CT Estimation question equations

0.0(0)
studied byStudied by 0 people
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
Card Sorting

1/4

encourage image

There's no tags or description

Looks like no tags are added yet.

Study Analytics
Name
Mastery
Learn
Test
Matching
Spaced

No study sessions yet.

5 Terms

1
New cards

Equation for finding volume of earth between cross section areas (end areas method)

V = d/2(first A + last A + 2(other areas added))

2
New cards

Order of things to find for calculating time required

  1. Volume of soil taken per cycle

  2. No. of cycles to load truck

  3. Time per truck to load

  4. Total time per truck

  5. Time for amount required by question, convert to weeks

3
New cards

Volume of soil taken per cycle

Volume of bucket x loading capacity

4
New cards

Number of cycles to load truck

Volume of truck ÷ Volume of backacters per cycle

(v of backacters per cycle = v of soil taken per cycle)

5
New cards

TIme per truck

Number of cycles to load truck x (1hr ÷ cycles per hour output),

then add time to excavate load and tip to find total time per truck