Electrical Power Production Vol. 5

studied byStudied by 0 people
0.0(0)
learn
LearnA personalized and smart learning plan
exam
Practice TestTake a test on your terms and definitions
spaced repetition
Spaced RepetitionScientifically backed study method
heart puzzle
Matching GameHow quick can you match all your cards?
flashcards
FlashcardsStudy terms and definitions

1 / 51

encourage image

There's no tags or description

Looks like no one added any tags here yet for you.

52 Terms

1

Normally the alternating current (AC) volts found within the mission essential power (MEP)-12 bare base equipment can be how high?

4,160

New cards
2

What happens if electrical current between 100 and 200 milliamperes is absorbed by the body?

Instant death from heart failure

New cards
3

Who must perform the isolation of a mission essential power (MEP)-12 generator from a primary distribution center (PDC)?

Qualified electrical systems personnel

New cards
4

Identify the voltage that is considered high voltage. High voltage is any voltage exceeding

600 VAC

New cards
5

The mission essential power (MEP)-12 generator is rated for which power factor

8

New cards
6

What is the maximum distance a MEP-12 can be operated when using a remotely located control panel?

150 feet

New cards
7

Mission essential power (MEP)-12 generators are positioned so that the prevailing winds blow

in the same direction as the radiator fan

New cards
8

What can you do to prevent the brakes from being applied during backing of a mission essential power (MEP)-12 generator

Block the surge brakes

New cards
9

What is the maximum towing speed you are allowed to tow a mission essential power (MEP)-12 diesel generator on paved surfaces

20 MPH

New cards
10

At a bare base site, how many days of fuel is expected to be maintained at each prime power generation location

7

New cards
11

How many connections does a fuel bladder have

4

New cards
12

How many feet tall should the berms be to contain a possible fuel spill at a mission essential power (MEP)-12 fuel system layout

New cards
13

During a pre-operation inspection on a mission essential power (MEP)-12 generator the voltage regulator switch should be in which position

Auto

New cards
14

When starting a mission essential power (MEP)-12 which event(s) take place when the engine toggle switch is released to the run position

The engine will accelerate to rated speed and the voltage regulator will flash the field

New cards
15

How often should you perform running checks during the time that the mission essential power (MEP)-12 generator is online

At least once an hour

New cards
16

Meter readings are recorded on a mission essential power (MEP)-12 generator every

hour

New cards
17

Motorization of a generator occurs when

all load has been removed from the generator while it is connected to the bus

New cards
18

Which meter readings indicate motorization of a generator

The kW meter at zero or lower, the ammeter is reading amperage, and the PF meter is moving off scale

New cards
19

How are crosscurrents between parallel generators minimized if the bus voltage is low and the power factors (PF) are different

Raise the voltage to the lead unit

New cards
20

How are crosscurrents between parallel generators minimized if the bus voltage is low and the power factors (PF) are the same

Raise the voltage to all units

New cards
21

How are crosscurrents between parallel generators minimized if the bus voltage is high and the power factors (PF) are the same

Lower the voltage to all units

New cards
22

Typically mission essential power (MEP)-12 generators are scheduled for maintenance after operating for

300 hours

New cards
23

When removing mission essential power (MEP)-12 oil filters how many main filters are replaced

4

New cards
24

What is the last step in performing a 300 hour mechanical preventative maintenance inspection (PMI) on a mission essential power (MEP)-12 generator

Update the historical records

New cards
25

What is the ratio of the T4-T9 transformers on a mission essential power (MEP)-12 generator

20:1

New cards
26

What size fuses are inspected on the CB5 during a high voltage inspection on a mission essential power (MEP)-12 generator

170 Amp

New cards
27

When using a MEP-12 ladder diagram the positive side of the diagram is located on the

top of the diagram

New cards
28

When using a crew/operator troubleshooting chart in a mission essential power (MEP)-12 TO what should you do if you see the following statement: refer to the next higher level on maintenance

Proceed to the organizational troubleshooting chart

New cards
29

How many paralleling modes can a basic expeditionary airfield resources (BEAR) power unit (BPU) operate in

3

New cards
30

Which power factor is the basic expeditionary airfield resources (BEAR) power unit (BPU) alternator rated

75

New cards
31

How is the radiator fan speed controlled on the basic expeditionary airfield resources (BEAR) power unit (BPU)

Viscous clutch

New cards
32

What is the preferred fuel for the basic expeditionary airfield resources (BEAR) power unit (BPU)

JP-8

New cards
33

What is the maximum time the basic expeditionary airfield resources (BEAR) power unit (BPU) can run on a full day tank

1 hour at full load

New cards
34

Where is the coolant level indicator located on the basic expeditionary airfield resources (BEAR) power unit (BPU)

Inside the radiator compartment

New cards
35

Where are the motor protectors located on the basic expeditionary airfield resources (BEAR) power unit (BPU)

Electrical box 2

New cards
36

What resource is used to regulate moisture in electrical box 3 on the basic expeditionary airfield resources (BEAR) power unit (BPU)

Heat strips

New cards
37

Where are the decompression doors located on the basic expeditionary airfield resources (BEAR) power unit (BPU)

On the bottom

New cards
38

If more than one basic expeditionary airfield resources (BEAR) power unit (BPU) is installed which copper conductor ground grid cable size must be used to connect them to the ground grid

#2 AWG

New cards
39

Which screen on the basic expeditionary airfield resources (BEAR) power unit's (BPU) digital control system (DCS) is the fuel source selected

Main

New cards
40

What are the three tabs in the basic expeditionary airfield resources (BEAR) power unit's (BPU's) remote operating platform (ROP) software

Master, detail, and configuration screens

New cards
41

In the basic expeditionary airfield resources (BEAR) power unit's (BPU's) remote operating platform's (ROP) configuration screen what three colors provide information on communication?

Black, green, and red

New cards
42

What is used to extract capture files from the basic expeditionary airfield resources (BEAR) power unit (BPU)

InPower BPU

New cards
43

The basic expeditionary airfield resources (BEAR) power unit's (BPU's) technical order dived up into

work packages and subordinate work packages

New cards
44

When performing a 400 hour electrical inspection on the basic expeditionary airfield resources (BEAR) power unit's (BPU's) switchgear, what is the required resistance reading for the ground connections

Less than 25 ohms

New cards
45

When performing a 400 hour mechanical inspection on the basic expeditionary airfield resources (BEAR) power unit (BPU) where can total run time for the coolant heater be found

The service adjustments screen on the digital control system (DCS)

New cards
46

How often is the oil changed on the basic expeditionary airfield resources (BEAR) power unit (BPU) when using 15W-40

Every 400 hours

New cards
47

Which type of electrical distribution layout provides two or more paths for current flow to a facility

Loop

New cards
48

How many 60-amp outputs are included on the secondary distribution center (SDC)

16

New cards
49

What is the amperage rating of the mission essential circuit breaker on the secondary distribution center (SDC)

250 amps

New cards
50

How many lights make up the light mast on the TF-2 light cart

4

New cards
51

How often is oil changed on the TF-2

Every 300 hours

New cards
52

How long does it take for the light bulbs on the TF-2 to warm up

Two to four minutes

New cards

Explore top notes

note Note
studied byStudied by 10 people
752 days ago
5.0(1)
note Note
studied byStudied by 8 people
909 days ago
5.0(1)
note Note
studied byStudied by 56 people
899 days ago
5.0(1)
note Note
studied byStudied by 30 people
974 days ago
4.0(1)
note Note
studied byStudied by 1114 people
680 days ago
4.0(6)
note Note
studied byStudied by 58 people
1065 days ago
5.0(1)
note Note
studied byStudied by 6 people
760 days ago
5.0(1)
note Note
studied byStudied by 139196 people
332 days ago
4.8(594)

Explore top flashcards

flashcards Flashcard (49)
studied byStudied by 111 people
543 days ago
4.8(4)
flashcards Flashcard (138)
studied byStudied by 201 people
870 days ago
5.0(4)
flashcards Flashcard (40)
studied byStudied by 21 people
554 days ago
5.0(2)
flashcards Flashcard (60)
studied byStudied by 7 people
15 days ago
5.0(1)
flashcards Flashcard (63)
studied byStudied by 3 people
739 days ago
5.0(1)
flashcards Flashcard (36)
studied byStudied by 30 people
550 days ago
5.0(4)
flashcards Flashcard (28)
studied byStudied by 2 people
729 days ago
5.0(1)
flashcards Flashcard (46)
studied byStudied by 232 people
69 days ago
5.0(1)
robot