1/8
Looks like no tags are added yet.
Name | Mastery | Learn | Test | Matching | Spaced | Call with Kai |
|---|
No analytics yet
Send a link to your students to track their progress
1,
Initial:
obtain ATIS
descent checklist complete
2.
Arrival:
torque approx 30%
150-170 KIAS
start before landing checklist
3.
downwind:
flaps approach
130-140 KIAS
4.
abeam touchdown point:
gear down
before landing checklist complete
5.
Base:
130KIAS
6.
Final:
130-140 KIAS Vyse min
when landing assured
flaps down
transition to Vref
yaw dfamp off
props full forward
7.
threshold:
gear recheck down\
airspeed Vref
power idle
8.
landing:
ground fine or reverse
brake as necessary
7.1
rejected/balked landing
power maximum alloable
pitch 10 degrees nose up
airspeed Vref
establish normal climb
when clear of obstabcles
flaps approach at or above Vref+10kts
gear up when positive rate
flaps up at or above Vyse (blue line)