Information Systems Lecture Notes Summary

0.0(0)
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
Card Sorting

1/29

flashcard set

Earn XP

Description and Tags

Flashcards covering key concepts from the Information Systems lecture notes, including definitions and important attributes.

Study Analytics
Name
Mastery
Learn
Test
Matching
Spaced

No study sessions yet.

30 Terms

1
New cards

Data refers to __.

a collection of organized facts and figures.

2
New cards

Information is the and form of data.

processed and meaningful.

3
New cards

Good Information should possess attributes such as __, __, __, __, __, __, and __.

Accuracy, Timeliness, Brevity, Reliability, Relevance, Understandable, Integrity.

4
New cards

The objectives of a system are expressed as its or .

long term purpose or characteristics.

5
New cards

A system is a set of or entities forming an integrated whole.

interacting or interdependent.

6
New cards

An __ system can communicate and exchange data with external systems or users.

Open.

7
New cards

A __ system does not communicate with external systems and processes data internally.

Closed.

8
New cards

In the relational model, a key is used to __ data logically.

organize.

9
New cards

A __ key is used to uniquely define a data set/row in a table.

primary.

10
New cards

The __ is a diagrammatic representation that shows how data flows in a system.

Data Flow Diagram (DFD).

11
New cards

A __ is a method of describing actions when specified conditions are met.

decision table.

12
New cards

In a project, the primary constraints are __, __, and __.

scope, time, and cost.

13
New cards

Project management involves planning, organizing, and managing resources to achieve and .

specific project goals and objectives.

14
New cards

The process of gathering requirements and designing a project plan is part of the __ stage.

Planning.

15
New cards

In __ processing, transactions are processed as they occur.

real-time.

16
New cards

The __ phase of the SDLC involves monitoring and supporting the deployed system.

Maintenance.

17
New cards

An __ is a type of network that spans a large physical distance.

WAN (Wide Area Network).

18
New cards

The __ is a worldwide network that transmits data through interconnected networks.

Internet.

19
New cards

A __ is a private network that connects computers within an organization.

intranet.

20
New cards

E-commerce refers to the __ of goods and services over the Internet.

exchange.

21
New cards

The three primary project constraints are often visualized as a __.

triangle.

22
New cards

A __ key references a primary key to maintain database integrity.

foreign.

23
New cards

A __ key is used strictly for data retrieval purposes and does not guarantee unique outcomes.

secondary.

24
New cards

To optimize a project's performance, project managers must consider the __ constraints.

triple (scope, time, cost).

25
New cards

A __ system is characterized by its ability to change state in response to disturbances.

Adaptive.

26
New cards

A system is a collection of related __, operating together toward a common purpose.

components or elements.

27
New cards

Decision trees are used as a __ tool to analyze potential outcomes.

decision support.

28
New cards

A __ processing system is typically used for daily transaction processing.

Transaction Processing System (TPS).

29
New cards

The __ of a project includes final acceptance and documentation.

Closing phase.

30
New cards

The __ is designed to summarize the important aspects of a project.

Terms of Reference (TOR).