1/25
Looks like no tags are added yet.
Name | Mastery | Learn | Test | Matching | Spaced |
---|
No study sessions yet.
SUS
Suite Utilization Schedule
RTP
Ready To Pack
ECM
External Contract Material
NPI
New Project Introduction
Contingency Run
Extra runs of material
ATP
Approval to Purchase
Scrap, Distressed inventory
When a campaign ends, scrap is taken account for. This accounts for material we did not use, or have no future use for, or if it is expiring.
Ferm Zone
This is for schedule break ins to add unplanned modifications to scheduling. Subsequently, you would trigger new POs to make whatever required materials.
MRP
Material Requirements Planning
Claim duration
Time it takes to complete a block
MPS
Master Production Schedule
LRP
Long range plan, can be accessed via SUS
Kevin McGeary
Buffer expert
Greg Brosis
Supervisor for Materials
Platform
Materials that are always ordered regularly
Distressed
extra inventory that is not used
Surplus
extra materials accounted for contingency run
STO: Stock transfer order
Material that we need from another abbvie site
Raw materials
Chemicals, powders, medias (Nicole Rivera)
Commodities
Filters, resin, and bags (Van)
Consumables
Wipes and gloves (Olivia), Though usually are ordered constantly. Do not need approval.
ATP
Approval to Purchase
BRWRR: Batch record worksheet revision request
As a PPer your job is to ask inventory planning for approval
Look up materials in mm04 then look up stock SAP to verify
Life Cycle
Thawing>Inoculation>Fermentation>Purification>Bottling
DRI
Dispensing requirement inputs, make sure that is up to date so that it also populates buffer media schedule
PSP
Project Supply Plan (Bottling schedule, used to check if there are any discrepancies in bottling dates)