1/46
Looks like no tags are added yet.
Name | Mastery | Learn | Test | Matching | Spaced |
---|
No study sessions yet.
Nepal HDI
0.6
how many doctors per thousand
19/1000
% SWA
88%
% pirimary employment
94%
% urban populaion
17%
magniutde of ghorka earthquake
7.8
aftershock on
12th may 7.3mw
first shock
25th apriil 2015, 7.8mw
thrust plane
120×80km
ground shaking was felt in
india and china
depth of Ghorkha earthquake
8.2km
mass movment involved
landslides and avalancche at Everest Base Camp
residents reisde here by
necessity, ack of alternative, eentire nation lives in himalayas and foothills
Farming depedent so
live on hillslpopes
torusim generates
$700m a year and is main ndustry
what industry is a very singifcant employer
trekking and climing industry
how many kille
8,000
how many missing from ghorka earthquke
34
How may died at base camp de to averlanche
20
how manyinjured at everest base camp
120timin
g important
saturday aternoon
India issues
78 killed, 500 injured
China issues
4 killed, 200 injured
How many displaced from Kathmandu valley
2.8m
Ho many reuired food assistance
1m
young women weve vulnerable to
rafficking
how much damage ($), homes
$10bn, 473,000 homes
erthquake, pre monsoon
disrupted gorwing season, for a cunty dependent on farming
Earthquake
undemrined proggress towards political stability Ne
India accusedNepal for
using ad for self promoton
earhtuqka eprompted
awareness
what % below poverty
20%
onyl management of hazard was
afforestation to reduce mass ovmement, yet threatened by pressure for fuel, building materials and fodder for livestock
everesy clmibing season clsoed, firs time in
41 years no climber on it
1994 building codes limited
by variable compliance
houses econuarged to have a go-bag
dreid food, bottle water, wpt, whistle
go ag only to be used when
coordinated repsonse not possible
NDRRMA
established need for resrouces to coordinate prpearness,
NDRRMA supproted by
world bank
NSET STANDS FOR
National Society for arthquake Technology N
NSET worked with NGOS to make
disaster preparedness netowkr
NDRRMA issue
established after Ghorkha event
6 yars later
still rural households with no help
many drural housheolds had not access
to loans
after 6 yers NRA clims
93% completion
delayed by
2020 Covid , 6 month delay
NDRRMA made progress in asesmic desing
retrofitting eg metal conrete walls