Quality Management Concepts and Tools

0.0(0)
studied byStudied by 0 people
full-widthCall with Kai
GameKnowt Play
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
Card Sorting

1/20

flashcard set

Earn XP

Description and Tags

These flashcards cover key concepts, definitions, and applications of various quality management tools and methodologies.

Study Analytics
Name
Mastery
Learn
Test
Matching
Spaced

No study sessions yet.

21 Terms

1
New cards

What is Total Quality Management (TQM)?

A company-wide philosophy focused on continuous improvement, everyone’s involvement, and customer satisfaction.

2
New cards

What are the three core ideas of TQM?

  1. Continuous improvement, 2. Everyone involved, 3. Customer satisfaction.

3
New cards

What is the Plan–Do–Study–Act (PDSA) cycle?

  1. Plan: Identify problem, set goal, plan change. 2. Do: Test the change on small scale. 3. Study: Measure results, analyze data. 4. Act: Adopt, adapt, or abandon.
4
New cards

What is a Fishbone (Ishikawa) diagram?

A cause-and-effect diagram used to identify root causes of a problem.

5
New cards

What is Lean?

A methodology to eliminate waste and improve process flow by cutting non-value-added activities.

6
New cards

What is Six Sigma?

A data-driven approach to reduce variation and defects using the DMAIC framework.

7
New cards

What is Lean Six Sigma?

A combined approach where Lean removes waste and Six Sigma reduces variation.

8
New cards

What are the 8 wastes of Lean (DOWNTIME)?

Defects, Overproduction, Waiting, Non-utilized people, Transportation, Inventory, Motion, Extra Processing.

9
New cards

What does 'sigma level' mean?

It measures process consistency; higher sigma means fewer defects.

10
New cards

What is DPMO at 6σ versus 3σ?

6σ ≈ 3.4 defects per million, 3σ ≈ 66,807 defects per million.

11
New cards

What is process yield?

The percentage of outputs without defects.

12
New cards

What are the five steps of 5S?

Sort, Set in Order, Shine, Standardize, Sustain.

13
New cards

What is the goal of 5S?

To create a fast, clean, organized workplace where problems are visible.

14
New cards

When should TQM be used?

For organization-wide, long-term improvements across all service aspects.

15
New cards

When should PDSA be used?

For testing small changes quickly with low risk.

16
New cards

When should Lean Six Sigma be used?

When there’s waste or variation causing delays, rework, or errors.

17
New cards

When should a Fishbone diagram be used?

When a problem is clear but the root cause is unknown.

18
New cards

When should 5S be applied?

When a workspace is messy or confusing and slows down service.

19
New cards

What are the Lean Six Sigma certification belts?

Yellow Belt, Green Belt, Black Belt, Master Black Belt.

20
New cards

Which tool would you use if a hotel chain wants to improve overall guest satisfaction?

TQM – for broad focus on continuous quality improvement.

21
New cards

Which tool would you use if a clinic wants to test text check-in for one week?

PDSA – for small trial to test improvement.

Explore top flashcards

Presidents
Updated 853d ago
flashcards Flashcards (42)
Biology - Chapter 35
Updated 928d ago
flashcards Flashcards (51)
Bio Test 2
Updated 872d ago
flashcards Flashcards (48)
newborn assessment
Updated 301d ago
flashcards Flashcards (122)
ASB 222
Updated 179d ago
flashcards Flashcards (50)
KOR101
Updated 755d ago
flashcards Flashcards (77)
Presidents
Updated 853d ago
flashcards Flashcards (42)
Biology - Chapter 35
Updated 928d ago
flashcards Flashcards (51)
Bio Test 2
Updated 872d ago
flashcards Flashcards (48)
newborn assessment
Updated 301d ago
flashcards Flashcards (122)
ASB 222
Updated 179d ago
flashcards Flashcards (50)
KOR101
Updated 755d ago
flashcards Flashcards (77)