27 Terms

1
New cards

The Owner

The one who orders for the implementation of a project

2
New cards

The architect and is specialist consultant

The one who render plan and design services and limited inspection work

3
New cards

The contractor

The one who performs construction works

4
New cards

Architect and his Specialist Consultants (SCs)

  The individual or group of individuals who assist in the supervision and delivery of the work.

5
New cards

Construction Supervision Group (CSG)

____ is responsible to the Owner for administrative matters but follows the AOR for technical concerns.

6
New cards
7
New cards

Clerk of Works

when project were still manageable in size, the architect was then assisted by a construction inspector, traditionally called ______

8
New cards

Construction Supervision Group (CSG)

They are the one that is normally recommended by the Architect based on their performance, and hired by the owner.

9
New cards
10
New cards
11
New cards
12
New cards
13
New cards

Construction Supervision Group

What does CSG stands for?

14
New cards


Project Construction Cost

What does PCC stands for?

15
New cards

Percentage (%) of project construction cost (PCC)

A method of compansation that has a compensation details are specified in the architect’s guidlines

16
New cards

Multiple of Direct Personnel Expenses

This method of compensatiion covers non creative task, calculationfees based on technical hours worked (excluding creative design). it onvilves aading echnical service cos (Hours x rate) and applying a multiplyier for overhead and profit.

17
New cards

Professional Fee Plus Expenses

A type of method of compensation that is common for continuing relationships with series of pojects.

18
New cards

Lump Sum or Fixed Fee

A type of method of compesation that was used for government projects with extensive paperwork.

19
New cards

Per Diem, Honorarium plus reimbursable epenses

This compensation covers personal time and expenses like travel, accommodation, and subsistence.

20
New cards

Mixed methods of compensation

Multiple methods can be used for a project, depending on its specifics.

21
New cards

Article 1723

____  of the Civil Code doesn't explicitly assign legal responsibility to the CSG, but a Service Contract can outline their duties and liabilities.

22
New cards

Construction Supervision Group (CSG)

____ Shall not assume he responsiility of contractor’s project superintendent

23
New cards

Construction Supervision Group (CSG)

The ___ shall not make decisions on matters that are the sole rensponsibility og the architect oof record (AoR0

24
New cards

Bachelor of Science in Architecture (B.S. Arch.)

Inspectors of the CSG must hold _____ degree and have extensive experience in design and building construction and must be very knowledgeable in building materials and construction detailing

25
New cards

Construction Supervision Group (CSG)

If the Owner sues the AOR (and EOR) and the Contractor due to CSG-related issues, the AOR and EOR can file cross claims against the ___. 

26
New cards

Architect In charge of construction

Who is directly resposible and liable for the construction supervison of the project

27
New cards

Construction Supervision Group (CSG)

Scope of servicces:

  • quality control

  • evaluation of construction work

  • preperation of daily inspection reports

  • filing of document