Which of the following items is not typically included in a construction company’s overhead?

a. Office rent and utilities.

b. Company travel, entertainment, advertising.

c. Direct and indirect field costs.

d. Interest and bank charges.

c

2
New cards

A construction bond typically involves three parties: (1) the party that might default, (2) the party that may incur financial and scheduling damages, the (3) the party that compensates for those damages.

a. (1) owner; (2) contractor; (3) surety

2. (1) contractor; (2) owner; (3) surety

c.(1) surety; (2) contractor; (3) owner

d. a&b

(1) contractor, (2) owner, (3) surely

3
New cards

When estimating productivity for an earthmoving operation, an increase in the slop grade will cause the grade resistance to ____

a. decreases

b. increases

c. does not change

d. may decrease depending on the soil type

b

4
New cards

Which of the following is NOT a method commonly used method in a value engineering process?

a. Hold quality & time steady but reduce cost.

b. Hold cost & time steady but increase quality.

c. Hold quality & cost steady but decrease time.

d. None of the above

d.

5
New cards

Which one of the following items is NOT included in the general conditions of a construction contract?

a. Time

b. Changes in work

c. Mandatory wage rates

d. Disputes

c.

6
New cards

The sequence of activities that determines the minimum times required to complete a project is called the

a. Shortest Path

b. Critical Path

c. Direct Path

d. Contractual Path

b.

7
New cards

Which of the following statements about specifications is NOT correct?

A. Often include the technical provisions for the different trades & materials involved in the project.

B. The size of the specifications is directly related to the size & cost of the project.

C. The size is influenced by how many different trades & materials are involved in the project.

D. None of the above

B.

8
New cards

What does the term “Means and Methods” refer to, and whose responsibility is it to decide which “Means and Methods” are used in a project?

A. The approaches, methodologies, technologies and specific ways to design the.project. Decided by the contractor.

B. The approaches, methodologies, technologies and specific ways to design the project. Decided by the owner.

C. The approaches, methodologies, technologies and specific ways to build the project. Decided by the designer.

D. The approaches, methodologies, technologies and specific ways to build the project. Decided by the contractor.

D.

9
New cards

Which of the following statements about soil states is NOT true?

A. The Loose State refers to soil that has been disturbed through hauling or other work

B. The Compacted State refers to soil that is artificially compacted

C. The Bank State refers to soil that has been disturbed through hauling or other work.

D. The Bank State is not artificially compacted

E. All the above are true

C.

10
New cards

In the work breakdown approach to project planning and cost estimation, which criteria are typically used to define and sequence work packages?

A. Methods, material types, location, owner’s perspective.

B. Location, required resources, material types, profit.

C. Resources, material types, cost, and location.

D. Location, required resources, material types, and methods.

D.

11
New cards

The work breakdown structure (WBS) is a hierarchical decomposition of the total scope of work to be carried out by the project team.

True or False

True

12
New cards

A contractor’s bonding capacity determines the size of projects they can bid on.

True or False

True

13
New cards

“Liquidated damages” is a common construction contract term used when a water leak occurs on site.

True or False

False

14
New cards

The swell factor directly defines the relationship between the compacted and loose states of soil.

True or False

False

15
New cards

In the Construction Specification Institute (CSI) Master Format, as used in RS Means, the column labeled “Total Incl O&P" stands for the total cost of Operation and Performance.

True or False

False

16
New cards

Compared to a builder (contractor), a design engineer is better equipped with the detailed knowledge needed to accurately estimate construction costs.

True or False

False

Explore top notes

note
Lecture 13A: Paleozoic Life
Updated 236d ago
0.0(0)
note
Gravitation and Circular Motion
Updated 1083d ago
0.0(0)
note
Chapter 11: Stockholders' Equity
Updated 812d ago
0.0(0)
note
chapter 4: a&p (tissues)
Updated 661d ago
0.0(0)
note
APES Unit 2 - Biodiversity
Updated 546d ago
0.0(0)
note
Lecture 13A: Paleozoic Life
Updated 236d ago
0.0(0)
note
Gravitation and Circular Motion
Updated 1083d ago
0.0(0)
note
Chapter 11: Stockholders' Equity
Updated 812d ago
0.0(0)
note
chapter 4: a&p (tissues)
Updated 661d ago
0.0(0)
note
APES Unit 2 - Biodiversity
Updated 546d ago
0.0(0)

Explore top flashcards

flashcards
global Quiz
39
Updated 1053d ago
0.0(0)
flashcards
ap psych unit 7
73
Updated 1143d ago
0.0(0)
flashcards
Westward Expansion
29
Updated 1139d ago
0.0(0)
flashcards
latin vocab 1-30
28
Updated 754d ago
0.0(0)
flashcards
Chem Ch.4 Element Info
30
Updated 1283d ago
0.0(0)
flashcards
global Quiz
39
Updated 1053d ago
0.0(0)
flashcards
ap psych unit 7
73
Updated 1143d ago
0.0(0)
flashcards
Westward Expansion
29
Updated 1139d ago
0.0(0)
flashcards
latin vocab 1-30
28
Updated 754d ago
0.0(0)
flashcards
Chem Ch.4 Element Info
30
Updated 1283d ago
0.0(0)