PROFPRAC01: Lecture03 - PD 1096 (PT1)

4.0(1)
studied byStudied by 2 people
4.0(1)
full-widthCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/35

encourage image

There's no tags or description

Looks like no tags are added yet.

Study Analytics
Name
Mastery
Learn
Test
Matching
Spaced

No study sessions yet.

36 Terms

1
New cards

National Building Code of the Philippines

Presidential Decree 1096 is also known as

2
New cards

February 19, 1977

PD 1096 was issued and promulgated on ____________

3
New cards

not be affected

Buildings and/or structures constructed before the approval of this Code shall _________________ thereby except when alterations, additions, conversions, or repairs are to be made.

4
New cards

Building Official

A person designated by a government authority to administer and enforce the provisions of a building code.

5
New cards

Secretary

he/she may designate incumbent Public Works District Engineers, City Engineers and Municipal Engineers to act as Building Officials in their respective areas of jurisdiction.

6
New cards

2 years

one of the qualifications of Building Officials wherein he/she is a member of a duly accredited organization for not less than ___________

7
New cards

5 years

one of the qualifications of Building Officials wherein a member has at least ________ of diversified and professional experience

8
New cards

Duties of a Building Official

This person is in charge of the following: Enforcement of provisions, Supervision of the issuance and processing of permits, Quarterly Reports to the Secretary and Annual Inspections

9
New cards

Traditional indigenous family dwellings

These dwellings are Exempted in the National Building Code (Cost not Exceeding P15,000l, constructed of native materials)

10
New cards

Building Permits

Official documents from a local government or other authority that allow the beginning of a construction or remodeling project.

11
New cards

five

At least _________ sets of corresponding plans and specifications prepared, signed, and sealed to obtain a building permit

12
New cards

Transfer Certificate of Title (TCT)

In the Philippines, the Lot Title is known as the __________ and describes the location, bearings, area, and identifies the owner.

13
New cards

within fifteen days

The Building Official shall, within _______ days from payment of the required fees by the applicant, issue the building permit.

14
New cards

one year

A building permit issued shall expire and become null and void if the building or work authorized therein is not commenced within a period of ____________ from the date of such permit

15
New cards

120 days

the building or work so authorized is suspended or abandoned at any time after it has been commenced, for a period of ____________ from the date of such permit

16
New cards

Owner

who is issued or granted a building permit under this Code shall engage the services of a duly licensed architect or civil engineer to undertake the full time inspection and supervision of the construction work.

17
New cards

Certificate of Occupancy

Permission by the municipal inspector to occupy a completed building structure after being inspected and having complied with building codes.

18
New cards

30 days

A Certificate of Occupancy shall be issued by the Building Official within ____________ if after final inspection and submittal of a Certificate of Completion

19
New cards

Type I

Type of construction shall be of wood construction. The structural elements may be any of the materials permitted by this Code.

20
New cards

Type II

Type of construction shall be of wood construction with protective fire-resistant materials and one-hour fire-resistive throughout:

Except, that permanent nonbearing partitions may use fire-retardant treated wood within the framing assembly

21
New cards

Type III

Type of construction shall be of masonry and wood construction. Structural elements may be any of the materials permitted by this Code: Provided, that the building shall be one-hour fire-resistive throughout. Exterior walls shall be of incombustible fire-resistive construction.

22
New cards

Type IV

Type of construction shall be of steel, iron, concrete, or masonry construction. Walls, ceilings, and permanent partitions shall be of incombustible fire-resistive construction:

Except, that permanent non-bearing partitions of one-hour fire-resistive construction may use fire-retardant treated wood within the framing assembly.

23
New cards

Type V

shall be fire-resistive. The structural elements shall be of steel, iron, concrete, or masonry construction. Walls, ceilings, and permanent partitions shall be of incombustible fire-resistive construction.

24
New cards

Fire Zone

areas within which only certain types of buildings are permitted to be constructed based on their use or occupancy, type of construction, and resistance to fire.

25
New cards

highly restrictive fire zone

A building or structure which is located partly in one fire zone and partly in another shall be in the more ___________________________, when more than one-third of its total floor area is in such zone.

26
New cards

Fire-resistive rating

the degree to which a material can withstand fire

27
New cards

Fire Resistive Time Period Rating

the length of time a material can withstand being burned which may be 1 hour, 2 hours, 3 hours, 4 hours or more.

28
New cards

750mm

Eaves over required windows shall not be less than ______________ from the side and rear property lines.

29
New cards

2m

dwelling shall be at least ____ from the property line

30
New cards

90%

The dwelling shall occupy not more than ________ of a corner lot

31
New cards

80%

The dwelling shall occupy not more than ________ of a inside lot

32
New cards

250mm; 600mm

Footings shall be of sufficient size and strength to support the load of the dwelling and shall be at least _______ thick and _______ below the surface of the ground.

33
New cards

200 kg/sqm

The live load of the first floor shall be at least

34
New cards

150 kg/sqm

The live load of the second floor shall be at least

35
New cards

120 kg/sqm

The wind load for roofs shall be at least_______ for vertical projection.

36
New cards

200mm; 200mm

Stairs shall be at least 750 millimeters in clear width, with a rise of ______ and a minimum run of ______.

Explore top flashcards