21 Terms

1

Project Management

The application of knowledge, skills, tools and techniques to project activities to meet the project requirements

New cards
2

Project management scheduling techniques

PERT Charts, Critical Path Method, Gantt Charts

New cards
3

Organizations that undervalue Project management report

50% project failure

New cards
4

Does project management ensure that projects are completed n time?

Yes, within budget and with high quality.

New cards
5

Project management is crucial as it provides…

structured approach to achieving organizational goals

New cards
6

What are the 3 phases of project management?

Planning, Scheduling, Controlling

New cards
7

What is WBS

Work Breakdown Structures

New cards
8

Work Breakdown structures (WBS)

A project broken down into smaller, manageable pieces

New cards
9

Why Use a work breakdown structure?

Define dependencies, categoeize work, establish timeline, produce a statement of work (SOW), assign roles, estimate cost

New cards
10

Scheduling techniques

PERT, CPM, PERT + CPM, Gantt Charts

New cards
11

PERT (Program Evaluation Review Technique)

A method of analyzing a project’s tasks, focusing on the time needed to complete each task

New cards
12

PERT uses _ _____ estimates to define __

3 time estimates to define an expected time estimate

New cards
13

3 time estimates (OMP)

Optimisitc, Most-Likely, Pessimistic

New cards
14

E.T Formula

A + n m + b / avg # of components you’re adding up (6 would come from A + B and then n so if n was 4 then 6

New cards
15

PERT Scheduling shows

IF tasks must be completed in order or if they can be completed simultaneously

New cards
16

Is PERT frequently combiend with Critical Path Method?

Yes

New cards
17

Critical Path Method

Scheduling technique to map the sequence of scheduled activities that determines the duration of the project (critical path)

New cards
18

Critical Path is the ____ path taken

longest

New cards
19

Total project duration is the

sum of the individual duration of the critical path activities

New cards
20

T OR F: More tasks in a path does not necessarily mean its the critical path

True

New cards
21
New cards

Explore top notes

note Note
studied byStudied by 101 people
... ago
4.0(1)
note Note
studied byStudied by 27 people
... ago
5.0(1)
note Note
studied byStudied by 1211 people
... ago
4.9(15)
note Note
studied byStudied by 14 people
... ago
5.0(1)
note Note
studied byStudied by 27 people
... ago
4.5(2)
note Note
studied byStudied by 35 people
... ago
5.0(1)
note Note
studied byStudied by 122 people
... ago
5.0(3)
note Note
studied byStudied by 18 people
... ago
5.0(3)

Explore top flashcards

flashcards Flashcard (100)
studied byStudied by 9 people
... ago
5.0(1)
flashcards Flashcard (202)
studied byStudied by 4 people
... ago
5.0(1)
flashcards Flashcard (63)
studied byStudied by 10 people
... ago
5.0(1)
flashcards Flashcard (60)
studied byStudied by 35 people
... ago
5.0(2)
flashcards Flashcard (36)
studied byStudied by 16 people
... ago
5.0(2)
flashcards Flashcard (97)
studied byStudied by 18 people
... ago
5.0(1)
flashcards Flashcard (55)
studied byStudied by 41 people
... ago
5.0(2)
flashcards Flashcard (26)
studied byStudied by 5 people
... ago
5.0(1)
robot