42 Terms

1
New cards

Hoisting and access are considered top considerations in site utilities.

T

2
New cards

Sites with sand while easy to move, pose security issues

T

3
New cards

Temp. underpinning insulations are considered real schedules activities with real potential to impact the schedule.

T

4
New cards

A dewatering systems with multiple pvc pipes are installed in a sleeve around a project perimeter os called

well point

5
New cards

In a vertical build proj. which componet is the ultimate goal to release the next set of activities

building pad

6
New cards

Ultilty trenching can impact surroudning activities

T

7
New cards

Wether or not shallow foundations can be formed is primarily dependent on soil type

T

8
New cards

Since sewerlines under a footprint are gravitiy driven they would typically be installed before foundations

FALSE / sewer lines have leniance

9
New cards

dispacement cast piles

many in number, small in diameter

10
New cards

Post. tension would require less steel tonnage but the PM would need to think about time allowed to cure so tendons may be stressed.

T

11
New cards

In most multi story CIP frames, the SOG would be placed after the foudations but before the first set of verticals

F

12
New cards

permanent power availability can have a significant impact on a previous schedule based on being able to drive equipment motors at design speed, and also to provide actual permanant lighting quailty for finishies installation.

T

13
New cards

power circuit homeruns are time consuimg as they are always required to be run overhead

False

14
New cards

all of the following are electrical distrubution componets that require rough in activites, except:

- MC cable,

-EMT,

-Rigid conduit,

- bus duc

ALL

15
New cards

2 MEP trades left up to the contractor to design and coordinate

electrical and fire protection

16
New cards

MEP trades would have very few activities in finishes

F

17
New cards

In a typical vertical building project. most mep systems rough-in is overhead

T

18
New cards

MATCH

Ductwork ----> static pressure impact

DWV ------> maximum gravity pitch

Homreruns and circuits .... maximum bent and pull points

19
New cards

choose prior to interior stud framing

Overhead MEP

20
New cards

typically "heating water" activities represent shorter lengths of piping but with larger heavier comps. than chilled water

FALSE

21
New cards

most hVAC hyrdronic piping systems are in the form of an

close loop system

22
New cards

delivery of mep equipment such as VAV rarely has and impact on the schedule

False

23
New cards

typically mep activities would follow distribution activities as soon as they are completed

F (inspections)

24
New cards

which of the following is a drawback to "high pressure spiral" ductwork from a scheduling perspective

lenghthy, double walled, large

25
New cards

typically gyp board would require overhead and in wall rough in to be complete

False

26
New cards

fire protection would normally be installed as a dry pipe system

False

27
New cards

for cassions being installed at depths of 25 to 35 ft typically one drill rig team might expert to intall 1 to 2 per day

true

28
New cards

primarily connections in steel frames are in

shear

29
New cards

the staging and handling of steel is deliberate, because the double handling of member is inefficient and expensive

TRUE

30
New cards

misc. activities (moment plates etc.) in the erection of the steel are typically installed very quickly and at a fraction of the time as the steel frame tonnage

false

31
New cards

Procurment activities are considered real activities event hough they occur off site

True

32
New cards

in a steel frame building the slab on grade would always be poured before the frame is erected

FALSE

33
New cards

CIP part that most influences the schedule

cold joints

34
New cards

in multi story projects, small improvments to the duration of the CIP frame is typically have significant impact on schedule

TRUE

35
New cards

re-sharing typically impairs a CIP project schedule because its spacing can impact at what point framing and rough in activities can begin.

TRUE (its required duration to stay there can impact the next lift)

36
New cards

What releases the most work based on tributary area?

columns

37
New cards

vertical cold joints in slab spans are often a necessary ; these joints ould typically be formed as close as possible to vertical members

False

38
New cards

lag associated with wreck and reshore activities should be applied with considerations of non working days because slab occurs without repect to the work week

TRUE

39
New cards

all of the following are benefits of splitting large elevated slabs into multiple pours expect

minimize the use of pumps

40
New cards

3 things a schedule needs

Activities, Durations, Logic

41
New cards

Most MEP activities are

Finish to Start

42
New cards

Which is faster Foamglass insulation or Fiberglass insulation?

Fiberglass

Explore top notes

note
SAT VOCAB
Updated 1287d ago
0.0(0)
note
Unit Two Booklet 3
Updated 507d ago
0.0(0)
note
5.1: The Progressive Movement
Updated 1263d ago
0.0(0)
note
History Midterm Review
Updated 1159d ago
0.0(0)
note
Nutrition overview
Updated 1111d ago
0.0(0)
note
In Catilinam 1.1-1.3
Updated 570d ago
0.0(0)
note
Science test prep
Updated 1130d ago
0.0(0)
note
SAT VOCAB
Updated 1287d ago
0.0(0)
note
Unit Two Booklet 3
Updated 507d ago
0.0(0)
note
5.1: The Progressive Movement
Updated 1263d ago
0.0(0)
note
History Midterm Review
Updated 1159d ago
0.0(0)
note
Nutrition overview
Updated 1111d ago
0.0(0)
note
In Catilinam 1.1-1.3
Updated 570d ago
0.0(0)
note
Science test prep
Updated 1130d ago
0.0(0)

Explore top flashcards

flashcards
34 – Opposites
40
Updated 1140d ago
0.0(0)
flashcards
Values
22
Updated 418d ago
0.0(0)
flashcards
JFK: The New Frontier
43
Updated 880d ago
0.0(0)
flashcards
Cell Bio Exam 3
234
Updated 103d ago
0.0(0)
flashcards
A1.1 Water
33
Updated 924d ago
0.0(0)
flashcards
USH Unit 2 Review
69
Updated 195d ago
0.0(0)
flashcards
34 – Opposites
40
Updated 1140d ago
0.0(0)
flashcards
Values
22
Updated 418d ago
0.0(0)
flashcards
JFK: The New Frontier
43
Updated 880d ago
0.0(0)
flashcards
Cell Bio Exam 3
234
Updated 103d ago
0.0(0)
flashcards
A1.1 Water
33
Updated 924d ago
0.0(0)
flashcards
USH Unit 2 Review
69
Updated 195d ago
0.0(0)