NCCER module 6 ( intro to basic rigging

0.0(0)
studied byStudied by 0 people
0.0(0)
full-widthCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/9

encourage image

There's no tags or description

Looks like no tags are added yet.

Study Analytics
Name
Mastery
Learn
Test
Matching
Spaced

No study sessions yet.

10 Terms

1
New cards

the max load weight that a sling is designed to carry is the?

rated capacity

2
New cards

most alloy steel chain slings can be used in Temps up to?

500°F (260°c)

3
New cards

when a tattle tail has been pulled into the jacket of a synthetic sling, the sling most likely has been?

overloaded

4
New cards

if a wire rope sling appears to be damaged the decision to keep it in service must be made by a?

competent person

5
New cards

because of the need for increased toughness, shackles for most overhead lifting are made from?

forged steel

6
New cards

with type of hook is designed to be used on allay steel chain slings?

grab hooks

7
New cards

to lift heavy loads, all chain hoists use a?

gear system

8
New cards

a type of hand operated winch device that should never be used for vertical lifts is a?

common come along

9
New cards

two choker hitches are recommended when lifting a load longer then?

12 feet

10
New cards

if an emergency occurs during a riggin operation. who is allowed to give the emergency stop hand signal?

anyone on ground within sight of the crane operator