ADV SIA Midterms

0.0(0)
studied byStudied by 11 people
0.0(0)
full-widthCall with Kai
GameKnowt Play
New
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
Card Sorting

1/137

encourage image

There's no tags or description

Looks like no tags are added yet.

Study Analytics
Name
Mastery
Learn
Test
Matching
Spaced

No study sessions yet.

138 Terms

1
New cards

warehouse

a facility for storing goods used by manufacturers, importers, exporters, wholesalers, transport, and customs

2
New cards

SAP warehouse management (WM)

is a solution to manage standard warehouses, including stock/bin locations management, picking and packing strategies, and shipping

3
New cards

true

(T/F) WM integrates all the functions of a warehouse and streamlines them

controls virtually anything that comes and leaves the warehouse and how fast and slow that is

4
New cards
  • manages the structure of the warehouse

  • monitors the movement of stock and process their differences

  • allows for easy management of potentially hazardous material

  • processes all transactions carried in the warehouse

  • manages inventory at the storage bin level

these are the 5 specific functions of SAP WM

5
New cards

key component for supply chain management

a warehouse management system such as SAP WM serves as a ___ as it offers real time visibility into an entire inventory in the warehouse and in transit

6
New cards
  • client

  • company code

  • plant

  • storage location

  • warehouse number

  • storage type

  • storage selection

  • picking area

  • warehouse door

  • allocation zone

  • shipping point

  • storage bin

these are the 12 components in the organizational structure of SAP WM

7
New cards

client

an independent environment in the systen

8
New cards

company code

the smallest organizational unit where a legal set of books can be maintained

9
New cards

plant

the operating area of a branch within the company. can be manufacturing, distribution, purchasing, or maintenance facility

10
New cards

storage location

an organized unit allowing differentiation between the various stocks of material in a plant

11
New cards

warehouse number

identifies a complex, physical warehouse structure within the warehouse management system

12
New cards

yes

is the warehouse number the highest level of organizational unit in warehouse management?

13
New cards

storage type

is a subdivision of a complex and physical warehouse

14
New cards

by its warehousing techniques, the form of the organization, or its function

how is the storage type identified?

15
New cards

storage section

a logical or physical subdivision of a storage type

16
New cards

a series of similar storage bins

the storage section also groups a series of what?

17
New cards

picking area

groups storage bins together from the standpoint of picking strategies

18
New cards

warehouse door

marks the point where the means of transport change to internal transportation

19
New cards

allocation zone

a temporary storage of goods that have just arrived or will be shipped soon

20
New cards

shipping point

responsible for the type of shipping, necessary shipping materials, and the means of transport

21
New cards

storage bin

the smallest addressable unit in a warehouse, identifies the location in the warehouse where goods can be stored

22
New cards

true

(T/F) the lowest level of WM organizational structure is the storage bin

23
New cards
  • storage bin

  • material

  • hazard

  • batch

these are the 4 master data involved in SAP WM

24
New cards

storage bin master data

this master data has 2 different organizational levels, including warehouse level and storage type level

25
New cards

warehouse level

contains all indicators and fields valid for the whole warehouse

26
New cards

storage type level

contains all indicators that are only valid for specific storage types

27
New cards
  • general data

  • storage bin data

  • status

a storage bin has three types of data, which are?

28
New cards

warehouse, storage type, storage bin number

in a storage bin, general data includes these:

29
New cards

storage section, picking area, fire-containment section, bin type, max weight)

in a storage bin, the storage bin data includes these:

30
New cards

blocked for putaway, stock removal block, blocking reason

in a storage bin, the status includes these:

31
New cards

quant

is the smallest addressable unit of measurement for a material in SAP S4/HANA

32
New cards
  • general data

  • stock data

  • block indicator

quant also has three types, which are?

33
New cards

general data

in quant, what type includes the following?

  • material, plant/storage location

  • batch

  • warehouse

  • storage type

  • storage bin

34
New cards

stock data

in quant, what type includes the following?

  • total stock

  • available stock

35
New cards

block indicator

in quant, what type includes the following?

  • block

  • putaway/removal status

36
New cards

material master

contains all the information a company needs to manage a material

37
New cards

true

(T/F) material master is used by most components within the SAP system, including SD, MM, PP, PM, CO, QM

38
New cards

hazard master data

stores the data concerning hazardous materials such as flammable liquids and toxic and radioactive materials

39
New cards
  • stroge class

  • water pollution class

  • flash point

  • aggregate state

  • hazardous materials warning

  • hazardous substance number

the general data in hazard master data includes these 6:

40
New cards

batch master data

is a subset of material or homogenous series of unreproducible units with a unique specification

41
New cards
  • expiration date

  • inspection date

  • trading data

  • administration data

  • text data

in batch master data, what does basic data 1 & 2 involve?

42
New cards
  • classification of batch

  • material data

aside from basic data 1 & 2, what else does batch master data have?

43
New cards

transfer posting

this occurs during stock to stock, material to material, and consignment to warehouse organizational levels

44
New cards

true

(T/F) once a transfer is done, changes in the stock type and material and batch number of the goods can be observed

45
New cards

stock transfer

a ___ can take place at three organizational levels:

  • storage location to storage location

  • plant to plant

  • company code to company code

46
New cards

storage location to storage location

transfer wherein stock is transferred between 2 storage locations within a plant

47
New cards

plant to plant

stock is transferred between 2 plants belonging to the same company code

48
New cards

company code to company code

transfer wherein stock is transferred between two plants assigned to different company codes

49
New cards

true

(T/F) transfer postings should not involve physical goods movement; however, in stock transfers, there is always a physical goods movement

50
New cards
  • one-step procedure

  • two-step procedure

in goods movement, these are the two procedures:

51
New cards

one-step procedure

the ___ does 2 steps simultaneously during a stock transfer from the issuing organizational levels to the receiving organizational level

52
New cards

it doesn’t. it goes directly to stock of the receiving organizational level

does the one step procedure use stock in transfer?

53
New cards

two-step procedure

shows 2 separate steps during a stock transfer, using the stock in transfer this time

54
New cards

stock transport order (STO)

is a purchase order used to request or instruct a plant to transport material from one plant to another (to affect a long-distance physical stock transfer) within the same corporate enterprise

55
New cards

purchase order

is the same as a stock transport order since these are technically purchased goods from the other plant, but it is a transport because the plants are under the same company code

56
New cards

allows delivery costs incurred due to the stock transfer to be charged to the material transported

what does the stock transport order allow?

57
New cards

posting change notice (PCN)

ie generated by posting change process in WM administered stocks

58
New cards

transfer requests

PCN has similar functionalities to ___ which record the information based on the type of change, purpose of transport, the category of request, and target system

59
New cards

transfer requirement (TR)

is a request to transfer materials at a particular time from a source storage bin to a destination storage bin in a warehouse complex

60
New cards

the expected and scheduled goods movement in WM

what does transfer requirement represent?

61
New cards

by postings in inventory management and consist of a transfer request header and line items

how is a transfer requirement generated?

62
New cards

transfer order (TO)

the central documents for WM, as every material movement requires it

63
New cards

no

does transfer order have a difference between real and logical movement?

64
New cards

true

(T/F) the creation of a transfer order depends on its preceding document, such as a transfer request, posting change notice, outbound delivery, or an inbound delivery

65
New cards

it can be manual, direct, and automatic

a transfer order creation can be what?

66
New cards

SAP project management or project system (PS)

oversees projects, tasks, and timelines while identifying critical paths, assigning resources, and tracking progress

67
New cards

it doesn’t. it inherits the organizational structures via assignment into organization units in the enterprise architecture

does SAP PS have an organizational structure?

68
New cards

true

(T/F) the PS module is integrated into the finance and logistics modules. productivity of PS is created thru integration of other SAP modules

69
New cards

true

(T/F) SAP PS master data includes master data unique to itself

70
New cards

projects

this master data details the project characteristics that include complexity, uniqueness, risk, goal-oriented, time restriction, cost, capacity, strategic meaning, and quality standards

71
New cards

customer projects, overhead cost projects, investment projects

project types include what?

72
New cards

projects

these are complex tasks found in several components of the SAP system such as SD, CO, FI, and MM

73
New cards

project builder

is a SAP tool that allows users to edit projects quickly and efficiently

74
New cards

true

(T/F) a project builder is where all data is prepared using only 1 transaction

75
New cards

WBS element

this describes either a concrete activity or a sub-activity that can be further subdivided into work

76
New cards

true

(T/F) WBS means work breakdown structure

77
New cards

work project

is a quantitative and qualitative description of an activity to be carried out in the project, such as work to be done and result to be achieved for clearly defined task within the project

78
New cards
  • released

  • unlocked

  • technically complete

  • closed

  • deletion flag

  • fully invoiced

these are the 6 possible statuses for WBS elements

79
New cards

released

a WBS elements status, entry of effective costs possible

80
New cards

closed

a WBS elements status, processes in logistics and finance

81
New cards

fully invoiced

a WBS elements status, further invoices can be inhabited

82
New cards

hierarchy graphic

consists of access sequences and relationships

83
New cards

hierarchy graphic

forms the bases for planning based on costs, revenues, payments, budgets, and schedules

84
New cards

true

(T/F) hierarchy graphic can be structured in functions, objects and phases like conceptual design, overall planning, or permissions

85
New cards
  • when structuring objects, objects with the same features can be displayed using a separate hierarchical structure project summarization

  • when planning is done using processes that are assigned to WBS elements

in the hierarchy, WBS elements are subordinated based on the following:

86
New cards

access sequences in external processing, internally processed activities to externally processed ones

hierarchy graphic allows the possibility to create ___ and enable the change of ___

87
New cards

activities

can be linked together by relationships to establish a chronological order

88
New cards

network

the resulting arrangement structure of activities is called a ___

89
New cards
  • internally and externally processed activities

  • general costs activities

the project system distinguishes between the following activity types:

90
New cards
  • duration

  • defined start and finish

  • processed without interruption

  • needs for resources to execute them

  • costs

the german standard DIN 69900 describes activities as components of a process with the following characteristics

91
New cards

relationships

these describe the chronological sequence in a network plan order standard network

92
New cards

true

(T/F) in relationships, there can be dependencies of a technical or logical nature

93
New cards
  • normal series

  • start series

  • finish series

  • bounding series

the relationship between activities in a project are defined by these sequence types:

94
New cards

normal series

from the end of one series to the beginning of another

95
New cards

start series

from the beginning of one series to the beginning of another

96
New cards

finish series

starting at the end of one series and going to the end of another series

97
New cards

bounding series

from the beginning of one series to the end of another series

98
New cards
  • finish - start (FS)

  • start - start (SS)

  • finish - finish (FF)

  • start - finish (SF)

these are the 4 relationship types that determine how the activities are linked

99
New cards

finish - start (FS)

the relationship between the end of an activity to the beginning of the following activity

100
New cards

start - start (SS)

the relationship between the beginning of an activity to the beginning of the following activity