Des Tech - Topic 2, 3, 4

0.0(0)
studied byStudied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/21

encourage image

There's no tags or description

Looks like no tags are added yet.

Last updated 12:50 PM on 6/11/23
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai

No analytics yet

Send a link to your students to track their progress

22 Terms

1
New cards
# Topic 2
2
New cards
Design for manufacture
split into 3 different subtopic

* Design for materials
* design for process
* design for assembly
3
New cards
Design For Materials
Designing in relation to materials during processing, rather than designing for the final desired properties of the end product in use. 
4
New cards
Design for process
designing to enable the product to be manufactured using a specific process e.g. injection molding
5
New cards
Design for assembly
taking account of the assembling process at various levels
6
New cards
Embodied Energy
the sum of all energy required to produce that product
7
New cards
local combined heat and power
CHP generates electricity whilst also capturing usable heat that is produced in this process
8
New cards
Personal Energy Systems
E.g Solar Panels

is the small-scale generation of heat and electric power by homes (also small businesses and small communities) to meet their own needs. \n •It is an alternative or can supplement traditional centralized grid-connected power. \n •Lower negative impact on the environment \n •Lower costs for the consumer \n •High initial capital cost \n •also known as micro-generation
9
New cards
Mitigation
directly stopping or reducing emissions
10
New cards
clean tech
a product that reduces waste and requires as few non renewable resources as possible
11
New cards
Drivers For Clean Tech (what makes a company go green)

1. social - how consumers affect a company’s way of production
2. political - radical and incremental solutions
3. economical - how regulations affect a company’s way of production
12
New cards
Incremental Solutions
predictable development, that takes time. but has exploitation and small potential for market growth
13
New cards
Radical Solutions
exploration of new technologies, high potential of market growth, creation of new industries, improved reputation, but is unpredictable, and high uncertainty of success
14
New cards
End of Pipe
a method used to remove already formed contaminants typically at the end of the process of production
15
New cards
CAD
Computer Aided Design

Adv

* easily shareable
* easily editable
* iterations can be made with ease

Dis Adv

* High set up cost (only for multiple systems)
* initial learning difficulty
* not very creative
16
New cards
LCA
Life Cycle Analysis

* Pre-production (extraction of material)
* Production
* Distribution (includes packaging)
* Utilisation
* Disposal
Life Cycle Analysis

* Pre-production (extraction of material)
* Production
* Distribution (includes packaging)
* Utilisation
* Disposal
17
New cards
Cradle To Cradle
living with the earth rather than on the earth
18
New cards
# Topic 3
19
New cards
Conceptual Modeling
a description of a proposed system in terms of a set of integrated ideas and concepts about what it should do
20
New cards
Low Fidelity
* cheap
* fast
21
New cards
Medium fidelity
* more refined
* fast
* CAD
* still rough
22
New cards
High fidelity
* fine details
* longer process
* to scale