Business Process Re-engineering and ERP Systems

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/9

flashcard set

Earn XP

Description and Tags

This flashcard set reviews vocabulary related to Business Process Re-engineering and Enterprise Resource Planning Systems, drawing from key concepts in the provided lecture notes.

Last updated 9:48 AM on 3/12/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai

No analytics yet

Send a link to your students to track their progress

10 Terms

1
New cards

Business Process Reengineering (BPR)

The fundamental rethinking and radical redesign of business processes to achieve dramatic improvements in performance measures like cost, quality, service, and speed.

2
New cards

Client-server computing

A network architecture where a server provides resources or services to one or more clients.

3
New cards

Process modeling

The representation of the processes within a business to analyze and improve efficiency.

4
New cards

ERP systems

Enterprise resource planning systems that integrate various functions across a business into a single unified system.

5
New cards

Radical redesign

Implementing significant changes to existing processes to gain competitive advantages.

6
New cards

Integrated databases

Databases that maintain data consistency and reduce redundancy by supporting multiple functional units in a single database.

7
New cards

Technology gap

The disparity between the technology currently utilized by an organization and the technology available in the market.

8
New cards

De-centralization in decision-making

Distributing decision-making authority to lower levels in the organizational hierarchy to increase responsiveness.

9
New cards

Continuous improvement

An ongoing effort to enhance products, services, or processes incrementally over time.

10
New cards

Cautionary tale

A story or example used to warn others against making the same mistakes.

Explore top notes

note
5.5 Production planning
Updated 1329d ago
0.0(0)
note
27 Amendment Notes
Updated 1252d ago
0.0(0)
note
Matter in our surroundings
Updated 697d ago
0.0(0)
note
Introduction to Limits
Updated 420d ago
0.0(0)
note
Module_8_-_Respiratory
Updated 488d ago
0.0(0)
note
Aniline differentiation
Updated 348d ago
0.0(0)
note
5.5 Production planning
Updated 1329d ago
0.0(0)
note
27 Amendment Notes
Updated 1252d ago
0.0(0)
note
Matter in our surroundings
Updated 697d ago
0.0(0)
note
Introduction to Limits
Updated 420d ago
0.0(0)
note
Module_8_-_Respiratory
Updated 488d ago
0.0(0)
note
Aniline differentiation
Updated 348d ago
0.0(0)

Explore top flashcards

flashcards
gibbenglish 951 Unit 1
109
Updated 929d ago
0.0(0)
flashcards
biology 11.2 -11.3
23
Updated 1134d ago
0.0(0)
flashcards
Unit 5 Agriculture
62
Updated 1138d ago
0.0(0)
flashcards
linear regression
20
Updated 1223d ago
0.0(0)
flashcards
Sadlier-Oxford Level F - Unit 9
20
Updated 1117d ago
0.0(0)
flashcards
LG
330
Updated 1029d ago
0.0(0)
flashcards
gibbenglish 951 Unit 1
109
Updated 929d ago
0.0(0)
flashcards
biology 11.2 -11.3
23
Updated 1134d ago
0.0(0)
flashcards
Unit 5 Agriculture
62
Updated 1138d ago
0.0(0)
flashcards
linear regression
20
Updated 1223d ago
0.0(0)
flashcards
Sadlier-Oxford Level F - Unit 9
20
Updated 1117d ago
0.0(0)
flashcards
LG
330
Updated 1029d ago
0.0(0)