1/5
Looks like no tags are added yet.
Name | Mastery | Learn | Test | Matching | Spaced |
---|
No study sessions yet.
Entry Path
Requirement to Actuate Containment Vacuum Relief
(Step 1 and RNO)
How to Terminate PCS
(Step 2 and RNO)
Notice:
The associated V002x is closed if the V001 cannot be isolated
Containment Restoration
(Step 3-6)
Step 3: Reset “T”
Step 4: Establish IA to CNS (A-703 in tandem if unable)
Step 5: Isolate temp source(s) to PCS bucket if applicable (P72)
Step 6: Isolate VWS Supply AOVs
High Rad conditions
(Step 7)
Low Pressure condition and Z.4 End/Exit
(Step 8-10)