1/13
Looks like no tags are added yet.
Name | Mastery | Learn | Test | Matching | Spaced | Call with Kai |
|---|
No analytics yet
Send a link to your students to track their progress
Entry Conditions

Indications and Actions of Cavitating RNS Pump(s)
(Step 3 and RNO)

RNS Intact
(Step 6)

Minimum Flow Requirements
(Step 8)

CCS Requirements to start RNS Pump
(Step 14)

RNS Flow Requirements: Pump/Hx Bypass
(Step 16)

RCP and Inventory Control
(Steps 21 & 22)

Establish Heat Sink
Steam Generator(s)/PRHR
(Step 27-30)

When to align SFS to IRWST
(Step 32)
This deep into the procedure, SFS is aligned to IRWST since only remaining heat sink is PRHR. RNS has failed and a Secondary Heat Sink is not available, Containment has been evacuated.

Containment Air Cooling
(Step 33 & 34)

Sequence of Restoring Chilled Water to Containment Recirc Fans
(Step 35)
Simply Countdown the CIV Sequence, and Supply AOV to specific fan(s) is always last

AOP-115
FOP RNS Isolation Criteria

AOP-115
FOP Safeguards Actuation Criteria

Pressurizer Heater Requirements
(Refresher)
20% Trip, 25% Reset (PLS)
66% Trip (MCC Breakers) P-19
CMT (MCC Breakers)