when is the power Distibution LCO applicable?
Mode 1 and greater than 20% RTP
what is the LHR ratio acceptable per LCO 3.2?
LHR less than 13.1 Kw/ft
if LHR is out of band with COLSS in service, how quickly do we need to restore LHR?
restore within limits in 1 hour
if LHR is out of band with COLSS inoperable, what actions are taken?
trend every 15 minutes
adverse trend and rising, restore in 1 hr
no adverse trend, restore in 4 hours
what is the purpose of the LHR limit?
prevents fuel clad failure during a LOCA by maintaining fuel cladding temp under 2200 F
what is required if tilt is not within the COLR limits or greater than.03 with COLSS inoperable what actions are required
reduce power to less than 50% in 4 hours
reduce VOPT setpoint to 55% in 16 hours
restore and correct prior to raising power
what are the TILT limits with COLSS operable and COLSS inoperable
COLSS operable
10% when less than 50% power
5% when greater than 50% power
COLSS inoperable
3%
what is required if DNBR is out of range?
maintain power below DNBR POL (COLSS operable) or COLR limits (use CPC channel when COLSS inop)
if COLSS operable restore limits within 1 HR
if COLSS inop
trend every 15 minutes
adverse trend restore in 1 hr
no adverse trend restore in 4 hours
how are CPC values of DNBR/LHR affected by a slipped or dropped CEA
values are non-conservative and are not to be used to check DNBR/LHR limits
assume and adverse trend exists
how is trend on DNBR/LHR affected when power is not stable (not ± 1%)
if lowering power DNBR/LHR rend data is not valid
Assume adverse trends exist