CAPEX
Capital Expenditure, referring to funds used by a company to acquire, upgrade, and maintain physical assets.
BOQ
Bill of Quantities, a document used in tendering in the construction industry that specifies the materials, parts, and labor required for a project.
HVAC
Heating, Ventilation, and Air Conditioning, a system used for maintaining indoor environmental comfort.
Structural Designing
The process of creating the structural framework of a building to ensure its integrity and stability.
Trimix Flooring
A type of concrete flooring that includes a mixture of cement, sand, and fly ash for improved durability.
Installation & Commissioning
The process of setting up and testing equipment to ensure it is in proper working condition before use.
Material Mobilization
The process of preparing and moving materials to a construction site for ongoing work.
Completion Date
The date by which a particular task or entire project is scheduled to be finished.
Project Delays
Setbacks in the timeline of a project often caused by unforeseen circumstances.
Electrical Layout
A plan showing the arrangement of electrical work in a building, including wiring and fixtures.