1/97
Looks like no tags are added yet.
Name | Mastery | Learn | Test | Matching | Spaced |
---|
No study sessions yet.
10 days prior
Before the start of construction and the excavation particularly, the person making or causing the excavation shall notify in writing the owners of the adjoining property about the said activity.
TRUE
A Building Official has overall administrative control and/or supervision over all works pertinent to buildings/structures over a region and shall be charged with the processing of all permit applications and certificates as well as the issuance of the same.
TRUE
Is the maximum height of the building or number of storeys will depend of the Charter of the use and occupancy.
3 storeys
If only one RROW services, a lot with 6 - 7 meter wide, the allowed number of storeys is
one storey and single detached building/structure with a total floor area of 20.00 sq. meters or less.
Structural Analysis and Design for all buildings/structures are required except for:
Accessory Permit
Permit issued by the Building Official for accessory parts of the project with very special functions or use.
TRUE
If the first two floors of a five-storey building is for commercial use, and the upper floors are for residential use, each one of these occupancies should have a complete separation.
Schematic Plans
The following are requirements for applying a building a permit except for?
Renovation
Any physical change made on buildings/structures to increase the value, quality, and/or to improve the aesthetic.
TRUE
One of the parameters to consider for the building height is to secure clearance from concerned Military or Security Authorities.
First statement is FALSE; Second statement is TRUE
Modified True of False: A firewall
(1) can have openings.
2) For townhouse residential uses or
occupancies, firewalls on two sides can be allowed on a maximum of 85% of the total
length of each side property line.
TRUE
A standard truck or bus parking/ loading slot must be computed at a minimum of 3.60 meters by 12.00 meters.
Deed of Absolute Sale
In applying for a Building Permit, the registered property owner must submit his/her application together with pertinent documents. Which of the following is NOT considered as such?
TRUE
Lot location in relation with fault lines and soil characteristics help determine a Building Height
Five years of diversified training in management system
Which of the following is NOT a qualification for being appointed as a Building Official?
36m - 54m
For Residential 5 (R5 ), The allowable highest grade of the building should be:
not more than 20 %
What is the prescribed percentage to be retained by the Building Official from the income/collection derived from fees and other charges to be used for the operational expense of his office?
Environmental Safeguards
Under Section 104 (general Building Requirements) Buildings or structures intended to be used for the manufacture and/or production of any kind of article or product shall observe adequate
Office of the Building Official
The office authorized to enforce the provisions of the NBC and its IRR in the field, as well as the enforcement of orders and decisions made pursuant thereto?
15 Days
For buildings found to be dangerous/ruinous, a written notice or advice shall be served upon the owner and occupant of such finding or declaration giving him at least how many days? within which to vacate the said building?
FALSE (3.00m x 9.00m)
A jeepney or shuttle parking / loading / unloading slot must be computed at minimum of 4.00 meters by 10.00 meters.
Setback
The horizontal distance measured 90? from the outermost face of the building or structure to the property lines
D1
In what zoning does mental hospital, mental sanitaria and mental asylums.
TRUE
General Institution is use or occupancy, characterized mainly as a low-rise, medium-rise or high rise building/ structure for educational, training and related activities, e.g. school and related facilities.
First statement is FALSE; Second statement is TRUE
Modified True or False: Maximum height
of Buildings
(1) is dependent upon the fire zone
location of a building.
(2) The maximum height and number of
storeys should be determined based on
their proposed use and occupancy.
15m (or more)
For Institutional Structure, the duly approved BHL is
C-2
In what zoning does amusement halls and parlors fall under?
DPWH
The Secretary is under the office of what National Agency?
Sheds, Outhouses and the like with 12 sq. mtrs. area
A building permit shall not be required for minor constructions and repairs, provided these shall not violate any provision of the Code and its IRR. Which of the following is NOT considered as a minor construction?
36m
For R3, High Density Housing or multiple-family dwelling units should be allowed to have the Building Height limits of _____ m.
Density
One of the height structure determinants is ______ that pertains to the number of Users.
6.00 meters
Length of an automobile parking slot for parallel parking (2.15m X ______).
Vicinity Map / Location Map
This is part of the Architectural Drawings that is required for submission in applying for the Building Permit which shows the prominent landmarks or major thoroughfares for reference
6m
Towers, Spires and Steeples erected as part of the building and with non-habitable use as storage shall not exceed of _____ m ht.
TRUE
Frequency and intensity of typhoons should be considered in determining the Building Height
One (1) car slot for every unit
Parking requirements for Motels
6 Storeys
The allowable storeys or number of floors for Commercial 2 above the established grade is
TRUE
One (1) car slot for every five (5) classroom; is for Private elementary, secondary, vocational and trade school.
1 slot per 50 SQM of
SPECTATOR AREA
Parking requirement for an auditorium.
Indigenous Family Dwelling
In the NBC, this term means a dwelling intended for the use and occupancy by the family of the owner only and constructed of native materials such as bamboo, nipa, logs, or lumber.
FALSE (Originally its 1 year, 120 days is for special)
A building permit issued under the provisions of the Code shall expire and become null and void if the building or work authorized therein is not commenced within a period of 120 days after the issuance of the building permit.
Secretary of DPWH
The administration and enforcement of the provisions of the NBC( also known as the 'Code') and its IRR, including the imposition of penalties for administrative violations thereof, is vested upon?
Easement
A kind of public open space that must be absolutely free of all forms of physical obstructions that can negatively affect natural light and ventilation within such space or that can impede access to or the full recreational use of such space by the general public.
TRUE
Signage or Antenna of Telecom tower shall be permitted to construct on the roof as it comply with the duly approved by city / municipal zoning ordinances.
24km
ATO required unobstructed airspace in any construction of buildings with the ___ radius with non or turbo jet aircraft operate.
TRUE
Residential 4 Townhouse is allowed to established up to 3 storey high
Buildings can be constructed without a yard
Which one does not conform with the code in terms of Location on Property
Blistering
A paint defect which results to bubbles due to localized loss of adhesion and lifting of the paint film from the underlying surface and may be due to moisture seeping into the walls.
8 pieces
A 0.2 × 0.4 meter beam has a clear span of 6 meters resting on 0.3 x 0.3 meter columns. If the beam has 2 pieces continuous bars for the top and bottom each and 1 extra bar on the tension portions of the beam, how many 6-meter long steel bars are needed to reinforce the beam?
Thickness of CHB
What measurement varies and needs to be considered in the computation for the volume of grout/mortar filler.
Base Course
A layer of gravel placed on undisturbed soil to prevent the capillarity rise of moisture to a ground slab.
one (1) car slot for every 30 sqm of customer area
Parking requirements for public market
Green Code
_________ stands for an innovative, sustainable building concept, which is directly intended for architects, property developers and project developers. In addition, it is also a licence system for precast concrete element manufacturers.
MAXIMUM OF 80% OF THE TOTAL LENGTH OF A SIDE PROPERTY LINE; provided that ONLY ONE (1) SIDE PROPERTY LINE IS USED FOR A FIREWALL in the case of a R-2 structure
Firewall for R1 and Medium Density Residential
Republic Act No.7277
PWD Act, Magna Carta for Disabled Persons
Republic Act No.10524
An Act Expanding the Positions Reserved for Persons with Disability
2 seats
PWD seats domestic airplane
Clerestory
A window above a door for additional light
2 seats
PWD seats LRT
Clerestory
How many sprinklers are required before
the exit?
TRUE
T/F: Should you attach the extinguisher even if everything else is already installed?
A Filipino citizen
and of good moral
character.
A duly registered
architect or civil
engineer.
A member of good
standing of a duly
accredited
organization of his
profession for not
less than two years.
Has at least five
years of diversified and professional
experience in building design and
construction.
All of the choices
No person shall be appointed as a Building Official unless he possesses the following qualifications:
5.00 meters
Length of an automobile parking slot for perpendicular parking (2.50m X ______).
5.00 meters
Length of an automobile parking slot for diagonal parking (2.50m X ______).
9.00 meters
A jeepney parking / loading / unloading slot must be computed at minimum of 3.00 meters by ________ meters
3.60 meters x 18
meters
Length of an articulate truck parking slot (_______ X ______).
1:12 or 12%
Slope for PWD Ramp
40%
Repetitive Design
Group J
In which group of occupancy does an agricultural building belong?
Education
Division C Occupancy
H-2
Division H; more than 300 without stage
Technical Professionals
Special Personnel (Design Competition) called
BP220 OR BATAS PAMBANSA BLG. 220 (ECONOMIC AND SOCIALIZED HOUSING PROJECTS)
Code for Housing
1.50 meters
Turning radius for wheelchair
1.80 meters
Turning radius and stop for wheelchair
Specialized Allied Services (or Specialized)
SPP Document 203
Post-Construction Services (Post-Construction)
SPP Document 205
Intellectual Property Code (RA 8293)
Code that pertains to copyright
Z Benefits
Philhealth benefits for terminal patients
Construction and Improvement
Benefits from PAG-IBIG Fund
GFA or Gross Floor Area
Total property measured between exterior walls
CFA or Construction Floor Area
Measured to outside face of external walls
Incremental setback
Stops overbuilding
Reduces the TGFA
RA 9514 (Fire Code of the Philippines )
Fire Code
Yard
Space left after easements
4.50 meters
Minimum setback for R-1
5.00 meters
Minimum setback for commercial; 15 meters RROW (Road Right Of Way)
Change Order
Order issued by owner AFTER completion
of contract.
Changes during Construction Phase
Construction
Change Orders are in what stage
Final Payment
Final payment less retention fee
Bid Bulletin
Documents with information needed during bidding
Architect
Has a licence from PRC (Professional Regulation Commission); passed architectural boards
Performance Bond
Approved form of security by contractor; guarantee to excecute work in accordance to contract
Quality Control
Ensures completion and quality of materials
Social Security System
What does "SSS" mean?
1.20 meters
Height of light switch
0.70 meters or 0.90 meters
Height of handrails
Construction Phase
When does the architect visit the site to
check the quality of work?