1/5
Looks like no tags are added yet.
Name | Mastery | Learn | Test | Matching | Spaced | Call with Kai |
|---|
No study sessions yet.
Pt = Po + Kt
Where:
Pt = Population @ time projected
Po = Present Population
K = constant increase
t = time in years
Arithmetic Method (Population Projection)
Pt = Po (1 + r)^t
Geometric Method (Population Projection)
RE % = (Actual Value - Measured Value)/ (Actual Value) x 100
Relative Error
TS (mg/L) = (total solids weight)/ (sample weight)
Total Solids
% VS = (VS weight)/(Total Solids weight)x100%
Volatile Solid Percentage
Proportioning Factor = (Total Sample Volume Req'd in mL)/(# of samples to be calculated x Average Daily Flow in MGD)
Composite Sampling Calculation