milestones, cadence, WBS

0.0(0)
studied byStudied by 0 people
full-widthCall with Kai
GameKnowt Play
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
Card Sorting

1/11

encourage image

There's no tags or description

Looks like no tags are added yet.

Study Analytics
Name
Mastery
Learn
Test
Matching
Spaced

No study sessions yet.

12 Terms

1
New cards

project milestones

represent critical checkpoints in a project and have a duration of zero days and are typically denoted by a diamond on graphic project schedules

2
New cards

project cadence

determines the frequency and structure of recurring events within a project

3
New cards

work breakdown structure (WBS)

vital document created during the project planning phase that uses the project charter’s deliverables as a starting point

-project management tool that provides a visual representation of a project’s scope, tasks, and deliverable

4
New cards

element

the deliverables in a WBS

5
New cards

work package/terminal element

lowest element in each branch or leg (an element without a child element is a work package)

6
New cards

level

the layer of the WBS where an element resides

7
New cards

numbering scheme/ code of accounts

element that are assigned a number according to its place in the hierarchy

8
New cards

leg

a group of elements with a shared ancestor

9
New cards

branch

one or more elements that do not represent the whole top level element in the branch

10
New cards

mutually exclusive collectively exhaustive (MECE)

an organization and problem solving method

11
New cards

the 100% rule

indicates 100% coverage of the project work without including anything beyond the project’s deliverables and project management work

12
New cards

WBS steps

  1. determine the scope

  2. identify deliverables

  3. identify team members

  4. build level 2

  5. build the remaining levels

  6. create the WBS dictionary