CIM 310 Test 2

0.0(0)
studied byStudied by 0 people
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
Card Sorting

1/11

encourage image

There's no tags or description

Looks like no tags are added yet.

Study Analytics
Name
Mastery
Learn
Test
Matching
Spaced

No study sessions yet.

12 Terms

1
New cards

Advantage of Central Mix Plant

Higher Production Rates

2
New cards

Plant operator responsible for:

Loading mixer and controlling discharge

3
New cards

4 element of wet plant operation

Charging Time, Mixing Time, Discharge Time, Return Time

4
New cards

Typical Mixing time for 10 yd3

2 min

5
New cards

plant equipment which gives it ability to blend ingendients before entry into mixer

efficient mixing

6
New cards

Fluid and consistent mixes provide

faster discharge

7
New cards

Central Batch Plants are capable to

start next batch while discharging

8
New cards

Slump affects amperage needeed to mix, higher amperage means

stiffer concrete

9
New cards

types of mixers

horizontal and tilt up

10
New cards

standand equipment, most part and pieces can be maintained by plant operators

In-house maintenance

11
New cards

maintenence for Batching Control Panel, electrical equipment

Specialized maintenence

12
New cards

tool to keep track of several activities in the daily operation and control of the batch plant.

daily plant log