MIDTERM REVIEWER
This shall be submitted by the owner/permittee to the office of the Building Official prior to any construction activity.
NOTICE OF CONSTRUCTION
The supervising Architect/ Civil Engineer shall keep this at all time to record the actual daily progress if construction and other pertinent data.
LOGBOOK
No building/structure shall be used or occupied until the Building Official issued this as provided in the Code.
CERTIFICATE OF OCCUPANCY
These are the permits that are duly signed and sealed by the corresponding professionals and the plans and specifications shall be submitted together with the duly notarized application for building permit.
CERTIFICATE OF COMPLETION
A document issued by the building official (BO) to an owner/applicant to proceed with the construction, installation, addition, alteration, renovation, conversion, repair, moving, demolition or other work activity of a specific project, building, structure, or portion thereof after the accompanying principal plans, specifications and other pertinent documents to the duly notarized application are found satisfactory and substantially conforming with the National Building Code of the Philippines (the code) and its Implementing Rules and Regulations (IRR).
BUILDING PERMIT
It is also known as the code or PD 1096
NATIONAL BUILDING CODE OF THE PHILIPPINES
Republic Act No. 9514 is also known as _______.
FIRE CODE OF THE PHILIPPINES
A type of construction that uses masonry and wood.
TYPE III
Fire-resistive rating for exterior doors and windows in all types of construction.
ONE-HOUR FRR
What is the minimum thickness (mm) of solid masonry partitions with 4 hours fire-resistance?
200 mm
There are areas where siting of buildings/ structures are permitted without fire-resistivity measures, often located in the country sides or rural areas where commercial and industrial and other buildings are sparsely constructed.
NON-FIRE RESTRICTIVE ZONES
Responsible for carrying out the provisions of the code in the field as well as the enforcement of order and decisions made pursuant thereof.
OFFICE OF THE BUILDING OFFICIAL
Consist of assembly building with a stage and an occupant load of 1000 or more in the building.
GROUP I
It is the length of time a material can withstand being burned.
FIRE-RESISTIVE TIME PERIOD RATING
True or False?
Four (4) sets of survey plans, design plans, specifications, and other documents prepared, signed and sealed over the printed names of the duly licensed and registered professionals must be submitted for building permit application.
TRUE
True or False?
The width for the title block in the building plans/construction drawing is 40 mm.
TRUE
True or False?
Requirements for flame-spread characteristics of finishes shall be applied to frames and trim of doors and windows and to materials which are less than 1.00 mm in thickness cemented to the surface of walls or ceilings.
FALSE
True or False?
Installation of window grills requires a building permit application.
FALSE
True or False?
Group H Occupancies Division 2 is consisting of assembly building without stage and having an occupant load of less than 300 in the building.
FALSE
It is the true buildable area on which a fully enclosed building/structure can be erected.
ALLOWABLE MAXIMUM BUILDING FOOTPRINT
It is the ratio between the Gross Floor Area (GFA) of the building/structure and the Total Lot Area (TLA) of the lot/property on which it stands.
FLOOR TO LOT AREA RATIO
It is the maximum height to be allowed for building structures based on their proposed use or occupancy.
BUILDING HEIGHT LIMIT
It helps determine in detail the development potential and/or the carrying capacity of all lots and/or of proposed developments on lots.
DEVELOPMENT CONTROLS
It is the combined total of the Maximum Allowable Percentage of Site Occupancy (PSO) and the Maximum Allowable Impervious Surface Area (ISA) expressed as a percentage (%) of the Total Lot Area (TLA).
MAXIMUM ALLOWABLE CONSTRUCTION AREA
Proposed Commercial Building Site Information
Zoning classification: Commercial 2 (with firewall over the property line on two sides).
Lot type: rectangular corner lot with flat slope.
Lot Depth: 28 meters
Lot width: 20 meters
Road Right of Way Width: 20 meters (both roads)
Use the tables and provisions on the NBCP to determine the following:
total lot area
AMBF
CPSO
TOSL
TGFA
BHL
AMBF = 345 sq.m.
PSO = 61.61%
TOSL = 38.39%
TGFA = 6 703.2 sq.m.
BHL = 18 m
The organization who published National Structural Code of the Philippines
ASSOCIATION OF STRUCTURAL ENGINEERS OF THE PHILIPPINES
According to Section 207, of the structural code of the Philippines, the design wind force for open buildings shall not be less than ______ kN/m2 multiplied by the area normal to the wind direction, Af.
0.77
According to the seismic map of the Philippines found in the National Structural code of the Philippines, only the provinces of Plawan, Sulu and tawi-tawi are under the Seismic zone ______.
2
Type of slab supported by beams in only two (2) sides.
ONE WAY SLAB
According to Section 425, the minimum bend for circular hoop is ____ degrees.
90
Type of slab supported by beams in all four sides.
TWO WAY SLAB
It contains all the list of rebars for the reinforced concrete works to organize and quantify rebars and efficiently complete RC works
BAR BENDING SCHEDULE
According to NSCP 2015, if the clear span length between two simple supports is 2.5m,
What is the minimum thickness of the slab if a one-way slab is to be built between them? Round up to the nearest 5mm.
What is the minimum thickness of the slab if a two-way slab (with interior drop panels) is to be built between them? Use fy = 420 MPa. Round up to the nearest 5mm.
SOL’N 1:
hmin=L/20
L= 2.5mm = 2500mm
hmin= 2500mm/20= 125mm
SOL’N 2:
fy= 420MPa
L= 125mm
hmin=(L/36)(280/fsuby )^1/3
hmin= 70mm
an engineer or architect who draws plans and specifications is liable for damages within _____ years.
15
What is OBO?
OFFICE OF THE BUILDING OFFICIALS
What is IRR?
IMPLEMENTING RULES AND REGULATIONS
What is the difference between fire protective and fire resistive?
A type of construction:
shall be of wood construction with protective fire-resistant materials and one-hour resistive throughout, except, that permanent non-bearing partitions may use fire-retarded treated wood within the framing assembly with one-hour resistivity
TYPE II
Requirements for flame-spread characteristics of finishes shall not apply to frames and trim of doors and windows and to materials less than _______ in thickness cemented to the surface of walls or ceilings
1.00 mm
What is NBCP?
NATIONAL BUILDING CODE OF THE PHILIPPINES
Use of this Architectural Code:
The following considerations should guide the architect in the total design of building and other structure in accordance with the Declaration of Policy of this Code
Occupancy Grouping
Type of Construction
Floor Area
Height and Number of Stories
Floor to floor area and total building area occupant load
Parking requirements
Other architectural consideration: Cultural and Historical Aspects, light and ventilation, accessibility, information technology, others
(AMBF)
Allowable Maximum Building Footprint
(PSO)
Percentage of Site Occupancy
(ISA)
Impervious Surface Area
(USA)
Unpaved Surface Area
(MACA)
Maximum Allowable Construction Area
(TOSL)
Total Open Space within Lot
(FLAR)
Floor to Lot Area Ratio
(TGFA)
Total Gross Floor Area
(BHL)
Building Height Limit
The maximum portion of the lot that may be occupied by the building/structure at grade level after satisfying setback, yard and court requirements.
Allowable Maximum Building Footprint (AMBF)
A quantity related to the Allowable Maximum Building Footprint (AMBF) and the Total Lot Area (TLA). Expressed as the percentage (%) of the maximum allowable enclosed floor area of any building/structure at the ground floor/grade level in relation to the TLA.
Percentage of Site Occupancy (PSO)
The percentage (%) of the maximum allowable floor area of any paved, tiled or hardscaped surface at the ground floor/ grade level (located outside the main building/structure) in relation to the Total Lot Area (TLA).
Impervious Surface Area (ISA)
The portion of the lot that shall remain unpaved and reserved for softscaping/planting.
Unpaved Surface Area (USA)
The total open space required for each type of use or occupancy for a given lot. It is the portion of the lot consisting of the ISA and the USA combined and expressed as a percentage (%) of the Total Lot Area (TLA).
Total Open Space within Lot (TOSL)
The combined total of the Maximum Allowable Percentage of Site Occupancy (PSO) and the Maximum Allowable Impervious Surface Area (ISA) expressed as a percentage (%) of the total Lot area (TLA).
Maximum Allowable Construction Area (MACA)
The total floor space within the perimeter of the permanent external building walls (inclusive of main and auxiliary buildings) such as office areas, residential areas, corridors, lobbies and mezzanine level/s.
Gross Floor Area (GFA)
The ratio between the Gross Floor Area (GFA) of a building/structure and the Total Lot Area (TLA) of the lot/property on which it stands. Any proposed or existing building/structure should not exceed the prescribed FLAR multiplied by the TLA.
Floor to Lot Area Ratio (FLAR)
The ____________ within the main and auxiliary buildings primarily consisting of the gross floor area (GFA) and all other enclosed support areas together with all other usable horizontal areas/surfaces above and below established grade level that are all physically attached to the building/s which shall consists of the following: Covered areas used for parking and driveways, services and utilities.
Total Gross Floor Area (TGFA)
The maximum height to be allowed for buildings/structures.
Building Height Limit (BHL)