Layout Strategies

studied byStudied by 0 people
0.0(0)
learn
LearnA personalized and smart learning plan
exam
Practice TestTake a test on your terms and definitions
spaced repetition
Spaced RepetitionScientifically backed study method
heart puzzle
Matching GameHow quick can you match all your cards?
flashcards
FlashcardsStudy terms and definitions

1 / 33

encourage image

There's no tags or description

Looks like no one added any tags here yet for you.

34 Terms

1

develop an effective and efficient system that meets competitive requirements

The objective of layout strategy is to __________.

New cards
2

C,D

New cards
3

Slotting fees are charged by retailers to promote a product.

All of the following are true of slotting fees except:

New cards
4

is a new trend in value-added activities in warehouses

The concept of customizing in a warehouse layout __________.

New cards
5

Cross-docking

Which of the following requires an information system that provides inbound product identification, its destination, and routing of the product to the designed outbound vehicle?

New cards
6

the use of general purpose machines and equipment

One disadvantage of process-oriented layouts arises from __________.

New cards
7

elements of successful servicescapes

Ambient conditions, spatial layout and functionality, and signs, symbols, and artifacts are all __________.

New cards
8

maximizing customer exposure rate maximizes sales and profit

Retail layouts thrive on the notion that __________.

New cards
9

A cruise ship assembly facility

The fixed-position layout would be most appropriate in which of the following settings?

New cards
10

A cruise ship assembly facility

The fixed-position layout would be most appropriate in which of the following settings?

New cards
11

focused work center

When similar products are of significant volume and stable demand, the cell may be organized as a __________.

New cards
12

1.5 minutes

A production line is to be designed to make 500 El-More dolls per day. Each doll requires 11 activities totaling 16 minutes of work. The factor operates 750 minutes per day. The required cycle time for this assembly line is __________.

New cards
13

4

Four hundred and eighty minutes of production time are available per day. Scheduled production is 120 units per day. What is the required cycle time?

New cards
14

maximum time that a product is allowed at each workstation

In assembly line-balancing, cycle time (the ratio of available production time to scheduled production) is the __________.

New cards
15

1 minute

New cards
16

process-oriented

The type of layout which features departments or other functional groupings in which similar activities are performed is __________.

New cards
17

Constructing a highway tunnel or bridge

For which of the following operations would a fixed-position layout be most appropriate?

New cards
18

Flexibility in equipment and labor assignments

Which of the following is true for the process layouts, but false for the product-oriented layouts?

New cards
19

automated storage and retrieval system

ASRS stands for __________.

New cards
20

Decreased use of equipment and machinery

Which of the following is not an advantage of work cells?

New cards
21

maximizing profitability per square foot of floor space

The main goal of retail layout is __________.

New cards
22

Takt times at workstations are dynamic

Which of the following is not one of the factors complicating the techniques for addressing the fixed-position layout?

New cards
23

5

Four hundred and eighty minutes of production time are available per day. The schedule calls for the production of 80 units per day. Each unit of the product requires 30 minutes of work. What is the theoretical minimum number of workstations?

New cards
24

minimizing difficulties caused by material flow variability for each product

The major problem addressed by the process-oriented layout strategy is __________.

New cards
25

Which layout type assumes an adequate volume for high equipment utilization?

New cards
26

Product-oriented layout

Which layout type assumes an adequate volume for high equipment utilization?

New cards
27

Put all the tasks at one station.

What is one sure-fire way to achieve 100% efficiency when balancing a line?

New cards
28

Groups workers, their equipment, and spaces/offices to provide for movement of information

Which of the statements below BEST describes office layout?

New cards
29

low variable cost per unit

The main advantage of a product-oriented layout is typically __________.

New cards
30

warehouse layout

Balancing low-cost storage with low-cost material handling is important to a(n) __________.

New cards
31

This arrangement will help to maximize customer exposure to other items in the store.

What is the primary reason why retailers tend to locate high-draw items around the periphery of the store?

New cards
32
New cards
33
New cards
34
New cards

Explore top notes

note Note
studied byStudied by 1 person
74 days ago
4.0(1)
note Note
studied byStudied by 3 people
113 days ago
5.0(1)
note Note
studied byStudied by 1 person
112 days ago
5.0(1)
note Note
studied byStudied by 472 people
781 days ago
4.0(1)
note Note
studied byStudied by 4 people
148 days ago
5.0(1)
note Note
studied byStudied by 53 people
704 days ago
5.0(1)
note Note
studied byStudied by 5 people
288 days ago
5.0(1)
note Note
studied byStudied by 462 people
156 days ago
4.0(2)

Explore top flashcards

flashcards Flashcard (25)
studied byStudied by 45 people
819 days ago
4.0(1)
flashcards Flashcard (69)
studied byStudied by 111 people
344 days ago
5.0(2)
flashcards Flashcard (45)
studied byStudied by 220 people
111 days ago
5.0(1)
flashcards Flashcard (126)
studied byStudied by 4 people
686 days ago
5.0(1)
flashcards Flashcard (26)
studied byStudied by 14 people
834 days ago
5.0(2)
flashcards Flashcard (98)
studied byStudied by 237 people
370 days ago
5.0(6)
flashcards Flashcard (62)
studied byStudied by 29 people
917 days ago
4.5(2)
flashcards Flashcard (28)
studied byStudied by 4 people
30 days ago
5.0(1)
robot