Situation: During the summer holidays, a couple decided to have their house repaired. They acquired the services of Architect "A" to give the roofing repairs to their father who happens to be a
roofing contractor. Everything went well until the rains came. Now the house is flooding and leaks coming everywhere. They asked Architect "A" to make good the effects but the Architect refused.
Who is liable for the damages?
The Roofing Contractor, he was the one who repaired the roof
3 multiple choice options
Situation: Big scale projects sometimes have a lot of phases and areas that may require help from numerous architects and consultants per phase. A concept architect does the overall concept of the project. What is his liability on the project?
He has no liability
3 multiple choice options
After graduating from BS Architecture course in the Philippines', Juan decided to work in Singapore. He work there for 2 years and decided to go back to Philippines to take Architecture Licensure exam. What should he do to file his requirements?
His mentor should be a Filipino RLA if working abroad to qualify
3 multiple choice options
What should Juan's boss do to practice Architecture in the Philippines?
He should collaborate with a Filipino firm/Architect and be partners, to be able to practice Architecture in the Philippines
3 multiple choice options
If Juan's boss could put up an architectural firm in the Philippines, what should be his first move to register his business?
Get a license to practice architecture in the Philippines as a foreign partner at PRC
3 multiple choice options
If Juan and his boss were to be partners in a firm in the Philippines, where should there company be registered?
SEC only
3 multiple choice options
Situation: Owner a hired b to design his condominium located in a commercial area. After several meetings, Architect B was able to produce a schematic Design which A subsequently approved .However, Owner A had a change of heart and decided that he doesn't want Architect B for the project anymore. How much compensation is Architect B entitled?
10% of construction cost
3 multiple choice options
Situation: Architect Guevara was commissioned to do a residential project. Everything worked out until everything was done except that the owner ran out of budget to start the construction. According to the Law, how much is Arch. Guevara entitled to collect?
90%
3 multiple choice options
Situation: Owner A wants to build a Diplomatic Function hall for at least 800 persons. He hires Architect B for the project. Architect B later informs owner A that they will need to hire a professional
since he has limited knowledge in function hall design. Who should they hire?
Acoustics Engineer
3 multiple choice options
Who will be the prime professional for the project?
Architect B and the professional
3 multiple choice options
Who should responsible for the remuneration of the professional?
Owner A, to be paid directly by him
2 multiple choice options
How much will be the remuneration for acoustics Engineer's services?
15% of the total construction cost of the scope of his services
3 multiple choice options
Situational: Arch. Yu was commissioned by his friend as the Architect for a town house project. He was specifically asked to prepare brochures for the marketing of the project. What type of services did Arch. Yu rendered for the project?
Pre-design Services
3 multiple choice options
For the helping his friend market the project, what type of compensation should. Arch cassia receive?
Multiple of Direct Personnel expenses
3 multiple choice options
Situation (15-17): Architect A is the principal architect of an architectural firm. Architects B & C are partners and they are in charge of the design team. However it is still Architect A who signs and seals all the drawings. Recently, they hired architects D&E both RLA's to be in-charge of the production team. What is the position of Architects D&E?
Junior Architect
3 multiple choice options
Who is liable for the drawings under the law?
Architect B&C
3 multiple choice options
Situation (37-38) Mr. Tan hires Architect Cheng for a project. Arch. Cheng has already finished preparing drawings for construction documents. Arch. Cheng heard that Mr. Tan is finding a contractor for his house, he offered to Mr. Tan that he can give the design fee free if he will be chosen
as the contractor. At what instance did Arch. Cheng violate the standard of professional practice in architecture?
By the time Arch. Cheng offered to the owner that his design fee is free so he could be chosen as the contractor.
3 multiple choice options
What type of service did Arch. Cheng offer to his client?
General construction services
3 multiple choice options
Situation (19-20): A family of architects and engineers plans to set-up and architectural company to cater architectural services. What percentage of share should the architect have?
75%
1 multiple choice option
For whom they would register their business first?
SEC
3 multiple choice options
Situation: Arch. Dela Cruz was commissioned by his friend as the Architect for a Townhouse Project. He was specifically asked to prepare brochures for the marketing of the project. What type of service did Arch. Bryan rendered for the project
Pre-Design Services
3 multiple choice options
Situation: As per Client's request, the Architect made some revisions. Since time is of the essence, he decided not to coordinate with the Engineering Consultants. After pouring, he discovered that a beam is set lower than the required headroom clearance. What is the lesson learned?
Always coordinate with consultants and project engineers
3 multiple choice options
Design build by maximum cost, how much is the architect remunerated?
10% inclusive of arch fee
3 multiple choice options
If an Architect is hired to design a Supermarket with construction cost of less than 50M pesos, how much should he/she charge as minimum basic fee?
6%
3 multiple choice options
What is the minimum dimension of a Kitchen?
1.50 m x 2.00 m
3 multiple choice options
Which is an unethical action with respect to the Architect's responsibility to his client?
guarantee any estimates or cost of the work
3 multiple choice options
How are projects classified in determining the basis for the Architect's Basic Fee?
degree of project complexity
3 multiple choice options
What offense is committed when an architect is found using the seal of another architect?
misdemeanor
3 multiple choice options
The architect refuses to give the original plan of the Owner. Why?
All of the reasons listed here
3 multiple choice options
In case of death of the Architect-on Record, who can give official provisions to reproduce his/her plans?
nobody
3 multiple choice options
A person found preparing architectural plans without the necessary license is guilty of what?
Illegal practice
3 multiple choice options
If a draftsman is making architectural plans without necessary license, he is guilty of what?
none of the choices
3 multiple choice options
In Reciprocity agreement, the Filipino architects are allowed in other country to?
Be registered as professionals
3 multiple choice options
After passing your board exam what must you do?
Work in a company to gain
more experience
3 multiple choice options
How many percent should the Architect compensated after the Contract Document Phase even the project not commenced?
90% of PCC
3 multiple choice options
How is a Building and Facilities Administration Architect remunerated?
Percentage of gross rentals,
maintenance and security fees
3 multiple choice options
How many percent should the Architect be compensated after the Contract Document Phase even if the project has not commenced?
None of the above
3 multiple choice options
For the client what would NOT be the basis for the architect's professional fee?
Personal relations
3 multiple choice options
What would be the best dress of an architect if he is going to meet the client for a new project?
Business attire
3 multiple choice options
After passing the board exam, you and your classmates set-up an architectural office where would you go first to register your office?
SEC
3 multiple choice options
What is the Percentage of the engineers in Design Corporation with architect?
75%
3 multiple choice options
What Plan does the electronic plan belong?
Electronic
3 multiple choice options
85 % of the construction work is done when the owner got bankrupt. How much the architect must be compensated?
90%
3 multiple choice options
For a design-build project, who keeps the record on site?
architect
3 multiple choice options
What is not a recommended dimension for turning space of the disabled?
1.00 meters
3 multiple choice options
What is the minimum run for stairs according to the NBC?
250 mm
3 multiple choice options
How much is the Minimum basic fee from the PCC for Simple Projects without partitions, such as Hangars?
6%
For repetitive building designs, how much is the Minimum basic fee from the PCC for any succeeding structures after the 3rd repetitive design?
40% of BF
3 multiple choice options
Malpractice of Architecture shall not exceed the amount of how much?
Five million pesos
3 multiple choice options
The members of the Board shall hold office for a term of how many years?
3
3 multiple choice options
What law protects the Architect form the reproduction of copies of the contract?
Intellectual Property
3 multiple choice options
What do you call an Architect who wishes to practice architecture and is registered with the DTI?
Sole Proprietor
A permit secured prior to the Occupancy of a building?
Occupancy permit
3 multiple choice options
Under the NBC, a building permit shall expire if work authorized is commenced within how long from date of such permit?
12 months
3 multiple choice options
Under the NBC, a building permit shall expire if work authorized is abandoned or suspended at any time after a commencement for a period of
120 days
3 multiple choice options
Under the NBC, habitable rooms provided with artificial ventilation for buildings of more than one-storey shall have a minimum ceiling height of the first storey at:
2.70 mts
2 multiple choice options
A newspaper editor approaches an architect for an interview. Which among is not an ethical thing to do.
Both a & b
3 multiple choice options
You had a project for a client, a residential building. After the construction, you found out that the client used your design for another project without your consent. What will you do?
Ask to be paid for the design
3 multiple choice options
Situation (61-62): A 5th year Architecture student is asked and contracted by his aunt to design a 2 storey residence for her. After the student finished preparing all the Architectural plans, he asks his professor to sign and seal it. The professor agrees to do it for a sum of Php 6,000. Is there anything
wrong with this practice? If yes, who is liable?
All the parties are liable.
3 multiple choice options
What is the case if ever?
Guilty of Misdemeanor
3 multiple choice options
She is the first women National President of the UAP. She is also the first lady-architect to be elected as Chairperson of the Architects Regional Council of Asia or ARCASIA composed of 17 member countries in Asia.
Yolanda D. Reyes, fuap
3 multiple choice options
How long will it takes if you are going to renew your PID (professional ID) in PRC?
2 days
1 multiple choice option
What is being stated in SPP document 203.1?
Architectural Interior (AI) services
3 multiple choice options
Which is NOT part or scope of Architectural Interior (AI)?
Eaves
3 multiple choice options
What is the meaning of CLUP?
Comprehensive land use plan
3 multiple choice options
What government body is responsible in Subdivision & Condominium Law?
HLURB
3 multiple choice options
What is the R.A. No. 9266 known for?
Architecture Act of 2004
3 multiple choice options
Which of the following is not the Architect's Responsibilities to his Client?
Engineer
3 multiple choice options
When the client didn't pay the architect on time of his/her billing what must the architect do?
Explain the client about the schedule of payment
3 multiple choice options
In relation to Manufacturer's, Dealers & Agents, which of the following is NOT included on Architect's Responsibilities?
Get commissions
3 multiple choice options
What government body will you consult if you want to have a water line in your project?
MWSS
3 multiple choice options
What method of compensation should you must use if you are doing the PRE-DESIGN
SERVICES?
Multiple of Direct Personnel Expense
3 multiple choice options
Who is responsible in applying for building permit for regular services of architect?
Owner
3 multiple choice options
Which of the following is NOT the scope of SPECIALIZED ARCHITECTURAL SERVICES?
Architectural Programming
3 multiple choice options
78. Under the 2004 Revised IRR of the 1977 NBCP that took effect on 01 May 2005, what is the number of the section and its subsection that provides for the signing and sealing of architectural documents?
None of the choices
3 multiple choice options
What is the date of the Writ of Preliminary Injunction (WPI) issued against Sections 302.3 and 302.4 of the 2004 Revised IRR of the 1977 NBCP?
22 May 2005
3 multiple choice options
With what Republic Act (R.A.) was said section and subsection of the 2004 Revised IRR of the 1977 NBCP harmonized?
Republic Act No. 9266
3 multiple choice options
Under Rule VII of the 2004 Revised IRR of the 1977 NBCP, what are explicitly prohibited for low density residential (R-1) buildings/ structures?
Firewalls
3 multiple choice options
Based on the NBCP, What is the spire height limit for a building?
6 meters
3 multiple choice options
Under Rule VIII of the 2004 Revised IRR of the 1977 NBCP, what is the meaning of the acronym
MACA?
Maximum Allowable Construction Area
3 multiple choice options
Which Rule under the 2004 Revised IRR of the 1977 NBCP prescribes that for each type of building use/ occupancy, the Allowable Maximum Total Gross Floor Area (TGFA) shall be the product of the Building Height Limit (BHL) and the Allowable Maximum Building Footprint (AMBF)?
Rule VII
3 multiple choice options
Under Sec. 302.4 of the 2004 Revised implementing rules and regulations (IRR) of the 1977 National Building Code of the Philippines (NBCP, otherwise known as Presidential Decree or P.D. No. 1096), which of the following is NOT considered an architectural plan/ drawing?
Structural Plan
3 multiple choice options
What are the two cases which invalidates the building permit,
I - when construction does not
commence within one year from the date of its issue;
II - when construction is suspended for more than one year;
III - when construction is suspended for six months;
IV - when construction is suspended or abandoned for a period of 120 days?
I and IV
3 multiple choice options
What document is necessary in order to legally occupy a building?
Certificate of occupancy
3 multiple choice options
What is the minimum height of ceilings for spaces that are naturally ventilated?
2700mm
3 multiple choice options
What is the minimum height of ceilings for spaces that are NOT naturally ventilated.
2400mm
3 multiple choice options
Which is a reason or ground for non-issuance, suspension or revocation of a building permit?
Errors found in plans and specifications
3 multiple choice options
What document is necessary in order to legally occupy a building with a change of occupancy?
Certificate of occupancy
3 multiple choice options
After passing the board exam a Singaporean Architect offer you to be partner for his architectural office in Manila, what would you do?
Yes, I would join for collaborative practice
3 multiple choice options
Which office issue certificate of height clearance for buildings located within approach and departure zones of airports which are mandated last 2008?
Civil Aviation Authority of the Philippines
3 multiple choice options
Under the 1977 NBCP, what are the maximum riser and tread dimensions (in meters) of a stairway?
0.2 and 0.25
3 multiple choice options
When must the Architect properly locate/site building with respect to the topography of a site, the
natural drainage characteristics of a site and a like?
On the onset of the project.
3 multiple choice options
How many years of imprisonment for guilty of misdemeanor in the practice of Architecture?
not less than 6 months, or not exceeding 6 years or both.
3 multiple choice options
What Section in RA9266 states the Liability of Representatives of Non-Registered Persons?
Section 31
3 multiple choice options
What Section in RA9266 states the Ownership of Plans, Specifications and Other Contract Documents?
Section 33
3 multiple choice options
What Section in RA9266 states the Enforcement of the Act?
Section 44
3 multiple choice options
Head of construction assigned by the owner & attends meetings when the owner is out of the country.
Project Manager
3 multiple choice options
Who pays the expenses for the scale model?
Owner
3 multiple choice options
The bottom line of all signboards adjacent to each other shall follow a common base line as determined by the?
Building Official
3 multiple choice options
What Government Program does former VP Binay facilitate?
National Housing Authority
3 multiple choice options