programming basics
- guestrooms
- guestroom support and circulation
- public space
- back of house
programming priorities
don't oversize or undersize, meet needs of target market, balance needs with project costs
gross guestroom area (GGA)
net guestroom area plus circulation and support
often known as guestroom tower
gross hotel area (GHA)
total area including gross guestroom area, public space, and back of house
*parking and outdoor patios not included
guestroom percentage:
percent of the hotel that is gross guestroom area
GGA/GHA
as you go up in chainscale, guestroom % decreases since there is more public space and back of house
space allocation is driven by
the guestroom bay
bay
standard guestroom module for a hotel
key
rentable hotel unit
door
window
bathroom
hotels often have more bays than keys because
suites are typically larger than one bay
guestrooms
rentable units
support and circulation
corridors, stairs, elevators, BOH, walls, and shafts
Floor Efficiency Ratio (FER)
ratio of rentable space to total floor area expressed as a %
guestroom tower accounts for large % of hotel, so floor efficiency is critical
corridor width directly impacts
floor efficiency
converting from net guestroom area to gross guestroom area
multiply by gross guestroom factor
gross guestroom factor is the reciprocal of the
floor efficiency ratio (FER)
floor efficiency ratio
ratio of rentable space to total floor area expressed as a %
75% FER indicates
floor area is dedicated to revenue generating space
proportion of public space and BOH increases as
quality level increases
during programming phase:
determine net guestroom area with room mix chart
public area program
lobby/dining
lounge/business
function
recreation
public circulation
back of house program
admin
employees
laundry
kitchen
engineering
misc. service
functional relationships and flow best practices
• Keep guests & employee
circulation separate
• Elevator Core centrally
located, adjacent to
housekeeping
• Employee areas & security
adjacent to Loading Dock
• Prioritize safety and security
for both guests & employees
• Consider efficient workflow
when planning
compare programming summary to
industry averages and total allowable buildable area
creating the plan view
building is cut at 4ft above finished floor
plan view
view from above
elevation architectural drawings
front facing view
exterior or interior
- shows heights and architectural detail
• Windowsill & head heights
• Moldings & Trim
• Wall Sconce (Light) Heights
• Height of outlets & switches
• Millwork (woodwork) detail
section architectural drawing
slices through building
- shows vertical relationship of spaces to one another
- floor to floor heights
- ceiling heights
- thickness of walls and structure
heavier line weights
Represent planes that have been "cut through"
- Walls or structure
- The heavier the weight, the denser the material
medium line weights
-represent planes that have been "cut through" but are not as dense
-wood
-window mullions
-doors
light line weights
represent items you are looking down on in plan or looking at in elevation
-stairs
-equipment
-furnishings
-floor pattern (lightest)
dashed lines
are hidden elements either above or below the cut line
- ceiling soffit or coffer
- shelves
- cabinetry
- awning
can also mean "temp" or to be "demolished"
dashed lines indicate line of mezzanine above
architectural scales
scale is determined by size of drawing sheet and level of detail required
the more detail required, the larger the scale
strategy for evaluating plans
1. Identify entrances
2. Locate the elevator core
3. Analyze Flow
Trace Major Paths:
• Arriving Guests
• Meeting Guests
• Employees
Trace Operational Circulation:
• Food & Beverage
• Housekeeping
• Administrative
• Goods Coming In & Out
4. Determine how the floors inter-relate
5. Analyze space allocation
the art of creating experiences
from the approach to the arrival.. the aura of the space and the warm welcome
all elements seamlessly fit, there is attention to detail, you feel immersed and connected
advantages of good design
It functions properly
making an engaging &
healthy, environment for
guests & staff
Provides differential
advantage over
competition
Hotels with a strong
DESIGN CONCEPT enjoy
a bump in ROI
owners hire
architects, interior designers, consultants
architects and interior designers hire
sub-consultants and are responsible for their work
assembling a good team - brands and operators
provide input
assembling a good team-
purchasing agents and contractors bid and implement
design process
1. concept
2. schematic design
3. design development
4. construction docs
5. bidding and negotiations
6. contract admin
design process: concept
often concurrent with feasibility
architect: research zoning code, preliminary site plan, preliminary space planning, stacking diagrams
owners/arch/ID: branding or brand immersion
ID:
inspiration and concept imagery
the lobby triangle
Front desk should be able to see and greet guests entering + see the main elevators
design priorities
sense of arrival, sense of place
public space priorities
• Create an impression
• Front Desk visible upon entry
• Front Desk personal should oversee lobby
• Guest elevators within close proximity to
front desk
• Maximize Views
• Encourage revenue generating opportunities
• Flexible seating groupings for various
functions
o Relaxing
o Working
o Waiting
o Meeting
• Create semi-private opportunities
lobby sizing criteria
LOBBY AREA:
Economy: less than 6 sq. ft. per key
Most Hotels: 6-10 sq. ft. per key
Resorts & Convention: 10-15 sq. ft. per key
FRONT DESK:
• 2 stations for first 150 rooms,
• Plus 1 for each additional 100 rooms
ELEVATORS:
• 2 for first 100 keys
• 1 per additional 100 keys
LOBBY SUPPORT:
• Circulation
• Luggage Storage
• Public Restrooms
design process: schematic design
architect and ID
• Flow & Bubble Diagrams
• Code Search
• Schematic Floor Plans
• Establish floor to floor heights
• Preliminary Elevation or 3d Studies
• Preliminary Material & Finish Palettes
• Preliminary FF&E Selections
limited service hotels
have F&B and meeting space, it's just more limited
designed to minimize staffing
analyzing flow
AVOID:
• Excessive cross traffic
• Back-tracking
• Blind Corners
• Tight spots & bottlenecks
design development
consultant coordination
- redefined floor plans
- consultant details and calculations
- elevation studies and building sections
- 3d modeling
- material and finish palettes
- redefined interior design
- model guestroom
building systems re engineered to work within established architecture
design process - construction documents
construction details
- building on design development and adding more details on constructability
- enlarged plans
- details and millwork drawings
- fixture, hardware, and finish schedules
- written specifications
bidding and negotiations
- drawings issued for construction bids and permitting
- purchasing agent bids FF&E package
- value engineering
- drawing revisions
- final pricing
- construction contract
design team contract administration
design team prepares for and oversees the construction process
- drawing and submittal review
- requests for info
-owner architect contractor meetings
- site visits
- review change orders
contractor mobilization
scheduling, staging job site, ordering materials
construction process - foundations
footings - thick concrete pads the columns or foundation walls sit on
foundation walls - continuous walls of concrete or block that sit on footings
caissons
drill and cast concrete in place
piles
drive wood, pre-cast concrete, or steel piles into ground
construction process: structure
columns, beams, floor system
construction process: enclosure or enevlope
building skin, windows, and roof
resists wind load and waterproofs building
topping off is a milestone in construction, once complete the interior work can begin
construction process: interior framing
build interior partition walls, fireproof steel columns and beams
construction process: building systems rough-in
MEP: Mechanical, electrical, and plumbing
construction process: interior finish
drywall
paint
wallcovering
tile
carpeting
plumbing fixtures
construction punch list
Tracks non-conforming work
construction process: installation
FF&E and OS&E
construction process: commissioning
system testing and training
project closeout
Architects & Interior Designer provide RECORD DOCUMENTS and CAD Files
• Construction Drawings including REVISIONS
• FF&E & General Construction Specifications
Purchasing Agent provides FLAMEPROOF CERTIFICATES for FF&E Purchased
Contractors provide MANUALS & WARANTY information
General contractor
Lead contractor that coordinates, preforms, &
oversees construction work for a FIXED CONTRACT PRICE
• Have superintendents at jobsite that oversee construction
• May have carpenters, laborers, or other trades on staff to perform work
• Sub-contract with other trades for balance of scope: mechanical, electrical,
plumbing, finish work, etc.
construction manager
: Estimators & Project Managers that oversee a
construction project for a % of TOTAL PROJECT COST
• Assists during pre-construction, then oversees construction
• Typically, does NOT have trades on staff to perform work
• Sub-contract with trades for total construction scope
change orders
Contractual method for contractors to receive additional compensation for new or unanticipated construction scope
- contractor writes up estimate for new work
- architect reviews and approves change order
- owner gives final approval for additional compensation
- contractor proceeds with new work
pros of lump sum construction contracts
total cost known ahead of time
good when prices are stable
cons of lump sum construction contracts
CDs must be 90% complete
if GC bids too low, may skimp on quality to save $
change orders are costly
award lump sum contract based on
defined scope of work
bid after construction documents complete to general contractors:
1. Identify qualified General Contractors (GC)
2. Solicit competitive bids
3. Evaluate bids
4. Value engineering
5. Revise contract documents
6. Award construction contract
construction contingency
Percent of funds reserved in a construction budget to cover costs of unforeseen conditions
- mitigating risk with contingency
- approx 5% of construction budget
- for renos or fast track projects, contingency is higher due to higher probability of unforeseen conditions or change orders
- as project risk increases, your contingency should increase
cost plus
cost (time and materials) + an agreed upon % fee
construction contracts: negotiated guaranteed maximum price (GMP)
owner agrees to pay a cost plus - a % markup, up to an agreed guaranteed maximum price (GMP)
- construction manager estimates GMP based on design development documents (70% complete) + contingency
- construction manager bids to subcontractors and discloses bids to project team
pros of negotiated guaranteed maximum price (GMP)
- owners knows maximum price up front
- potential time savings since construction may start before CDs are complete
- some flexibility if prices are unstable
- may have contractual incentives for shared savings
cons of negotiated guaranteed maximum price (GMP)
- initial estimates are "padded" since construction documents are not complete
- may be more costly than LUMP SUM
construction contracts: design build
owner hires a design build firm based on an outlined scope of work
- design build firm is responsible for both design and construction
pros of design build
simplified delivery: one point of contact
owner knows cost up front often based on COST PER SQ FT
Cons of Design-Build
architect and contractor are same entity: no checks and balances
may compromise design or quality to save money
construction contracts: fast track
owner hires a construction manager based on GMP and construction is fast tracked
- CDs are completed and permitted in phases
- construction begins on each phase as CDs are completed (foundations, superstructure, building enclosure, building systems, interiors)
- design and construction phases overlap for considerable time savings
pros of fast track
time savings = money savings
cons of fast track
requires high level of expertise
high potential for change orders
interior build out typically takes longer than
the structure and enclosure
construction methods - wood frame
- simple and fast (relative)
- low level of expertise
- suitable for low-rise buildings only (typically 6 stories max)
construction methods - masonry
• Brick, Stone or Concrete Masonry
Units (CMU)
• Exterior bearing walls
• Suitable for low-rise buildings
• NON-COMBUSTIBLE MATERIAL
• Masonry can be used as "face brick"
which is a non-load bearing "skin
construction methods - cast-in-place concrete
- formed on site
- reinforced with steel
- suitable for high rise
- labor intensive formwork
- non-combustible material
construction methods - precast concrete
- formed and cured off-site
- floor systems or wall systems
- lifted into place
- high level of finish and quality control
- saves construction time in field
- common for prototype brand hotels and some high rise
construction methods - steel framing
- suitable for high rise (12+)
- minimal structural frame
- typically more costly than concrete
- non-combustible material
construction methods - mass timber
- constructed out of laminated wood which increases strength
- very sustainable
- construct up to 18 stories
construction methods - modular construction
- room prefabricated off site and lifted into place
- considerable time savings
- sustainable option - lower emissions and waste