Lecture Notes Flashcards

0.0(0)
studied byStudied by 0 people
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
Card Sorting

1/10

flashcard set

Earn XP

Description and Tags

Flashcards generated from lecture notes.

Study Analytics
Name
Mastery
Learn
Test
Matching
Spaced

No study sessions yet.

11 Terms

1
New cards

Virtual Team

A group of people with a shared goal who work in different locations and who engage with each other primarily through phone and other electronic communications.

2
New cards

Vision Statement

A summarized, high-level description about the expectations for a product.

3
New cards

Visual Data and Information

Artifacts that organize and present data and information in a visual format, such as charts, graphs, matrices, and diagrams.

4
New cards

Voice of the Customer

A planning method used to provide products, services, and results that truly reflect customer requirements by translating those customer requirements into the appropriate technical requirements for each phase of project or product development.

5
New cards

Volatility

The possibility for rapid and unpredictable change.

6
New cards

Waste

Activities that consume resources and/or time without adding value.

7
New cards

WBS Dictionary

A document that provides detailed deliverable, activity, and scheduling information about each component in the work breakdown structure.

8
New cards

What-If-Scenario Analysis

The process of evaluating scenarios in order to predict their effect on project objectives.

9
New cards

Wideband Delphi

An estimating method in which subject matter experts go through multiple rounds of producing estimates individually, with a team discussion after each round, until a consensus is achieved.

10
New cards

Work Breakdown Structure (WBS)

A hierarchical decomposition of the total scope of work to be carried out by the project team to accomplish the project objectives and create the required deliverables.

11
New cards

Work Package

The work defined at the lowest level of the work breakdown structure for which cost and duration are estimated and managed.