1/26
Looks like no tags are added yet.
Name | Mastery | Learn | Test | Matching | Spaced | Call with Kai |
|---|
No study sessions yet.
The Owner
The one who orders for the implementation of a project
The architect and is specialist consultant
The one who render plan and design services and limited inspection work
The contractor
The one who performs construction works
Architect and his Specialist Consultants (SCs)
The individual or group of individuals who assist in the supervision and delivery of the work.
Construction Supervision Group (CSG)
____ is responsible to the Owner for administrative matters but follows the AOR for technical concerns.
Clerk of Works
when project were still manageable in size, the architect was then assisted by a construction inspector, traditionally called ______
Construction Supervision Group (CSG)
They are the one that is normally recommended by the Architect based on their performance, and hired by the owner.
Construction Supervision Group
What does CSG stands for?
Project Construction Cost
What does PCC stands for?
Percentage (%) of project construction cost (PCC)
A method of compansation that has a compensation details are specified in the architect’s guidlines
Multiple of Direct Personnel Expenses
This method of compensatiion covers non creative task, calculationfees based on technical hours worked (excluding creative design). it onvilves aading echnical service cos (Hours x rate) and applying a multiplyier for overhead and profit.
Professional Fee Plus Expenses
A type of method of compensation that is common for continuing relationships with series of pojects.
Lump Sum or Fixed Fee
A type of method of compesation that was used for government projects with extensive paperwork.
Per Diem, Honorarium plus reimbursable epenses
This compensation covers personal time and expenses like travel, accommodation, and subsistence.
Mixed methods of compensation
Multiple methods can be used for a project, depending on its specifics.
Article 1723
____ of the Civil Code doesn't explicitly assign legal responsibility to the CSG, but a Service Contract can outline their duties and liabilities.
Construction Supervision Group (CSG)
____ Shall not assume he responsiility of contractor’s project superintendent
Construction Supervision Group (CSG)
The ___ shall not make decisions on matters that are the sole rensponsibility og the architect oof record (AoR0
Bachelor of Science in Architecture (B.S. Arch.)
Inspectors of the CSG must hold _____ degree and have extensive experience in design and building construction and must be very knowledgeable in building materials and construction detailing
Construction Supervision Group (CSG)
If the Owner sues the AOR (and EOR) and the Contractor due to CSG-related issues, the AOR and EOR can file cross claims against the ___.
Architect In charge of construction
Who is directly resposible and liable for the construction supervison of the project
Construction Supervision Group (CSG)
Scope of servicces:
quality control
evaluation of construction work
preperation of daily inspection reports
filing of document