Brewery process design and engineering

0.0(0)
studied byStudied by 0 people
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
Card Sorting

1/3

encourage image

There's no tags or description

Looks like no tags are added yet.

Study Analytics
Name
Mastery
Learn
Test
Matching
Spaced

No study sessions yet.

4 Terms

1
New cards

What design specifications should be considered?

– Site location

– Brewery capacity – batch size, concurrent batches

– Grain receival and storage

– Brewhouse operations – mash conversion, separation, boil

– Yeast Propagation and Fermentation

– Post Fermentation Processing – dosing/additions, clarification, filtration, stabilisation

– Energy recovery

– Maturation Storage

– Control & instrumentation

– Services

– Cleaning, sanitation, CIP systems

– Waste management

– Logistics

2
New cards

What are the requirements of a brewhouse?

• Produce good quality wort to target specification for beer style

• High throughput and efficiency

• Optimal extract recovery from raw materials

• Low cost of production

3
New cards

r

rr

4
New cards

r

rrr