **Shoulder paving** offers: - I. Integrity of the pavement - II. Width for edge line pavement markings - III. Enhanced safety to prevent vehicle skidding - IV. Lower maintenance costs compared to paved shoulders - a) I, III, & IV only - b) **all of the above** - c) I, II, & III only - d) II, III, & IV only ## 80. Structures Built into the Sea - A **Pier** is defined as a structure built into the sea but not aligned parallel to the coastline, which serves various purposes for vessels. - a) lighthouse - b) port - c) **pier** - d) wharf ## 81. Navigable Water Definitions - A navigable body of water leading to a harbor is referred to as a **Channel**. - a) fairway - b) **channel** - c) shoal - d) significant depth ## 82. Types of Curves in Roads - **Vertical curves** are typically parabolas centered around the point of intersection of vertical tangents they connect. - a) **vertical curve** - b) vertical tangent - c) spiral curve - d) grade ## 83. Wind-Generated Waves - Waves under wind influence are referred to as **Sea waves**. - A. Wakes - B. **Sea** - C. Swells - D. Seiching ## 84. Traffic Flow Rate - The **Capacity** refers to the maximum sustained rate of flow for vehicles (passenger cars per hour per lane) under uniform conditions on a freeway segment. - A. Density - B. Traffic flow - C. **Capacity** - D. Design hourly volume ## 85. Hazardous Condition Warnings - **Warning signs** inform road users about hazardous or unexpected road conditions. - A. Roadwork signs - B. **Warning signs** - C. Traffic signs - D. Guide signs ## 86. Purpose of Edge Lines - The purpose of **edge lines** includes discouraging shoulder travel, enhancing safety at night, guiding past hazards, and delineating the edge of the traveled way from the shoulder. - A. I - B. IV - C. V - D. II ## 87. Road Capacity Measurement - **Road capacity** is the maximum number of vehicles expected to pass over a given section of a roadway in one direction during one hour. - A. **Road capacity** - B. Flow of traffic - C. Density - D. Free flow ## 88. High-Rise Building Cleaners - For window cleaners of high-rise buildings, **Slung Scaffold** is most appropriate for providing a suspended working platform. - a) Birdcage Scaffold - b) **Slung Scaffold** - c) Cantilever Scaffold - d) Trestle Scaffold ## 89. Leading Workplace Fatalities - **Falls** are the leading cause accounting for more than 50% of workplace fatalities. - a) Slips - b) Trips - c) **Falls** - d) Electrocution ## 90. Excavation Material Placement - Excavated material should be kept from the excavation edge at a distance not less than **1/4** of the excavation depth. - a) **1/4** - b) 1/3 - c) 1/2 - d) 2/3 ## 91. Temporary Vertical Support Definition - **Dead Shore** refers to temporary vertical support installed directly beneath structural elements while repairs or foundation work is conducted. - A. **Dead Shore** - B. Lateral Bracing - C. Cantilever Prop - D. Raking Shore ## 92. Building Information Modeling - **Building Information Modeling** (BIM) is a 3D model-driven process generating a digital representation of facility features, supporting informed decision-making throughout its lifecycle. - A. CAD Drafting - B. **Building Information Modeling** - C. GIS Mapping - D. Structural Analysis Software ## 93. Operating Costs in Contracting - **Operating Cost** refers to expenses incurred while using equipment for project execution, including repair costs, parts replacement, fuels, labor, and storage. - A. I, II, III, IV - B. I, II, III, IV, V - C. I, II, III - D. II, III, IV ## 94. Water Supply Pipe Terminology - In a water supply system, the vertical pipes are referred to as **risers**, and the horizontal pipes as **branches**. - A. branches and risers respectively - B. **risers and branches respectively** - C. roughing ins and connections respectively - D. connections and roughing ins respectively ## 95. Joint Sealant Definition - A **Joint Sealant** is a rubber or rubber-like material used to fill and seal joints or openings, either alone or with other materials. - A. Grout - B. **Joint Sealant** - C. Adhesive - D. Mortar ## 96. Demolition Area Entry Restriction - During demolition, no one except those engaged in the work shall enter an area within a distance of **1.5 times the height** of the structure being demolished. - A. 1.2 times the height of the structure - B. 2.0 times the height of the structure - C. **1.5 times the height of the structure** - D. 3.0 times the height of the structure ## 97. Vertical Pipe Definition - A **Riser** is a vertical pipe used to transport fluids between different floors of a building. - A. Drain - B. Conduit - C. **Riser** - D. Vent ## 98. Plan View Definition - A **Plan View** is a scaled drawing representing the layout of a structure as seen from above, detailing the arrangement of spaces, walls, and features. - A. **Plan View** - B. Section View - C. Isometric View - D. Elevation View ## 99. Corrosion-Resistant Coating - **Epoxy** is a common protective coating for enhancing corrosion resistance and durability of pipes and appliances. - A. **Epoxy** - B. Latex - C. Polyurethane - D. Acrylic ## 100. Surveying Type Acknowledgment - **Geodetic Surveying** is the type of surveying that takes the curvature of the Earth into account. - A. **Geodetic Surveying** - B. Plane Surveying - C. Topographic Surveying - D. Hydrographic Surveying ## 101. Competency Standards Defined - **Competency Standards** define the required skills, knowledge, and attitudes necessary for effective job performance in the workplace. - A. Work Ethics - B. **Competency Standards** - C. Training Manuals - D. Job Description ## 102. Concrete Retarder Example - A commonly used chemical compound as a retarder in concrete is **Calcium lignosulphonate**. - A. Calcium chloride - B. Aluminum powder - C. Potassium carbonate - D. **Calcium lignosulphonate** ## 103. Sub-base Thickness Determination - The minimum thickness for one layer of compacted granular sub-base should be **20 cm**. - A. 10 cm - B. **20 cm** - C. 15 cm - D. 12 cm ## 104. Hazard Control Classification - The type of hazard control that involves replacing a toxic or hazardous material with a less harmful one is termed **Substitution**. - A. **Substitution** - B. Elimination - C. Engineering Control - D. Administrative Control ## 2. Substitution - B. Elimination - C. Engineering Control - D. Administrative Control ## 2. Substitution - B. Elimination - C. Engineering Control - D. Administrative Control
4
Updated 12d ago
0.0(0)
flashcards
Extraction of Aluminium
9
Updated 34d ago
0.0(0)
flashcards
Aluminum & Mag. Salt
11
Updated 40d ago
0.0(0)
flashcards
Extraction of Aluminium
7
Updated 41d ago
0.0(0)
flashcards
Aluminum Hydroxide Gel
23
Updated 62d ago
0.0(0)
flashcards
Aluminium alloys
11
Updated 65d ago
0.0(0)
flashcards
prop 1 aluminum
7
Updated 78d ago
0.0(0)
flashcards
Short Answer Long Answer Topics Natural resources Renewable v non-renewable Flow resources Ecological footprint Types of Industry Primary Secondary Tertiary Quaternary Basic v non- basic industries Multiplier effect Using Natural Resources Three Rs: Recycling, Reusing & Reducing How can individuals, government and industries rethink how they use resources? Industries in Canada (Key info) Forestry Farming Fishing Mining Oil & Gas Water Manufacturing Global Trade & Globalization Outsourcing Manufacturing towns 7 factors for manufacturing Free trade Tariff, Protectionism US- Canada Trade, USMCA (formally NAFTA) Disclaimer: All course material is subject to assessment content. The guide helps to focus on key topics. Natural Resources: Renewable V Non-renewable: (Definition) Renewable resources: resources that can be regenerated if used carefully. Ex. Solar energy, Wind energy, Water (hydropower), Geothermal energy, Biomass (plants/wood). (Definition) Non - Renewable resources: resources that are limited and cannot be replaced once they are used up. Coal, Oil, Natural gas, Nuclear fuel (uranium), Metals like copper or iron (they exist in limited amounts). (Definition) Flow Resources: resources that are replaced by natural actions and must be used when and where they occur or be lost. Ex. Sunlight, Wind, Flowing water (rivers), Ocean waves, Tides. Ecological footprint: Definition: An ecological footprint is the amount of land and resources needed to support how people live. Key Points: It includes how much energy, food, and water people use. More consumption means a bigger footprint. A smaller footprint is better for the environment. Types Of Industry: Primary Industry: (also called extractive industry) an industry that focuses on producing or extracting natural resources. This sector includes forest industries, agriculture, mining, and fishing. Ex. Farming, Fishing, Mining, Forestry (logging), Oil and gas extraction. Secondary Industry: an industry that focuses on making things using the products of primary industries. This sector includes manufacturing, construction, and utilities (the provision and distribution of electricity, water, natural gas, etc.). Ex. Car manufacturing,Food processing (factories), Construction (building houses), Clothing factories, Steel production. Tertiary Industry: (also called service or services-providing industry) an industry that focuses on providing services. This sector includes “everything else” that is not included in the primary and secondary industries. Ex.Teaching, Healthcare (doctors, nurses), Retail workers (stores), Transportation (bus drivers, taxi drivers), Restaurants and food services. Quaternary Industry: Special kinds of services--highly specialized knowledge- based or technological services. Research and development departments, computer programmers, accountants etc. Examples include research and development departments, computer programmers, accountants etc. OR Ex. Research and development (scientists in labs), Computer programming / software development, Accountants and financial analysts, Data analysis / big data specialists, Scientific consulting or technical advisory services. Basic V Non-basic Industries: (Definition) Basic Industry: A job that brings money into an economy from somewhere else. Example: manufacturing something in your hometown then selling it somewhere else (Definition) Non-basic Industry: A job that circulates money within an economy. Example: getting your haircut at a local barber (Definition) Multiplier Effect: the increase in total wealth or income that occurs when raw money is injected into an economy. Using Natural Resources: The Three Rs: Recycling, Reusing & Reducing: Reducing: The item is neither purchased nor produced in the first place. Fewer new items are produced. AMOUNT OF RESOURCE SAVINGS: MOST Reusing: The item is used by someone else when you no longer want it. The environmental cost of manufacturing the item is avoided. AMOUNT OF RESOURCE SAVINGS: MORE Recycling: The item is destroyed when you no longer want it, but the material in the item is recovered for reuse. The environmental cost of obtaining the raw materials for the item is avoided. AMOUNT OF RESOURCE SAVINGS: SOME None of the 3Rs: The item is taken to a landfill or burned in an incinerator. AMOUNT OF RESOURCE SAVINGS: NONE How can individuals, government and industries rethink how they use resources?: People, governments, and industries can use resources wisely through choices, laws, incentives, and technology to reduce waste, protect the environment, and improve life Industries In Canada (Key Info): Forestry: Forestry = managing forests for resources and sustainability Covers 32% of Canada, mainly Boreal Forest Challenges: climate change and wildfires Farming: Farming is renewable with sustainable practices Prairies = grains; Ontario = fruits/vegetables/livestock; Quebec = dairy/mixed Challenges: soil loss, erosion, farmland loss, climate change Fishing: Fishing is renewable and important for jobs and food Found on coasts, inland, and Arctic regions Challenges: overfishing; solutions: sustainable practices Mining: Minerals are non-renewable and essential for technology Canada develops partnerships to secure critical minerals Sustainable use meets needs while reducing environmental impact Oil & Gas: Non-renewable: oil, gas, coal; cause greenhouse gases Oil = West Canada; Gas = BC; Coal = 300 million years old Renewable: wind, solar, hydro; more sustainable Water: Fresh water is drinkable, used for farming, industry, and energy Makes up ~2.5–3% of the world’s water and is renewable via the water cycle Canada has over 2 million lakes/rivers, with ~9% of the world’s freshwater Manufacturing: Outsourcing: Definition: Outsourcing is when a company moves part of its operation (e.g., manufacturing or IT support) to another country to take advantage of cheaper labour costs and/or less stringent labour and environmental controls. How does Outsourcing Impact the Canadian labour market?: It impacts the Canadian labour market because it eliminates jobs in Canada because companies move to other countries for cheaper labour. Manufacturing Towns: Definition: A Manufacturing Town is a town that develops primarily because of factories and manufacturing industries. Key Points: People move there for jobs in factories. The town’s economy depends on manufacturing. Often located near raw materials, transportation, or customers to make production easier. 7 Factors for Manufacturing: Factor: Location of Customers Key Takeaways: Companies prefer being close to customers Ensure deliveries arrive on time JIT helps deliver packages on schedule Factor: Proximity to Raw Materials Key Takeaways: Some prefer being near raw materials Raw materials are bulkier than finished goods Processed/frozen products are easier to ship Factor: Availability of Fresh Water and/or Power Key Takeaways: Reliable water and power needed for all manufacturers Aluminum production needs lots of cheap electricity Factor: Labour Supply Key Takeaways: Many products come from China or Bangladesh Skilled workers preferred over many unskilled workers Factor: Transportation Key Takeaways: Effective transportation needed for raw materials and products Method depends on speed and type of goods Factor: Political Factors Key Takeaways: Governments at all levels can influence location Financial incentives may encourage companies to locate in certain areas Factor: Circumstance Key Takeaways: Not all location decisions are logical Factors often focus on minimizing costs and improving efficiency Global Trade & Globalization: Free Trade: Definition: International trade without tariffs or other barriers to trade. Tariff, Protectionism: Tariff Protectionism means using tariffs (taxes on imports) to protect local businesses from foreign competition. Definitions: Tariff: A tax applied to imported goods that is designed to protect domestic manufacturers by making foreign goods more expensive. Protectionism: Protecting local industries, often by making imports more expensive. So together, it’s charging taxes on imports to help local businesses compete. US- Canada Trade, USMCA (formally NAFTA): Mr. Trump signed an updated trade deal called the Canada-United States- Mexico Agreement (CUSMA). CUSMA made it easier and cheaper for the three countries to trade goods and services. CUSMA makes trade cheaper between Canada, U.S., and Mexico Canada and U.S. are major trading partners; most Canadians live near the border Tariffs can backfire, hurting both economies and jobs (NAFTA INFO): NAFTA= trade deal between Canada, U.S, and Mexico that made trading goods and services easier and cheaper; replaced by CUSMA
18
Updated 110d ago
0.0(0)
flashcards
Vas, alumínium
16
Updated 131d ago
0.0(0)
flashcards
Gewinnung von Aluminium
4
Updated 132d ago
0.0(0)
flashcards
MMET 207 Aluminum
15
Updated 132d ago
0.0(0)
flashcards
Group 3: Boron and Aluminium
8
Updated 145d ago
0.0(0)
Users (17)