Chapter 14 Final (2)

0.0(0)
studied byStudied by 0 people
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
Card Sorting

1/19

encourage image

There's no tags or description

Looks like no tags are added yet.

Study Analytics
Name
Mastery
Learn
Test
Matching
Spaced

No study sessions yet.

20 Terms

1
New cards

Lean

A philosophy that emphasizes minimizing the amount of all resources used in the activities of the enterprise

2
New cards

What does lean require?

Identifying and eliminating non-valued added activities in every part of the company

  • (NVA) Non-value added as in increase in revenue and decrease in cost

    • Rework

3
New cards

Lean (According to Dr. E)

Operating without a reliance upon higher levels of inventory

  • solve underline problems

4
New cards

What is the lean system designed to do?

Minimize:

  • Inventory

  • Assets/ resources

5
New cards

What are some examples of underlying problems?

  • Unreliable suppliers

  • Poor quality

  • Untrained employees

6
New cards

What are the 8 waste?

  • Defects

  • Overproduction

  • Non-utilized talent

  • Transportation

  • Inventory

  • Motion

  • Extra-processing

7
New cards

What is lean philosophy based on?

  • Empowerment of staff

  • Elimination of waste

  • Continuous improvement

8
New cards

What is an example of a job changeover?

  • Ale 8 switching flows during production

  • Mystery flavors in candy

9
New cards

What is lean’s ultimate goal?

Balanced rapid process flow

10
New cards

Anticipatory

A push system anticipate a future customer order

  • “Make all that we can just incase“

    • Ex: Paint factories in the early 80s

11
New cards

Responsive

Pull system wait for a customer order to being production

  • “Let’s make just enough“

12
New cards

What kind of a decison is implimenting lean?

Conscientious

13
New cards

Postponment (delayed differentiation)

A hybrid approach where some production is done but customization is delayed until near customer purchase

14
New cards

6th Sigma (Max DPMO)

Defects per million opportunities; requires ongoing improvement

15
New cards

Value Stream Mapping

A process excellance tool to identifying redundancies and gaps

  • Mostly done using different color Post-It notes

16
New cards

The characteristics of Lean

  • Team Based

  • High Quality

  • Kaizen

  • Fast job-changes

17
New cards

Muda

Japanese for “waste“

18
New cards

The Boat Situation (A)

Inventory tends to cover up real problems

19
New cards

The Boat Situation (B)

Reducing inventory levels and we are forced to deal with underlying problems

20
New cards

The Boat Situation (C)

Once problems were solved, we’re able to operate less inventory