MCHE 3920 Week 2: Intro and Product Disassembly Studies

0.0(0)
studied byStudied by 0 people
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
Card Sorting

1/33

flashcard set

Earn XP

Description and Tags

MCHE 3920 Week 2: Intro and Product Disassembly Studies

Study Analytics
Name
Mastery
Learn
Test
Matching
Spaced

No study sessions yet.

34 Terms

1
New cards

OEMs- manufacturing specialists and designers had similar goals

Until about 1980, most designers worked for or closely w/ _________

2
New cards

outsourced

today, most manufacturing is ______

3
New cards

incentive

Outsourcing means the designer must be knowledgeable ab manufacturing processes bc outsourcers are typically only experts in their particular method and have no ________ to inform the designer of his or her diff options

4
New cards

function, quality, cost

Design process is iterative and involves continutal tradeoffs between ______, _______, and ______

5
New cards

-materials, shape size; production volume; look and feel

FUNCTION: can it be done?

6
New cards

tolerances, defects, properties, reproducibility

QUALITY:

7
New cards

part price, investment, time to market, ecological costs

COST:

8
New cards

optimization

Design is an ________ process

9
New cards

weighted

F, Q, C attributes may be ________ differently

10
New cards

principle, methods, equipment

Classify methods under a hierarchy of:

11
New cards

manufacturing principle

i.e.; metals casting

12
New cards

manufacturing method

i.e.; sand casting, LP Die casting, HP die casting…

13
New cards

manufacturing equipment

i.e.; sand casting machine

14
New cards

Belgium, 2009, 4000

bus shelter facts: manufactured in ________, introduced in ________, more than________ installed

15
New cards

modular

Bus shelter design reqs: ________ design to allow a variety of sizes, shapes, and colors w same basic comps

16
New cards

20

Bus shelter: designed to last ________ years

17
New cards

729, 168, 575

Bus shelter: total parts________, ________ product-specific parts manufactured for bus shelter only, ________ fasteners

18
New cards

bought-in OR off-the-shelf

parts that aren’t product-specific

19
New cards

cast

For more complex geometries:

20
New cards

extruded

For medium complexity:

21
New cards

sheet metal

for simple geometries:

22
New cards

sand casting

all castings ALUMINUM using ________ method

23
New cards

complex geometries

sand casting: good choice for ________ and production volumes involved for aluminum

24
New cards

integration

Extrusions are PRODUCT-SPECIFIC: allows for ________ of assembly features into extruded profile

25
New cards

blanking, universal

Sheet metal: made of low carbon steel- ________ is first cut to size. Four edges bent into shape. can be done w ________ equipment

26
New cards
27
New cards

18, 50000

Fume extraction hood: development took ________ months, target production is ________ units/year for 5 years

28
New cards

wall-mounted, low, vent to outside

extraction hood requires: easy ________ installation, ________ weight, no ________,

29
New cards

124, 22, 59

extraction hood: total parts ________, ________ product-specific made by injection molding, ________ fasteners

30
New cards

form freedom, optimized strength and color choice

injection molding offers:

31
New cards
32
New cards
33
New cards
34
New cards