1/8
Looks like no tags are added yet.
Name | Mastery | Learn | Test | Matching | Spaced | Call with Kai |
|---|
No analytics yet
Send a link to your students to track their progress
1.
initial:
obtain ATIS
descent checklist complete
2.
arrival:
torque approx 80%
airspeed 150-175KIAS
start one engine inop approach and landing checklist
3.
downwind:
flaps approach
airspeed 130-140KIAS
4.
abeam touchdown point
gear down
props full forward
5.
base:
airspeed Vref+15
6.
final:
airspeed vref+15kts
when it is certain there is no possibility of go-around
flaps down
airspeed Vref
yaw damp off
One engine inoperative approach and landing checklist complete
7.
threshold:
gear recheck down
airspeed Vref
power idle
8.
landing:
ground fine or reverse
brakes as necessary
7.1
go around:
power max allowable
landing gear up
airspeed increase to 125KIAS
flaps up