1/11
Looks like no tags are added yet.
Name | Mastery | Learn | Test | Matching | Spaced |
---|
No study sessions yet.
what is the purpose of shutdown outside the control room
Cold shutdown of the MCR is determined uninhabitable by the CRS for any reason other than fire
which letdown isolation valves can be isolated from the control room via App R
letdown isolation valve 515, 516
what PZR controls are available from the RSP?
low PZR pres setpoint reset and bypass
low SG press setpoint reset
MSIS actuation
what initial actions are taken prior to evacuating the CR?
trip the reactor
check power lowering and all FSCEAs inserted
*perform boration from the RSP if necessary
*SPTAs not performed
Stop one RCP in each loop (trip from SWGR if necessary)
what actions are taken at the RSP?
emergency borate if power not lowering or any FSCEA not inserted
align charging to the RWT
open 536 and close 501 from NHN-M72
from the RSP what is our PZR level band?
10-65% trending to 33-53%
what is the Tcold band from the RSP
560-570F
what are the SG level and pressure ranges from the RSP?
35-80% WR
1140-1200 PSIA
what actions from the RSP are taken if SBCS or FWCS are not controlling in automatic
actuate MSIS
control ADVs from RSP
feed with AFB or AFA
what actions are taken to cooldown the plant that affect the SG?
feed with AFA or B
trip MFPs
control with ADVs
initiate an MSIS
these actions are performed due to a lack of control systems and instruments available for the steam plant at the RSP
when entering the MCR what actions are taken on ADVs and AF?
if being used transfer ADV and AF control back to the MCR
when evacuating the MCR what will cause the EAL classification to be an ALERT vs SITE AREA EMERGENCY
upon MCR evacuation control of safety functions must be established within 15 minutes to be EAL of ALERT. greater than 15 minutes is a SITE AREA EMERGENCY