Direct conversion
changing from an old to a new system by terminating the old when the new is introduced
Conceptual design specifications
requirement specifications for systems output, data storage, input, processing procedures, and operations
Scheduled report
report prepared on a regular basis, with a pre-specified content and format
Acceptance test
using real transactions to determine if user-developed acceptance criteria are met
Postimplementation review
review of new systems after operating for a brief period to ensure it meets planned objectives and review system controls.
Processing test data
processing valid and erroneous transactions to see if a program operates as designed and errors are detected and corrected
Pilot conversion
implementing a new system in one location, resolving its problems, and then implementing it in the rest of the org
Program maintenance
updating a computer program due to changed user needs, fixing bugs, or legal or regulatory changes
Structured programming
modular programming approach; each module performs specific functions and is coordinated by a control module
Postimplementation review report
report that analyzes a newly added system to determine if it achieved its intended purpose
Demand report
report with a pre-specified content and format, prepared only on requests
Parallel conversion
changing from an old to a new system by operating both simultaneously until confident that the new system functions correctly
Walk-throughs
step-by-step reviews of program logic to find incorrect logic, errors, omissions, or other problems
Physical systems design report
summarizes what was accomplished in physical design; used to determine whether to proceed to implementation
Phase-in conversion
gradually replacing elements in an old system with new elements until the old system is replaced
Triggered exception report
report with pre-specified content and format, prepared in response to abnormal conditions
Systems implementation
process of installing hardware and software and getting the IS up and running
Special purpose analysis report
report with no pre-specified content, format, or pre-specified schedule; usually prepared at management's request
Implementation plan
written plan showing how the new system will be implemented and when the project is complete and the IS operational
Debugging