topic 4 : river management

studied byStudied by 4 people
0.0(0)
learn
LearnA personalized and smart learning plan
exam
Practice TestTake a test on your terms and definitions
spaced repetition
Spaced RepetitionScientifically backed study method
heart puzzle
Matching GameHow quick can you match all your cards?
flashcards
FlashcardsStudy terms and definitions

1 / 36

37 Terms

1

why is flood risk increasing in the UK?

  • increasing population so more housing being built on floodplains

  • changes to land use e.g more impermeable surfaces so greater surface run-off

  • changes to weather patterns due to climate change e.g storms, drought

New cards
2

dams and reservoirs - hard or soft?

hard engineering

New cards
3

river straightening and dredging - hard or soft?

hard engineering

New cards
4

embankments (levees) - hard or soft?

hard engineering

New cards
5

flood relief channels - hard or soft?

soft engineering

New cards
6

demountable flood banters - hard or soft?

soft engineering

New cards
7

flood barriers/storm surge barriers - hard or soft?

hard engineering

New cards
8

flood warnings and preparation - hard or soft?

soft engineering

New cards
9

floodplain zoning - hard or soft?

soft engineering

New cards
10

river restoration - hard or soft?

soft engineering

New cards
11

positives of dams and reservoirs

  • can attract tourists

  • can be used to produce electricity by passing water through a turbine within the dam

New cards
12

negatives of dams and reservoirs

  • dams trap sediment - reservoirs can hold less water

  • habitats are flooded so leads to rotting vegetation

New cards
13

cost of dams and reservoirs

very expensive

New cards
14

positives of river straightening and dredging

  • more water can be held in the channel

  • can be used to reduce flood risk in built-up areas

New cards
15

negatives of river straightening and dredging

  • dredging needs to be done frequently

  • speeding up the river increases the flood risk downstream

New cards
16

cost of river straightening and dredging

expensive

New cards
17

positives of embankments (levees)

  • cheap with a one-off cost

  • allows flood water to be contained within the river

New cards
18

negatives of embankments (levees)

  • looks unnatural

  • water speeds up and can increase flood risk downstream

New cards
19

cost of embankments (levees)

cheap

New cards
20

positives of flood relief channels

  • removes excess water from the river channel to reduce flooding

New cards
21

negatives of flood relief channels

  • expensive to build

  • if water levels continue to rise, the relief channel may also flood

New cards
22

cost of flood relief channels

expensive

New cards
23

positives of demountable flood barriers

  • good for places where a permanent sea wall would look ugly

  • more cost efficient than permanent barriers

New cards
24

negatives of demountable flood barriers

  • need 24 hours warning to set the barriers up so risk that not installed in time

  • can only be used in that specific location

New cards
25

cost of demountable flood barriers

cheap

New cards
26

positives of flood barriers/storm surge barriers

  • can protect large areas from storm surges

  • the gates can be closed when a high tide is forecast

New cards
27

negatives of flood barriers/storm surge barriers

  • construction costs high

  • regular maintenance needed

New cards
28

cost of flood barriers/storm surge barriers

very expensive

New cards
29

positives of flood warnings and preparation

  • people have time to protect their properties

  • many posessions can be saved, resulting in fewer insurance claims

New cards
30

negatives of flood warnings and preparation

  • some people may not be able to access the warnings

  • flash floods may happen too quickly for a warning to be effective

New cards
31

cost of flood warnings and preparation

fairly cheap

New cards
32

positives of floodplain zoning

  • more expensive buildings and land uses are further away from the river, so have a reduced flood risk

  • less damage is caused

New cards
33

negatives of floodplain zoning

  • not always possible to change existing land uses

  • planners have to decide what type of flood to plan for

New cards
34

cost of floodplain zoning

cheap

New cards
35

positives of river restoration

  • restoring meanders help to slow down the rivers

  • natural rivers are more attractive and better for wildlife

New cards
36

negatives of river restoration

  • flooding is still likely

  • flood banks will still be needed

  • may result in change of land use

New cards
37

cost of river restoration

cheap at first, but gets really expensive

New cards
robot