MGMT 361 Operations Management Exam 1 Purdue questions with complete verified solutions already graded A+

0.0(0)
studied byStudied by 0 people
0.0(0)
full-widthCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/34

encourage image

There's no tags or description

Looks like no tags are added yet.

Study Analytics
Name
Mastery
Learn
Test
Matching
Spaced

No study sessions yet.

35 Terms

1
New cards

Inventory

Flow Rate * Flow time

2
New cards

Utilization

Actual Output/design capacity

3
New cards

Efficiency

Capacity used/ effective capacity

4
New cards

Capacity

1/processing time

5
New cards

Cycle Time

1/ Flow Rate

6
New cards

Idle Time

Cycle Time-Processing time

7
New cards

Bottleneck

Min {all capacities}

8
New cards

Cycle Time

1/flow rate

9
New cards

operations management

an area of management concerned with the efficient and effective production and delivery of goods and services

10
New cards

efficient

using as little resources as needed

11
New cards

effective

meeting customer requirements

12
New cards

inputs

people. raw material, components

13
New cards

output

goods/services

14
New cards

resources

machines, workers (not incorporated in the output)

15
New cards

flow unit

basic unit that moves through a process

16
New cards

work in process

the number of flow units contained within the process

17
New cards

capacity

maximum number of units that can flow through the stage within a unit of time

18
New cards

activity time

time to process one unit by one resource

19
New cards

bottleneck

stage with smallest capacity of longest processing time

20
New cards

process capacity

how much the process can produce in a given time

21
New cards

process designed cycle time

process between two finished units leaving the process

22
New cards

what are the 5 process types?

project, job shop, batch process, line process, and continuous process

23
New cards

line balancing

reallocate tasks so that the activity time for each resource will be more or less the same

24
New cards

process capacity < demand rate

a process is supply constrained when

25
New cards

process capacity > demand rate

a process is demand constrained when

26
New cards

process capacity and demand rate

the flow rate is the minimum of

27
New cards

flow rate

the rate at which the process is delivering output

28
New cards

actual cycle time

actual time it takes for the process to generate one additional output

29
New cards

flow time

total time to go through the entire process

30
New cards

little's law

WIP = FR*FT

31
New cards

cycle time

time between consecutive units

32
New cards

inventory turns

number of times inventory is sold/used in a year

33
New cards

cost of goods sold

carrying value of goods sold during a particular period, from income statement

34
New cards

quality

the ability of a product or service to consistently meet or exceed customer expectations

35
New cards

process capability

the ability of a production process to meet or exceed preset specification