ARCC PP PRELIMS ('25-'26)

0.0(0)
studied byStudied by 87 people
0.0(0)
full-widthCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/49

flashcard set

Earn XP

Description and Tags

PRELIMS

Study Analytics
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai

No study sessions yet.

50 Terms

1
New cards

Architect of record

The architect registered and licensed under RA No. 9266, who is directly and professionally responsible for the total design of the project for the client and who shall assume the civil liability for the plans, specifications, and contract documents he/she has signed and sealed

2
New cards

Consulting architect

The architect registered and licensed or permitted to practice under RA No 9266, who is professionally and academically qualified and with exceptional or recognized expertise or specialization in any branch of architecture

3
New cards

Both (Planning, architectural designing and structural conceptualization & Preparation of preliminary, technical, economic, and financial feasibility studies of plans, models, and project promotional services)

Scope of practice of architecture includes

4
New cards

Integrated and Accredited Professional Organization

The existing official national organization of all architects of the Philippines in which all registered Filipino architects shall be members without prejudice to membership in other voluntary professional associations

5
New cards

Standards of professional practice

A document embodied in the architects national code, which defines all aspects of professional service, prescribes minimum basic fees, and establishes the rights and obligations of both the architect and the client

6
New cards

Code of ethical conduct

A document which forms part of the architects national code which contains the norms and principles governing the practice of the profession of architecture

7
New cards

COR

A certificate bearing a registration number, issued to an individual, by the Professional Regulation Commission through the Board of Architecture, signifying that the individual has successfully passed the Licensure Examination and is registered to practice their profession as architect

8
New cards

Architectural documents

Architectural drawings, specifications, and other outputs of an architect that only an architect can sign and seal consisting, among others, vicinity maps, SDPs, architectural program, perspective drawings, floor plans, elevations, sections, ceiling plans,schedules, detailed drawings, technical specifications and cost estimates, and other instruments of service in any form

9
New cards

Copyright

Refers to the intellectual proprietary rights retained by an architect over any architectural documents or work that he/she prepares unless there is a written stipulation to the contrary

10
New cards

Architectural interior

Means a detailed planning and design of the indoor/enclosed areas of any proposed building/structure, including retrofit or renovation work and which shall cover all architectural and utility aspects, including the architectural layouting of all building engineering systems found therein

11
New cards

Supervise the registration, licensure, and practice of architects

The powers and functions of the board of architecture include

12
New cards

None of the above

The qualifications of an applicant for the board exam for architects include

13
New cards

Mr abc failed the ALE

Mr. ABC got a grade of 85% in history and theory, principles of planning and architectural practice; 81% in structural design, building materials, and architectural specifications and methods of construction and utilities; 48% in urban design and architectural interiors; and 91% in architectural design and site planning. Given these grades, which statement is correct?

14
New cards

Mr. DEF cannot be refused the issuance of their COR and PIC

Mr DEF, while waiting for the oathtaking ceremony, was convicted of a political offense. Given this situation, which is correct?

15
New cards

Section 25

Mr GHI, a graduate of BA Architecture from a prestigious university in Switzerland, is currently in the process of having his degree recognized by CHED to quality for the ALE. Despite this, he claims on his professional social media pages that he is an architect. Which provision of RA 9266 is violated?

16
New cards

Section 32

Mr GHI then gained a client. Since he cannot sign and seal the documents yet, he asked Ar. JKL to sign the architectural documents on this behalf. What section of RA 9266 is this violating?

17
New cards

15 years

For how many years will Ar. JKL be held civilly liable for the architectural plans she signed?

18
New cards

Evaluation of construction works

Which of the following is/are within the scope of SPP doc 204-A?

19
New cards

Both (Evaluation of construction works & Cost and time control)

Which of the following is/are within the scope of SPP 204-B?

20
New cards

7%

The recommended professional fee (RPF) for an —- DBS by administration shall be ___% of the Project Construction Cost, exclusive of the Architect’s Fee for the Regular Design Services

21
New cards

Php 1,550,000

Mr. and Mrs. LMN engage Ar. OPQ to design their dream home to be situated on an R-1 zone. Assuming the PCC is PhP 15,500,000.00, how much should Ar. OPQ charge as RPF

22
New cards

The architects responsibility in relation to the people

In the code of ethical conduct, the architect's duty to respect and help conserve the systems of values with the natural, historic, and cultural heritage of the community in which they create architecture falls under which article?

23
New cards

The architects responsibility in relation to their colleagues and subordinates

In the code of ethical conduct, the architects duty to not render professional services without a professional service agreement falls under which article?

24
New cards

The architects responsibility in relation to their clients

In the code of ethical conduct, the architects duty to carry out their professional work without undue delay and within an agreed reasonble time limit falls under which article?

25
New cards

The Architect's responsibility in relation to his/her colleagues and subordinates

In the Code of Ethical Conduct, the Architect's duty to abide by the Basic Minimum Fee prescribed under the "Standards of Professional Practice" falls under which article?

26
New cards

Architect in charge of construction

The licensed professional who shall prepare and submit a certificate of completion of the project, stating its conformity to the code including the approved plans and specifications

27
New cards

Max R-2

A medium density residential use or occupancy characterized as low-rise multilevel building or structure of three to five storeys in height and for use as multiple family dwellings

28
New cards

TOSL

ISA + USA = ?

29
New cards

MACA

PSO + ISA = ?

30
New cards

TLA

PSO + TOSL = ?

31
New cards

PSO

AMBF/TLA = ?

32
New cards

False

Abutment of one side is allowed for any R-1 lot type or location. True or False?

33
New cards

Both (Residential and like uses temporary or permanent & Depository of stalled, wrecked or abandoned vehicles, mechanical devices)

Which of the following uses are not allowed on public easement?

34
New cards

1200 mm

The minimum and allowable width of temporary walkway in case there is no sidewalk in front of the building site during construction

35
New cards

Both are correct (On a non-arcaded arrow/street, signs should not extend more than 1.20 meters over the sidewalk and measured horizontally from the wall line or building line & On arcaded rrow/street, the signs should not project more than 0.60 meters from the uttermost portion)

Which is the correct statement?

36
New cards

Means of egress

A continuous and unobstructed route of exit from one point in a building/structure/facility to a public way consisting of 3 distinct parts

37
New cards

710

Door openings in means of egress shall not be les than ___ mm in clear width

38
New cards

1:15

Maximum slide of an accessible ramp with a rise of 650mm

39
New cards

1:20

Maximum slope of an accessible ramp with a rise of 750mm

40
New cards

900 and 700

Accessible handrails shall be installed at ___mm and ___mm above ramps and stairs

41
New cards

4.00m x 5.00m

Accessible parking slots shall have a dimension of

42
New cards

900

All accessible doors shall have a minimum door width of __mm?

43
New cards

3500

Turnabout spaces shall also be provided at or within __mm of every dead end corrido

44
New cards

30

Accessible elevators shall be located not more __ meters from the entrance and shall be easy to locate with the aid of directional signs

45
New cards

900

Workstations designed for accessibility shall ensure each desk counter is a minimum of __mm wide to provide sufficient space for individuals using wheelchairs or mobility aids

46
New cards

230 sqm

To build his single-attached home, Mr. ABC acquired a 336 square meter rectangular lot in an R-2 basic zone, with a 12 meter frontage facing a 12 meter RROW. Compute:

How many square meters will be left after applying the maximum allowable setback requirements to maximize the lot?

47
New cards

134.40 sqm

To build his single-attached home, Mr. ABC acquired a 336 square meter rectangular lot in an R-2 basic zone, with a 12 meter frontage facing a 12 meter RROW. Compute:

Given the maximum allowable PSO of 60 for R-2 basic with firewall, what is the area of the TOSL?

48
New cards

302.40 sqm

To build his single-attached home, Mr. ABC acquired a 336 square meter rectangular lot in an R-2 basic zone, with a 12 meter frontage facing a 12 meter RROW. Compute:

Given the maximum allowable ISA of 30 for R-2 basic with firewall, compute for MACA

49
New cards

33.60 sqm

To build his single-attached home, Mr. ABC acquired a 336 square meter rectangular lot in an R-2 basic zone, with a 12 meter frontage facing a 12 meter RROW. Compute:

Compute for the minimum USA

50
New cards

22.40 m

To build his single-attached home, Mr. ABC acquired a 336 square meter rectangular lot in an R-2 basic zone, with a 12 meter frontage facing a 12 meter RROW. Compute:

What is the maximum length of firewall allowed for this development?