1
New cards

The architect registered and licensed under R.A. No. 9266, who is directly and professionally responsible for the total design of the project for the client and who shall assume the civil liability for the plans, specifications and contract documents he/she has signed and sealed.

Architect-of-Record

2
New cards

The architect registered and licensed or permitted to practice under R.A. No. 9266, who is professionally and academically qualified and with exceptional or recognized expertise or specialization in any branch of architecture.

Consulting Architect

3
New cards

Existing Organization in the Philippines

Integrated and Accredited Professional Organization

4
New cards

It refers to the intellectual proprietary rights retained by an Architect over any architectural documents/ work that he/she prepares unless there is a written stipulation to the contrary.

Copyright

5
New cards

Involves the detailed planning and design of the indoor/enclosed areas of any proposed building/structure, including retrofit, renovation, rehabilitation or expansion work which shall cover all architectural and utility aspects, including the architectural lay-outing of all building engineering systems found.

Architectural Interiors

6
New cards

Which is the scope of the SPP 204-A?

Evaluation of Construction Work

7
New cards

Which is the scope of the SPP 204-B?

Cost and Time Control

8
New cards

Professional that will sign the Certificate of Completion of a project

Architect in charge of construction

9
New cards

Described as a medium density * usually 3-5 floors, multiple family dwelling

Max R-2

10
New cards

ISA + USA

TOSL

11
New cards

PSO + TOSL

TLA

12
New cards

PSO + ISA

MACA

13
New cards

AMBF / TLA

PSO

14
New cards

It is allowed to have abutment on one (1) side of R-1 lots

TRUE

15
New cards

A certificate bearing a registration number, issued to an individual, by the Professional Regulation Commission through the Board of Architecture, signifying that the individual has successfully passed the Licensure Examination and is registered to practice his/her profession as Architect;

COR

16
New cards

Handrails for PWD

900mm and 700mm

17
New cards

Workstations designed for accessibility shall ensure each

900mm

18
New cards

Years of Civil Liability of Architects

15

19
New cards

Door opening min. width means of egress

710mm

20
New cards

Architect shall respect and help conserve the systems of values and the natural, historic, and cultural heritage of the community in which he/she creates architecture.

Responsibility to the People

21
New cards

Architects’ responsibility without undue delay and reasonable time limit.

Responsibility to the Client

22
New cards

Architects’ responsibility for Basic Minimum Fee in the SPP documents. (double check question)

Responsibility to his Colleagues

23
New cards

Architects’ responsibility shall not render professional services without a professional service agreement.

Responsibility to his Colleagues

24
New cards

Turnabout spaces in dead end corridors for accessibility.

3500mm

25
New cards

Means an architectural drawings, specifications, and other outputs of an Architect that only an Architect can sign and seal consisting, among others, of vicinity maps, site development plans, architectural program, perspective drawings, architectural floor plans, elevations, sections, ceiling plans, schedules, detailed drawings, technical specifications and cost estimates, and other instruments of service in any form;

Architectural Documents

26
New cards

Responsbilities of the PRBOA

Supervise the registration, licensure and practice of architects;

27
New cards

Which is correct?

Both are correct

28
New cards

Which cannot be constructed on public sidewalk?

Both A and B

29
New cards

Student from Switzerland came home to Philippines but calls himself Architect on social media even though he is yet to take the board exam.

Section 25

30
New cards

Signing of architectural drawings by another person.

Section 32

31
New cards

Did Mr. ABC pass or fail the ALE. He scored 49% in one subject and the rest are above 50% with almost line of 9s. (non-verbatim)

Mr. ABC failed (49%)

32
New cards

Ms. DFE convicted of political crime while waiting for the oathtaking.

Refusal of COR and PIC

33
New cards

Maximum slope of ramp if riser is 650mm.

1:15

34
New cards

Maximum slope of ramp if riser is 750mm.

1:20

35
New cards

Compensation of the architect if the project is 15,500,000?

1,550,000

36
New cards

Minimum Temporary Sidewalk Width

1200mm

37
New cards

Maximum distance of entrance to accessible elevator

30m

38
New cards

Scope of the Practice of Architecture

Both A and B

39
New cards

Means a document embodied in the Architects National Code, which defines all aspects of professional service, prescribes minimum basic fees and establishes the rights and obligations of both the Architect and the client;

SPP

40
New cards

Means a document which forms part of the Architects’ National Code which contains the norms and principles governing the practice of the profession of architecture in the highest standards of ethical conduct;

Code of Conduct

41
New cards

A continuous and unobstructed route of exit from one point in a building, structure or facility access and exit discharge.

Means of Egress

42
New cards

(solving)

Inside Lot 336 sqm R-2 12m RROW

What is the AMBF after setbacks?

230

43
New cards

(solving)

Inside Lot 336 sqm R-2 12m RROW

If the PSO of R-2 is 60, what is the TOSL?

134.4

44
New cards

(solving)

Inside Lot 336 sqm R-2 12m RROW

What is the MACA?

302.4

45
New cards

(solving)

Inside Lot 336 sqm R-2 12m RROW

What is the minimum USA

33.6

46
New cards

(solving)

Inside Lot 336 sqm R-2 12m RROW

Firewall?

22.4

47
New cards

The RPF % of an architect in the total PCC rendering Design-Build Services in section 207 of SPP?

7%