1/42
Looks like no tags are added yet.
Name | Mastery | Learn | Test | Matching | Spaced | Call with Kai |
|---|
No analytics yet
Send a link to your students to track their progress
A multi-faceted project that serves as an academic and intellectual experience for students
Capstone Project
Similar to thesis, results in a report, performance or presentation in a product
Capstone Project
Designed to encourage students to think critically and connect their projects to community issues
Capstone Project
Final crowning and protective stone laid in the top of an exterior wall.
Final crowning moment of your education
Capstone
Students will produce a major work of content (book, research, etc.) that can be of use to others
Content-focused project
The completed work might include a business or strategy plan or other practical elements of launching the initiative. Students will create a new business, organization, or initiative.
Entrepreneurial-Focused Project
Students will create a new technology tool which might include a a app, module, software, or other project that focuses on developing a technology product or component
Technology-Focused Projects
The UN established ___ as a reference to address such conflicts and give better lives for people in all areas of our planet.
Sustainable Development Goals (SDG)
Their main task is to tackle these challenges along with others to make the world more sustainable for future generations.
There are how many goals in SDG and they are focused on the sustainable development of our future generations?
17
Complete eradication of poverty in all of its forms everywhere
No Poverty
End hunger, promote agriculture, and provide food for every person.
Zero Hunger
Ensure health and provide care for everyone regardless of their age.
Good Health and Well-being
Ensure quality education that is equitable and inclusive
Quality Education
Eradicate gender-based discrimination and empower all women.
Gender Equality
Ensure and develop appropriate water supply and waste disposal systems.
Clean Water and Sanitation
Provide access to affordable, reliable and modern energy.
Affordable and Clean Energy
Provide constant and inclusive enhancement of economic activities.
Decent Work and Economic Growth
Develop resilient infrastructure and enhance creativity.
Industry, Innovation, and Infrastructure
Further decrease and eradicate the inequalities that exist
Reduced Inequalities
Develop cities and communities that are inclusive, safe, resilient and sustainable
Sustainable Cities and Communities
Promote patterns of consumption and production that are sustainable
Responsible Consumption and Production
Make urgent efforts to combat climate change and its effects.
Climate Action
Protect and manage the oceans, seas, and marine resources.
Life Below Water
Conserve and promote the sustainable use of land-based ecosystems.
Life on Land
Support the achievement of peaceful and constructive solid societies
Peace, Justice, and Strong Institutions
Revamp and strengthen global partnerships for sustainable development.
Partnerships for the Goals
This phase usually begins with a problem
IDEA PHASE
The problem statement is typically only vaguely defined and requires research into its ____ and its ____
viability and its feasibility
suggests that there is significant value in pursing solution
Viability
serves as a check on whether the idea can be realized
Feasibility
This means that people, technology, and time resources are readily available or known; resources may not be available directly, but can be found
High feasibility
means the resources may be rare or do not exist
Low feasibility
The most critical part of the idea phase is to define the _____, validate its _____, and identify the _____ who desires its solution
problem, value, customers
This phase is about generating numerous models (mathematical, physical, simulation, simple drawings or sketches), which should convey that the solution meets the customer’s expectations or requirements.
CONCEPT PHASE
The numerous concepts are generated using brainstorming techniques, in which elements of one concept are recombined with other elements to find a single concept that fits best.
CONCEPT PHASE
The concept phase ends with the selection of a what?
single concept
____ _____ and _______ are required to merge concepts
Design judgment and compromise
This phase is about defining the implementation plan: identifying the people task, task durations, dependencies, interconnections, and budget required to get the project done.
PLANNING PHASE
Tools used to convey information include Gantt and Pert charts, resource loading spreadsheets, sketches, drawings, and models to validate that the project can be successfully completed
PLANNING PHASE
One critical tool of the planning phase is the what?
system engineering diagram
shows the solution as an interconnection of smaller and less complicated sub-systems
system engineering diagram
It establishes all the inputs and outputs for each module, as well as the way in which the module transforms the inputs into outputs
system engineering diagram