topic 4 : river management

0.0(0)
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
Card Sorting

1/36

Study Analytics
Name
Mastery
Learn
Test
Matching
Spaced

No study sessions yet.

37 Terms

1
New cards

why is flood risk increasing in the UK?

  • increasing population so more housing being built on floodplains

  • changes to land use e.g more impermeable surfaces so greater surface run-off

  • changes to weather patterns due to climate change e.g storms, drought

2
New cards

dams and reservoirs - hard or soft?

hard engineering

3
New cards

river straightening and dredging - hard or soft?

hard engineering

4
New cards

embankments (levees) - hard or soft?

hard engineering

5
New cards

flood relief channels - hard or soft?

soft engineering

6
New cards

demountable flood banters - hard or soft?

soft engineering

7
New cards

flood barriers/storm surge barriers - hard or soft?

hard engineering

8
New cards

flood warnings and preparation - hard or soft?

soft engineering

9
New cards

floodplain zoning - hard or soft?

soft engineering

10
New cards

river restoration - hard or soft?

soft engineering

11
New cards

positives of dams and reservoirs

  • can attract tourists

  • can be used to produce electricity by passing water through a turbine within the dam

12
New cards

negatives of dams and reservoirs

  • dams trap sediment - reservoirs can hold less water

  • habitats are flooded so leads to rotting vegetation

13
New cards

cost of dams and reservoirs

very expensive

14
New cards

positives of river straightening and dredging

  • more water can be held in the channel

  • can be used to reduce flood risk in built-up areas

15
New cards

negatives of river straightening and dredging

  • dredging needs to be done frequently

  • speeding up the river increases the flood risk downstream

16
New cards

cost of river straightening and dredging

expensive

17
New cards

positives of embankments (levees)

  • cheap with a one-off cost

  • allows flood water to be contained within the river

18
New cards

negatives of embankments (levees)

  • looks unnatural

  • water speeds up and can increase flood risk downstream

19
New cards

cost of embankments (levees)

cheap

20
New cards

positives of flood relief channels

  • removes excess water from the river channel to reduce flooding

21
New cards

negatives of flood relief channels

  • expensive to build

  • if water levels continue to rise, the relief channel may also flood

22
New cards

cost of flood relief channels

expensive

23
New cards

positives of demountable flood barriers

  • good for places where a permanent sea wall would look ugly

  • more cost efficient than permanent barriers

24
New cards

negatives of demountable flood barriers

  • need 24 hours warning to set the barriers up so risk that not installed in time

  • can only be used in that specific location

25
New cards

cost of demountable flood barriers

cheap

26
New cards

positives of flood barriers/storm surge barriers

  • can protect large areas from storm surges

  • the gates can be closed when a high tide is forecast

27
New cards

negatives of flood barriers/storm surge barriers

  • construction costs high

  • regular maintenance needed

28
New cards

cost of flood barriers/storm surge barriers

very expensive

29
New cards

positives of flood warnings and preparation

  • people have time to protect their properties

  • many posessions can be saved, resulting in fewer insurance claims

30
New cards

negatives of flood warnings and preparation

  • some people may not be able to access the warnings

  • flash floods may happen too quickly for a warning to be effective

31
New cards

cost of flood warnings and preparation

fairly cheap

32
New cards

positives of floodplain zoning

  • more expensive buildings and land uses are further away from the river, so have a reduced flood risk

  • less damage is caused

33
New cards

negatives of floodplain zoning

  • not always possible to change existing land uses

  • planners have to decide what type of flood to plan for

34
New cards

cost of floodplain zoning

cheap

35
New cards

positives of river restoration

  • restoring meanders help to slow down the rivers

  • natural rivers are more attractive and better for wildlife

36
New cards

negatives of river restoration

  • flooding is still likely

  • flood banks will still be needed

  • may result in change of land use

37
New cards

cost of river restoration

cheap at first, but gets really expensive