EOP-SDP-6 Response to Unexpected RCS Temperature Changes during Shutdown

0.0(0)
studied byStudied by 0 people
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
Card Sorting

1/4

encourage image

There's no tags or description

Looks like no tags are added yet.

Study Analytics
Name
Mastery
Learn
Test
Matching
Spaced

No study sessions yet.

5 Terms

1
New cards

Entry Condition

SDP-6 is only entered through SDF-0

<p>SDP-6 is only entered through SDF-0</p>
2
New cards

Temperature effect on flooding the refueling cavity

Temperature monitoring with no RCPs running

knowt flashcard image
3
New cards

RNS and SWS Operation

(Step 1 & 2)

Notice:

RNS realigned per SOP

<p>Notice:</p><p>RNS realigned per SOP</p>
4
New cards

CCS and PRHR Operation

(Step 3 & 4)

Notice:

PRHR failsafe isolation: Local within Containment

<p>Notice:</p><p>PRHR failsafe isolation: Local within Containment</p>
5
New cards

Procedure End/Exit

(Step 5 & 6)

knowt flashcard image