BOM
A bill of materials (BOM) identifies the components that are necessary to produce a material.
Work center
location where value-added work needed to produce a material is carried out.
Product routing
a list of operations that a company must perform to produce a material
Material staging
the operation whereby the component materials are moved from storage and prepared for use
Trigger for production of goods in the make-to-stock strategy
production is triggered by the material planning process, which is concerned with ensuring that sufficient quantities of materials are always available.
Basic time elements to produce a material
setup time, processing time, and teardown time.
Production resource tool examples
Examples of PRTs are calibration or measurement instruments, jigs and fixtures, and documents such as engineering drawings.
Outcomes of goods issue in production order
The material master, general ledger accounts, and material reservations are updated. A material document and FI document are created. The actual costs associated with material consumption are calculated and added to the production order.
When does confirmation in the production process happen
When the finished goods have been produced, the person completing the work records a confirmation of the work completed in the SAP ERP system.
Type of data in a confirmation
quantities, operations completed, durations, work center, personnel data, reason for variance
User inputs in a goods receipt
The production order number, quantity received, date, and location (plant and storage location) are provided by the user based on the completed work.
What is in a stock requirement list
identifies all of the activities in the system that can potentially impact the quantity of material in inventory.