1/25
These flashcards cover key vocabulary and concepts from the Exto360 Sales Enablement Intelligence lecture, focusing on critical terms related to commissioning software, project management, and data center operations.
Name | Mastery | Learn | Test | Matching | Spaced | Call with Kai |
|---|
No analytics yet
Send a link to your students to track their progress
Direct commissioning software market
Valued at $1.2-1.5B in 2025, projected to grow to $2.5-4B by 2032-35.
EAM/CMMS handover gap
A critical pain point where no platform builds asset registers during construction/commissioning.
MCC
Mechanical Completion Certificate; formal point when construction is completed.
RFSU
Ready for Start-Up; all pre-commissioning and commissioning are complete.
PAC
Provisional Acceptance Certificate; issued when a facility meets criteria for beneficial use.
FAC
Final Acceptance Certificate; issued after warranty period completion when all obligations resolved.
ITR
Inspection Test Record; fundamental building block of completions used to verify construction.
Loop Testing
End-to-end signal integrity verification for systems.
IQ/OQ/PQ
Installation Qualification, Operational Qualification, and Performance Qualification for validating pharmaceutical systems.
PSSR
Pre-Startup Safety Review; a mandatory OSHA PSM review prior to energizing any system.
CPM
Critical Path Method; a scheduling technique determining the longest sequence of activities.
LDs
Liquidated Damages; pre-agreed penalties for schedule overruns.
Arc Flash
A type of electrical explosion that occurs due to a fault; can be deadly.
PUE
Power Usage Effectiveness; a measure of data center energy efficiency.
BIM
Building Information Model; a digital representation of the physical and functional characteristics of a facility.
COBie
Construction Operations Building information exchange; a standard for structured handover data.
NTP
Notice to Proceed; the formal start of a project.
Substantial Completion
A legal milestone indicating that a project is sufficiently complete for its intended use.
Quality Management NCR
Non-Conformance Report; documents deviations from specifications.
LOTO
Lockout/Tagout; safety procedure for isolating energy sources before working on equipment.
Safety Critical
Referring to systems or components whose failure could lead to unsafe conditions.
EPC
Engineering, Procurement, and Construction; a project delivery model.
EPCM
Engineering, Procurement, and Construction Management; manages contracts without self-performing construction.
Integrated Project Delivery (IPD)
Owner, designer, and builder collaborate under a shared-risk/reward contract.
Data Center Tier Classifications
Uptime Institute classifications that determine the level of redundancy and reliability in data centers.
EAM
Enterprise Asset Management; software used for managing assets and resources.