ERP Godin Final

0.0(0)
studied byStudied by 0 people
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
Card Sorting

1/53

encourage image

There's no tags or description

Looks like no tags are added yet.

Study Analytics
Name
Mastery
Learn
Test
Matching
Spaced

No study sessions yet.

54 Terms

1
New cards

In process industries like chemicals and beverages, the bill of materials is also known as a(n)

Formula

2
New cards

Which one of the following best describes a work center?

A location where value-added work needed to produce a material is carried out

3
New cards

All of the following can serve as a work center except

A shipping dock

4
New cards

Which one of the following best defines material staging?

Component materials are moved from storage and prepared for use

5
New cards

What term identifies the list of materials needed to produce one or more units of a finished good?

Bill of materials

6
New cards

At what level are material requirements planning (MRP) and work scheduling data defined?

Plant level

7
New cards

Which of the following is not a step in the production process?

Billing

8
New cards

If a company has adopted the make-to-stock strategy, what is the trigger for the production of goods?

Need to increase inventory

9
New cards

What step in the production process is used to enter data in to the SAP ERP system when the operations needed to produce a materials are completed?

Confirmation

10
New cards

What operation in the routing is sometimes necessary to prepare materials for use in production?

Material staging

11
New cards

Which of the following is not an outcome of a goods issue to a production order?

A goods receipt is automatically recorded

12
New cards

In the production process, a goods issue reflects

Issuing raw materials or semifinished goods to a production order

13
New cards

What is a stock transfer used for?

To physically move materials within the enterprise from one organizational level or location to another

14
New cards

Which of the following represents the hierarchy of a warehouse?

Warehouse, storage type, storage section, storage bin

15
New cards

The money tied up in inventory best represents

An opportunity cost.

16
New cards

A purchase requisition is

A request to purchase materials.

17
New cards

Requirements in the material planning process specify

How many of the materials are needed and when they are needed.

18
New cards

The organizational data elements in material planning are:

Client, company code, plant, storage location.

19
New cards

A company has two options for procuring materials: make or buy. Which MRP data view of the material master will the ERP system consider for this decision?

MRP 2

20
New cards

Which of the following statements best represents what procurement type indicates?

Whether a material is produced in house, obtained externally, both, or none

21
New cards

MRP type specifies

The production control technique used in planning.

22
New cards

Replenishment lead time is

The time between placing an order and receiving the materials.

23
New cards

Which of the following statements about consumption-based planning is TRUE?

Planning is based on historical data.

24
New cards

Which of the following options represents categories of consumption-based planning?

Forecast-based planning, time-phased planning, reorder-point planning

25
New cards

A company would be most likely to apply consumption-based planning for which of the following products?

Pen

26
New cards

The MRP technique calculates the requirements for a material based on

The material's dependence on other materials.

27
New cards

Exploding the BOM refers to

Calculating and planning requirements for materials at all levels of the BOM.

28
New cards

Requirements that are calculated based on actual and forecasted sales are known as

Planned independent requirements.

29
New cards

The lot size key specifies the

Procedure that is used to determine the lot size.

30
New cards

The static lot-sizing procedure

Specifies a fixed quantity based on either fixed lot size or lot-for-lot.

31
New cards

Setup time, processing time, and interoperation time are elements of

In-house production time.

32
New cards

Setup time is the time required to

Set up the work centers used in production.

33
New cards

In SAP ERP production planning strategy, net requirements planning (Strategy 10), procurement proposals are based on

PIRs, without regard to CIRs.

34
New cards

Consider the following scenario, then choose which one of the options below corresponds to the level of CIRs and PIRs after consumption. Before consumption: Procurement proposal for CIRs: 50Procurement proposal for PIRs: 50

CIRs: 50, PIRs: 0

35
New cards

What does SOP stand for?

Sales and operations planning

36
New cards

What is SOP used for?

Forecasting and planning

37
New cards

After the SOP process has generated the production plan,

The plan is transferred to demand management.

38
New cards

The planning table is best defined as

A spreadsheet-like tool used to complete the tasks in SOP.

39
New cards

Given the information below, calculate disaggregated quantities for touring bikes (TOUR) and off-road bikes (ORBK). Total production = 100 TOUR proportion factor = 35ORBK proportion factor = 65

TOUR = 35, ORBK = 65

40
New cards

Which of the following statements about the goods receipt step are NOT true?

It results in a decrease in inventory.

41
New cards

The key organizational level associated with inventory management is

Storage location.

42
New cards

When do unplanned receipts occur?

When a reference document does not exist

43
New cards

Which of the following scenarios requires material-to-material posting?

Changing the material number of a material

44
New cards

Which of the following options is appropriate when two locations are physically close to each other and there is no significant time lag between issue and receipt?

One-step procedure

45
New cards

A storage location-to-storage location transfer involves which of the following?

A stock transfer between two storage locations within the same plant

46
New cards

Shelf storage, pallet storage, and rack storage are examples of

Storage types

47
New cards

A storage type is a division of a warehouse based on the characteristics of the

Space, materials, and activity.

48
New cards

A picking area groups which of the following elements?

Storage bins, based on similar picking strategies

49
New cards

Shelves, stacks, and aisles are examples of

Coordinate systems for addresses.

50
New cards

Which of the following represents the document used to plan the movement of materials into and out of bins in a warehouse?

Transfer request

51
New cards

Which of the following is a request to change the status of the material?

Posting change notice

52
New cards

When creating a transfer order, you find that a particular material has to be moved from multiple source bins. Which of the following statements follows from this scenario?

The transfer order will have multiple line items for the material.

53
New cards

The ERP system can create transfer orders automatically, but only when

A reference document exists.

54
New cards

Warehouse management is typically used

By organizations that have either large quantities of materials or an expensive inventory.