PP david legit

0.0(0)
studied byStudied by 1 person
0.0(0)
full-widthCall with Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/49

encourage image

There's no tags or description

Looks like no tags are added yet.

Study Analytics
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai

No study sessions yet.

50 Terms

1
New cards

The architect registered and licensed under RA No. 9266, who is directly and professionally responsible for the total design of the project for the client and who shall assume the civil liability for the plans, specifications and contract documents he/she has signed and sealed

Architect of record

2
New cards

The architect registered and licensed or permitted to practice under RA No 9266, who is professionally and academically qualified and with exceptional or recognized expertise or specializaion in any branch of architecture

Consulting architect

3
New cards

Scope of practice of architecture includes

Both choices

4
New cards

The existing official organization of all architects of the Philippines in which all registered Filipino architects shall be members without prejudice to membership in other voluntary professional associations

Integrated and Accredited Professional organizaiton

5
New cards

A document embodied in the architects national code, which defines all aspects of professional service, prescribes minimum basic fees, and establishes the rights and obligations of both the architect and the client

Standards of professional practice

6
New cards

Certificate bearing a registration nmber issued to an individual, by the Professional Regulation Commission through the Board of Architecture, signifying that the individual has successfully passed the Licensure Examination and is registered to practice their profession as architect

COR

7
New cards

Architectral drawings, specifications and other outputs of an architect that only an architect can sign and seal consisting, among other, vicinity mas, SDPs, architectural program, perspective drawings, floor plans, elevations, sections, ceiling plans, schdules, detailed drawings, technicl specifications and cost estimates and other instrments of service in any form

Architectural documents

8
New cards

Refers to the intellectual proprietary rights retained by an architect over any architectural documents or work that he/she preares unless there is a written stipulation to the contrary

Copyright

9
New cards

Means a detailed planning and design of the indoor/enclosed areas of any proposed building/structure, inclding retrofit or renovation work and which shall cover all architectural and utility aspects, including the architectral layouting of all bilding engineering systems fond therein

Architectural interior

10
New cards

The powers and functions of the board of Architecture include

Supervise the registration, licensure and practice of architects

11
New cards

The qualifications of an applicant for the board exam for architects include

None of the above

12
New cards

Mr. ABC got a grade of 85% in history and theory, principles of planning and architectural practice; 81% in strucral design, building materials and architectural specifications and methods of construction and utilities; 48% in urban design and architectural interiors; and 91% in architectural design and site planning. Given these grades, which statement is correct?

Mr. ABC faield the ALE

13
New cards

Mr DEF, while waiting for the oathaking ceremony, was convicted of a political offense. Given this situation, which is correct?

Mr DEF can be refused the issuance of their COR and PIC

14
New cards

Mr. GHI, a graduate of BA Architecture from a prestigious university in Switzerland and is currently in the process of having his degree recognized by CHED to quality for he ALE. Despite this, he claims on his professional social media pages that he is an architect. Which proivsion of RA 9266 is violated?

25

15
New cards

Mr GHI then gained a client. Since he cannot sign and seal the documents yet, he asked Ar JKL to sign the arhcitectural documents on this behalf. What section of RA 9266 is this violating?

32

16
New cards

Which of the following is/are wihin the scope of SPP doc 204-A?

Evaluation of construction works

17
New cards

Which of the following is/are within the scope of SPP 204 - B

Cost and time control

18
New cards

Mr. and Mrs. LMN engage Ar. OPQ to design their dream home to be situated on a R-1 zone. Assuming the PCC is Php 15,000 , how much should Ar. OPQ charge as RPF

1,550,000

19
New cards

In the code of ethical conduct, the architects duty to respect and help conserve the systems of vales with the natural, hirsotic and cultural heritage of the community in which they create architecture falls under which article?

The architects responsibility in relation to the people

20
New cards

In the code of ethical conduct, the architects duty to not render professional services without a professional service agreement falls under which article?

The architects responsibility in relation to their colleagues and subordinates

21
New cards

In the code of ethical conduct, the architects duty to caarry out their professional work without undue delay and within an agreed reasonable time limit falls under which article?

The architects responsibility in relation to their clients

22
New cards

The licensed professional who shall prepare and submit a certificate of completion of the project stating its conformity to the code including the aproved plans and specifications

Architect in charge of construction

23
New cards

A medium density residential use or occupancy characterized as low-rise multilevel bilding or structure of three to five storeys in height and for se as multiple family dwellings

Max r-2

24
New cards

ISA + USA

TOSL

25
New cards

PSO + ISA

MACA

26
New cards

PSO + TOSL

TLA

27
New cards

AMBF/TLA

PSO

28
New cards

Abustment of one side is allowed for any R-1 lot type or location

True

29
New cards

Which of the following ses are not allowed on public easement?

A and B

30
New cards

The minimum and allowable width of temporary walkway in case there is no sidewalk in front of the building site during construction

1200mm

31
New cards

Which is the correct statement?

Both are correct

32
New cards

A continuous and unobstructed route of exi fro mone point in a building/structure/facility to a public way consisting of 3 distinct parts

Means of egress

33
New cards

Door openings in means of egress shall not be less than ___ mm in clear width

710

34
New cards

Maximum slide of an accessibel ramp with a rise of 650 mm

1:15

35
New cards

Maximum slope of an accessible ramp wwith a rise of 750mm

1:20

36
New cards

Accessible handrails shall be installed at __ mm and _ mm above ramps and stairs

900 and 700

37
New cards

Accessible parking slots shall have a dimension of

4.00m × 5.00m

38
New cards

All accessible doors shall have a minimum door width of __ mm?

900

39
New cards

Turnabo spaces shll also be provided at or within __ mm of every dead end corrido

3500

40
New cards

Accessible elevators shall be located not more __ meters from the entrance and shall be easy to locate with the aid of directional signs

30

41
New cards

Workstations designed for accessibility shall ensre each desk counter is a minimum of __ mm wide to provide sufficient space for individal using wheelchairs or mobility aids

900

42
New cards

To building his single-attatched home, Mr. ABC acquired a 336 square meter rectangular lot in an R-2 basic zone, with a 12 meter frontage facing 12 meter RROW. Compute:

How many square meters will be left after applying the maximm allowable setback reqirements to maximize the lot?

230 sqm

43
New cards

To building his single-attatched home, Mr. ABC acquired a 336 square meter rectangular lot in an R-2 basic zone, with a 12 meter frontage facing 12 meter RROW. Compute:

Given the maximum allowable PSO of 60 for R-2 basic with firewall, what is the area of the TOSL?

134.40 sqm

44
New cards

To building his single-attatched home, Mr. ABC acquired a 336 square meter rectangular lot in an R-2 basic zone, with a 12 meter frontage facing 12 meter RROW. Compute:

Given the maximum allowable ISA of 30 for R-2 basic with firewall, compute for MACA

302.40 sqm

45
New cards

Compute for the minimum USA

33.60 sqm

46
New cards

What is the maximm length of firewall allowed for this development?

22.40m

47
New cards
48
New cards
49
New cards
50
New cards