where are construction specifications and drawings submitted to in order to get a permit
the engineering division of the NC department of insurance
if you’re in a section 403 high rise when do building plans need to be approved
all building drawings must be approved
if you’re building a covered mall building when do building plans need to be approved
all building drawings must be approved
in a city/county owned building when do building plans need to be approved
when the building is 20,000 sq/ft or more
In a group A (assembly) building when do building plans need to be approved
when occupant load is over 1,000
in a group E (education) building when do plans need to be approved
when its over 2 stories or over 20,000 sq/ft per story
in a group H (hazard) building when do plans need to be approved
when occupant load is over 100
in a group I (institutional) building when do plans need to be approved
in buildings over 3 stories or over 10,000 sq/ft per story
in a group r (residential) building when do plans need to be approved
if there’s over 4 stories or more than 100 units per building
how are approvals issued from the state
issued in writing or by stamp
what inspections are required in NC
footing, under slab (if applicable), foundation, rough-in, building framing, insulation, fire protection, final inspection
rough in inspection
shall be made when all building framing and parts of the electrical, plumbing, fire protection or heating ventilation or cooling system that will be hidden from view have been placed
building framing inspection
made after the roof, wall ceiling and floor framing is complete w/ appropriate blocking, bracing and firestopping in place
insulation inspection
done after permanent roof is attached
how should work be performed with inspections
the next phase of work cannot happen until the inspection is passed unless you obtained approval of the code enforcement official first
whose job is it to request/schedule inspections
the permit holder
appeals to code must be made ____ days from the date of decision of the State Enforcement agency
30
a notice of appeal must be made to the building code council _____ days prior to the Hearing Committee meeting
15
who can stop a work order
county code officials; they can do so under GS 153A-361
a permit expires after ____ after the date of issue if no work has started on it
6 months
If work is discontinued for ____________ the permit immediately expires
12 months
building occupancy loads must be
posted by the owner of the building in each assembly room
any violation of code is a
class 3 misdemeanor