invited bid
prequalified contractors are preselected and given the opportunity to bid
phase bid
used during fast-track construction to allow systems with long lead times to be bid firm (and therefore fabricated earlier)
negotiated bid
contractor brought on at the beginning of the project to provide feedback, and after construction documents the bid is negotiated between the owner and the contractor
masterformat
specs organized by material or process (concrete, excavation
uniformat
specs organized by system (foundations, stairs)