1/48
Looks like no tags are added yet.
Name | Mastery | Learn | Test | Matching | Spaced | Call with Kai |
|---|
No analytics yet
Send a link to your students to track their progress
The LEED project team has determined that it is possible to achieve
LEED Platinum by pursuing an innovative glazing strategy that will not only improve
indoor occupant comfort, but also materially reduce carbon emissions while saving
20% on certain project costs. The strategy is not acceptable or compliant with
current local building code. What should the LEED project team do?
Abandon the strategy and pursue one that is compliant with local code
A project team has implemented a graywater recycling system for toilets
where rainwater is collected and then routed from the roof to the toilets for 100% of
toilet flushing. The team has also designed the men’s restroom with waterless
urinals. How much graywater is being saved per flush beyond the baseline with the
urinals?
1.0 gpf
Conventional buildings that are outdated and/or poorly designed may not only be
less efficient than green buildings, but also may result in negative impacts to employee
productivity, such as increased employee absenteeism and sickness. In the U.S.,
buildings account for:
• 12% of total water consumption
• 68% of electricity consumption
• 38% of CO2 emissions
• 60% of non-industrial waste generation
• 40% of energy use
Green buildings may:
• Reduce energy use by 30%
• Reduce carbon emissions by 35%
• Reduce water use by 30-50%
• Reduce waste output by 50-90%
• Boost employee productivity by 7-16%
??
• Buildings become LEED certified (people or products do not receive certification)
• Individuals become LEED accredited (as opposed to certified)
• Firms become USGBC national members (people can become members of local
chapters)
What are each project size requirements
a. BD+C and O+M must be at least 1,000 square feet
b. ID+C must be 250 square feet
c. Neighborhoods must have at least 2 habitable buildings and no larger than
1500 acres
d. Homes must be considered “dwelling units” by applicable codes
What tasks does the project administrator perform
•Invite team members to join the project through LEED Online
• Assign team members to complete LEED project credit and prerequisite
documentation
• Submit the project application to GBCI for review
**Does not need accreditation to be this**
How much does a CIR cost
$220
Who can submit a Credit Interpretation Request?
Anyone on the project team who has access to LEED Online
For which of the following should the LEED project use the 40/60 rule?
Which rating system to use
Which of the following can become LEED accredited?
People
A 750 square foot new construction project earned 62 points toward LEED
certification. Which of the following certification levels did it achieve?
None
Which LEED rating system requires on-site inspection prior to certification?
LEED for Homes
According to the Integrative Project Planning and Design prerequisite, when
should the design charrette preferably be held?
Before the design phase
In addition to the four professionals assigned to the Integrated Project Team
who must participate?
Owner or owner’s representative
Which of the following is not a benefit of Integrative Project Planning and
Design?
Lower LEED certification costs
What is the minimum duration of the Design Charrette to consider it eligible to
meet the prerequisite / credit?
4 hours
The health mission statement is applicable for:
Healthcare projects
Which of the following is NOT an alternative fuel vehicle?
A Diesel sedan
A Low Emitting and Fuel Efficient Vehicle must meet which of the following
requirements?
A minimum green score of 45
A LEED certified building has 100 full time employees, 200 part time
employees, and 100 peak time customers. How many bike storage spaces does it
need to earn the Location & Transportation, Bicycle Facilities credit?
13
Which of the following does NOT reduce heat island effect?
Roof with a low solar reflectance index (SRI) value
Which of the following LEED credits could prevent eutrophication?
Rainwater Management
Which of the following credits promotes biodiversity?
Site Development - Protect or Restore Habitat
The ASTM E-1527-05 Phase I Environmental Site Assessment determines which
type of land?
Contaminated land
Open space is defined as:
The project’s property area minus the development footprint
For the Indoor Water Use Reduction credit, the baseline for lavatory toilets
(water closets) is:
1.6 Gallons per flush
What does WaterSense certification indicate about a toilet?
That the product uses 20% less water than the average toilet on the market
Dual flush toilets save water by:
Using less water for liquid waste and more for solid waste
The local law prohibits rainwater harvesting, but the LEED project team has
incorporated it into the building design and will be able to earn Water Efficiency
credits by doing so. What should the project team do?
Eliminate rainwater harvesting from the design
Which are considered Full Time Equivalent (FTE) occupants
when calculating indoor water use for Indoor Water Use Reduction?
Full time employees, Part time employees, Primary school students
Refrigerants are lost to the atmosphere according to which process?
Refrigerants are lost because of leaks in refrigeration or air conditioning equipment
On-site renewable energy is often more expensive than Green Power (such as
renewable energy certificates) because:
On-site renewable energy has high upfront installation and materials costs, whereas
those costs are spread over many customers with off-site green power
How is the baseline defined?
The amount of energy or water the building would consume if it used traditional
materials
Which of the following does not contribute to a building’s energy efficiency?
Purchasing green power
Which is the following is NOT considered on-site renewable energy?
Forestry biomass (other than mill residue)
Which of the following is not regulated for volatile organic compounds (VOCs)
by LEED?
Exterior walls
What credits require non-regularly occupied space to be defined?
Daylight, Quality Views
The Sheet Metal and Air Conditioning National Contractors Association
provides guidelines for which of the following?
Indoor air quality
What does the ANSI Standard S12.60–2010 standard address?
Acoustics
The Cradle to Cradle certification applies to which LEED credit?
Building Product Disclosure and Optimization - Material Ingredients
Bio-based products must meet which standard in order to comply with
Sourcing of Raw Materials - Leadership Extraction Practices?
Sustainable Agriculture Standard
Which of the following is an example of post-consumer recycled content?
Flooring made from used car tires
Which of the following is NOT considered a material stream to be managed
under Construction and Demolition Waste Management?
Landfill soil
How many points can a project earn for having a LEED Green Associate as a
principal participant in the design process?
0
What is required when submitting an Innovation credit?
Intent of proposed credit, Proposed submittals for the credit, Design approach to achieve the proposed credit
examples of how to achieve Innovation credits?
Using 95% wood certified by the Forest Stewardship Council, Using a strategy not addressed in the rating system to achieve environmental
benefits
Which of the following credits is not eligible for Exemplary Performance?
Minimum Energy Performance
Out of the six available credits in the Regional Priority Category, maximum how
many points can a project earn?
4