Flashcards covering key concepts related to construction estimating and project planning.
Name | Mastery | Learn | Test | Matching | Spaced |
---|
No study sessions yet.
ROM
Rough Order of Magnitude
Accuracy Level of ROM
-20% to -50% on the low side, and +30% to +100% on the high side.
Hard Costs in a construction estimate
Items that include material, labor, and equipment expense.
Bid estimate (detailed) with an accuracy of -3% to -10% on the low side, and +3% to +15% on the high side.
AACE Class 1 Estimate
Masterformat
A tool used to organize project information in construction specs.
Roles of construction specifications
Serve as a legal basis for the construction contract
2. Define process and material grade (quality)
3. Establish workmanship standards
4. Provide guidelines for resolving disputes
5. Offer basis for cost estimate.
Components of construction plan sheet numbers
i. Discipline Designator
ii. Sheet Type
iii. Sequence Numbers.