Poplar Education Practice Questions

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/48

encourage image

There's no tags or description

Looks like no tags are added yet.

Last updated 3:20 AM on 3/20/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai

No analytics yet

Send a link to your students to track their progress

49 Terms

1
New cards

The LEED project team has determined that it is possible to achieve

LEED Platinum by pursuing an innovative glazing strategy that will not only improve

indoor occupant comfort, but also materially reduce carbon emissions while saving

20% on certain project costs. The strategy is not acceptable or compliant with

current local building code. What should the LEED project team do?

Abandon the strategy and pursue one that is compliant with local code

2
New cards

A project team has implemented a graywater recycling system for toilets

where rainwater is collected and then routed from the roof to the toilets for 100% of

toilet flushing. The team has also designed the men’s restroom with waterless

urinals. How much graywater is being saved per flush beyond the baseline with the

urinals?

1.0 gpf

3
New cards

Conventional buildings that are outdated and/or poorly designed may not only be

less efficient than green buildings, but also may result in negative impacts to employee

productivity, such as increased employee absenteeism and sickness. In the U.S.,

buildings account for:

• 12% of total water consumption

• 68% of electricity consumption

• 38% of CO2 emissions

• 60% of non-industrial waste generation

• 40% of energy use

4
New cards

Green buildings may:

• Reduce energy use by 30%

• Reduce carbon emissions by 35%

• Reduce water use by 30-50%

• Reduce waste output by 50-90%

• Boost employee productivity by 7-16%

5
New cards

??

• Buildings become LEED certified (people or products do not receive certification)

• Individuals become LEED accredited (as opposed to certified)

• Firms become USGBC national members (people can become members of local

chapters)

6
New cards

What are each project size requirements

a. BD+C and O+M must be at least 1,000 square feet

b. ID+C must be 250 square feet

c. Neighborhoods must have at least 2 habitable buildings and no larger than

1500 acres

d. Homes must be considered “dwelling units” by applicable codes

7
New cards

What tasks does the project administrator perform

•Invite team members to join the project through LEED Online

• Assign team members to complete LEED project credit and prerequisite

documentation

• Submit the project application to GBCI for review

**Does not need accreditation to be this**

8
New cards

How much does a CIR cost

$220

9
New cards

Who can submit a Credit Interpretation Request?

Anyone on the project team who has access to LEED Online

10
New cards

For which of the following should the LEED project use the 40/60 rule?

Which rating system to use

11
New cards

Which of the following can become LEED accredited?

People

12
New cards

A 750 square foot new construction project earned 62 points toward LEED

certification. Which of the following certification levels did it achieve?

None

13
New cards

Which LEED rating system requires on-site inspection prior to certification?

LEED for Homes

14
New cards

According to the Integrative Project Planning and Design prerequisite, when

should the design charrette preferably be held?

Before the design phase

15
New cards

In addition to the four professionals assigned to the Integrated Project Team

who must participate?

Owner or owner’s representative

16
New cards

Which of the following is not a benefit of Integrative Project Planning and

Design?

Lower LEED certification costs

17
New cards

What is the minimum duration of the Design Charrette to consider it eligible to

meet the prerequisite / credit?

4 hours

18
New cards

The health mission statement is applicable for:

Healthcare projects

19
New cards

Which of the following is NOT an alternative fuel vehicle?

A Diesel sedan

20
New cards

A Low Emitting and Fuel Efficient Vehicle must meet which of the following

requirements?

A minimum green score of 45

21
New cards

A LEED certified building has 100 full time employees, 200 part time

employees, and 100 peak time customers. How many bike storage spaces does it

need to earn the Location & Transportation, Bicycle Facilities credit?

13

22
New cards

Which of the following does NOT reduce heat island effect?

Roof with a low solar reflectance index (SRI) value

23
New cards

Which of the following LEED credits could prevent eutrophication?

Rainwater Management

24
New cards

Which of the following credits promotes biodiversity?

Site Development - Protect or Restore Habitat

25
New cards

The ASTM E-1527-05 Phase I Environmental Site Assessment determines which

type of land?

Contaminated land

26
New cards

Open space is defined as:

The project’s property area minus the development footprint

27
New cards

For the Indoor Water Use Reduction credit, the baseline for lavatory toilets

(water closets) is:

1.6 Gallons per flush

28
New cards

What does WaterSense certification indicate about a toilet?

That the product uses 20% less water than the average toilet on the market

29
New cards

Dual flush toilets save water by:

Using less water for liquid waste and more for solid waste

30
New cards

The local law prohibits rainwater harvesting, but the LEED project team has

incorporated it into the building design and will be able to earn Water Efficiency

credits by doing so. What should the project team do?

Eliminate rainwater harvesting from the design

31
New cards

Which are considered Full Time Equivalent (FTE) occupants

when calculating indoor water use for Indoor Water Use Reduction?

Full time employees, Part time employees, Primary school students

32
New cards

Refrigerants are lost to the atmosphere according to which process?

Refrigerants are lost because of leaks in refrigeration or air conditioning equipment

33
New cards

On-site renewable energy is often more expensive than Green Power (such as

renewable energy certificates) because:

On-site renewable energy has high upfront installation and materials costs, whereas

those costs are spread over many customers with off-site green power

34
New cards

How is the baseline defined?

The amount of energy or water the building would consume if it used traditional

materials

35
New cards

Which of the following does not contribute to a building’s energy efficiency?

Purchasing green power

36
New cards

Which is the following is NOT considered on-site renewable energy?

Forestry biomass (other than mill residue)

37
New cards

Which of the following is not regulated for volatile organic compounds (VOCs)

by LEED?

Exterior walls

38
New cards

What credits require non-regularly occupied space to be defined?

Daylight, Quality Views

39
New cards

The Sheet Metal and Air Conditioning National Contractors Association

provides guidelines for which of the following?

Indoor air quality

40
New cards

What does the ANSI Standard S12.60–2010 standard address?

Acoustics

41
New cards

The Cradle to Cradle certification applies to which LEED credit?

Building Product Disclosure and Optimization - Material Ingredients

42
New cards

Bio-based products must meet which standard in order to comply with

Sourcing of Raw Materials - Leadership Extraction Practices?

Sustainable Agriculture Standard

43
New cards

Which of the following is an example of post-consumer recycled content?

Flooring made from used car tires

44
New cards

Which of the following is NOT considered a material stream to be managed

under Construction and Demolition Waste Management?

Landfill soil

45
New cards

How many points can a project earn for having a LEED Green Associate as a

principal participant in the design process?

0

46
New cards

What is required when submitting an Innovation credit?

Intent of proposed credit, Proposed submittals for the credit, Design approach to achieve the proposed credit

47
New cards

examples of how to achieve Innovation credits?

Using 95% wood certified by the Forest Stewardship Council, Using a strategy not addressed in the rating system to achieve environmental

benefits

48
New cards

Which of the following credits is not eligible for Exemplary Performance?

Minimum Energy Performance

49
New cards

Out of the six available credits in the Regional Priority Category, maximum how

many points can a project earn?

4

Explore top notes

note
Spelling, Punctuation and Grammar
Updated 783d ago
0.0(0)
note
APWH UNIT 1TOPIC 1.1 SPICE T
Updated 1266d ago
0.0(0)
note
The American Revolution
Updated 270d ago
0.0(0)
note
APHUG-All Units
Updated 532d ago
0.0(0)
note
Chapter 1- Kinetic Particle Theory
Updated 1278d ago
0.0(0)
note
Chemical Changes
Updated 1353d ago
0.0(0)
note
Spelling, Punctuation and Grammar
Updated 783d ago
0.0(0)
note
APWH UNIT 1TOPIC 1.1 SPICE T
Updated 1266d ago
0.0(0)
note
The American Revolution
Updated 270d ago
0.0(0)
note
APHUG-All Units
Updated 532d ago
0.0(0)
note
Chapter 1- Kinetic Particle Theory
Updated 1278d ago
0.0(0)
note
Chemical Changes
Updated 1353d ago
0.0(0)

Explore top flashcards

flashcards
Spelling 1
22
Updated 938d ago
0.0(0)
flashcards
Chapter 3
46
Updated 1148d ago
0.0(0)
flashcards
G1 2nd Semester Grammar Review
60
Updated 1043d ago
0.0(0)
flashcards
House part 한국어7
28
Updated 296d ago
0.0(0)
flashcards
6.1.1 Earth, Moon, & Sun System
30
Updated 937d ago
0.0(0)
flashcards
maatschappijleer p2
57
Updated 1150d ago
0.0(0)
flashcards
Geometry Midterm Review RBC
136
Updated 463d ago
0.0(0)
flashcards
Apol Obj. Test
64
Updated 1167d ago
0.0(0)
flashcards
Spelling 1
22
Updated 938d ago
0.0(0)
flashcards
Chapter 3
46
Updated 1148d ago
0.0(0)
flashcards
G1 2nd Semester Grammar Review
60
Updated 1043d ago
0.0(0)
flashcards
House part 한국어7
28
Updated 296d ago
0.0(0)
flashcards
6.1.1 Earth, Moon, & Sun System
30
Updated 937d ago
0.0(0)
flashcards
maatschappijleer p2
57
Updated 1150d ago
0.0(0)
flashcards
Geometry Midterm Review RBC
136
Updated 463d ago
0.0(0)
flashcards
Apol Obj. Test
64
Updated 1167d ago
0.0(0)